Extension and reconstruction of provincial road No 211 on the following sections: Mojusz — Kartuzy and Smiechowo — Rokity (Q122363): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims at extending and converting the DW 211 to the parameters corresponding to the technical grade G for the following sections: from the start of the m.Mojusz to the beginning of the Trailer. 15.3 km and from the beginning of m. 5 km. The extension will not be covered by sections of the DW 211 carried out in previous years and are in good technical condition. Within the project, the project will be extended to 6-7 m and its constr...)
(‎Created claim: summary (P836): The project aims to expand and remodel DW 211 to parameters corresponding to technical class G on sections: from the beginning of m.Mojusz to the beginning of the card in length. 15.3 km and from the beginning of M. Rokita to the border of the Bytowski county (Laughter) by long. It’s 5 miles. The extension will not be covered by sections DW 211 completed in previous years and in good technical condition. The project will extend the road to 6-7 m...)
Property / summary
 
The project aims to expand and remodel DW 211 to parameters corresponding to technical class G on sections: from the beginning of m.Mojusz to the beginning of the card in length. 15.3 km and from the beginning of M. Rokita to the border of the Bytowski county (Laughter) by long. It’s 5 miles. The extension will not be covered by sections DW 211 completed in previous years and in good technical condition. The project will extend the road to 6-7 m and its construction will be reinforced to a load capacity of 100-115 kN in accordance with EU standards. Vertical and horizontal arcs will be corrected. Intersections, bus bays, foot-bike lines or bicycle paths will be rebuilt. As part of the investment, the bridge over the Łebie River and railway crossings will be reconstructed. The implementation of the project will improve road safety, reduce the number of collisions and accidents, improve traffic, improve road travel comfort, reduce travel time and increase the mobility of society. The implementation of the project will improve road safety, reduce collisions and accidents, improve traffic, improve road travel comfort and reduce travel time and increase mobility of society. (English)
Property / summary: The project aims to expand and remodel DW 211 to parameters corresponding to technical class G on sections: from the beginning of m.Mojusz to the beginning of the card in length. 15.3 km and from the beginning of M. Rokita to the border of the Bytowski county (Laughter) by long. It’s 5 miles. The extension will not be covered by sections DW 211 completed in previous years and in good technical condition. The project will extend the road to 6-7 m and its construction will be reinforced to a load capacity of 100-115 kN in accordance with EU standards. Vertical and horizontal arcs will be corrected. Intersections, bus bays, foot-bike lines or bicycle paths will be rebuilt. As part of the investment, the bridge over the Łebie River and railway crossings will be reconstructed. The implementation of the project will improve road safety, reduce the number of collisions and accidents, improve traffic, improve road travel comfort, reduce travel time and increase the mobility of society. The implementation of the project will improve road safety, reduce collisions and accidents, improve traffic, improve road travel comfort and reduce travel time and increase mobility of society. (English) / rank
 
Normal rank
Property / summary: The project aims to expand and remodel DW 211 to parameters corresponding to technical class G on sections: from the beginning of m.Mojusz to the beginning of the card in length. 15.3 km and from the beginning of M. Rokita to the border of the Bytowski county (Laughter) by long. It’s 5 miles. The extension will not be covered by sections DW 211 completed in previous years and in good technical condition. The project will extend the road to 6-7 m and its construction will be reinforced to a load capacity of 100-115 kN in accordance with EU standards. Vertical and horizontal arcs will be corrected. Intersections, bus bays, foot-bike lines or bicycle paths will be rebuilt. As part of the investment, the bridge over the Łebie River and railway crossings will be reconstructed. The implementation of the project will improve road safety, reduce the number of collisions and accidents, improve traffic, improve road travel comfort, reduce travel time and increase the mobility of society. The implementation of the project will improve road safety, reduce collisions and accidents, improve traffic, improve road travel comfort and reduce travel time and increase mobility of society. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:34, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension and reconstruction of provincial road No 211 on the following sections: Mojusz — Kartuzy and Smiechowo — Rokity
Project in Poland financed by DG Regio

    Statements

    0 references
    78,259,229.29 zloty
    0 references
    18,782,215.03 Euro
    13 January 2020
    0 references
    92,069,681.52 zloty
    0 references
    22,096,723.56 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 August 2014
    0 references
    30 April 2020
    0 references
    WOJEWÓDZTWO POMORSKIE
    0 references
    0 references
    Projekt ma na celu rozbudowę i przebudowę DW 211 do parametrów odpowiadających klasie technicznej G na odcinkach:od początku m.Mojusz do początku m.Kartuzy o dł. 15,3 km oraz od początku m. Rokity do granicy powiatu bytowskiego(Śmiechowo) o dł. 5 km. Rozbudową nie zostaną objęte odcinki DW 211 zrealizowane w latach ubiegłych oraz będące w dobrym stanie technicznym. W ramach projektu zostanie poszerzona jezdnia do 6-7m, a jej konstrukcja zostanie wzmocniona do nośności 100-115 kN zgodnie ze standardami występującymi w UE. Skorygowane zostaną łuki pionowe i poziome. Przebudowane zostaną skrzyżowania, wybudowane zatoki autobusowe, ciągi pieszo-rowerowe lub ścieżki rowerowe. W ramach inwestycji przebudowany zostanie most na rzece Łebie oraz przejazdy kolejowe. Realizacja projektu spowoduje poprawę bezpieczeństwa ruchu drogowego, przyczyni się do zmniejszenia ilości kolizji i wypadków, usprawni ruch, poprawi komfort podróżowania drogą, skróci czas podróży i zwiększy mobilność społeczeństwa. Realizacja projektu spowoduje poprawę bezpieczeństwa ruchu drogowego, przyczyni się do zmniejszenia ilości kolizji i wypadków, usprawni ruch, poprawi komfort podróżowania drogą oraz skróci czas podróży i zwiększy mobilność społeczeństwa. (Polish)
    0 references
    The project aims to expand and remodel DW 211 to parameters corresponding to technical class G on sections: from the beginning of m.Mojusz to the beginning of the card in length. 15.3 km and from the beginning of M. Rokita to the border of the Bytowski county (Laughter) by long. It’s 5 miles. The extension will not be covered by sections DW 211 completed in previous years and in good technical condition. The project will extend the road to 6-7 m and its construction will be reinforced to a load capacity of 100-115 kN in accordance with EU standards. Vertical and horizontal arcs will be corrected. Intersections, bus bays, foot-bike lines or bicycle paths will be rebuilt. As part of the investment, the bridge over the Łebie River and railway crossings will be reconstructed. The implementation of the project will improve road safety, reduce the number of collisions and accidents, improve traffic, improve road travel comfort, reduce travel time and increase the mobility of society. The implementation of the project will improve road safety, reduce collisions and accidents, improve traffic, improve road travel comfort and reduce travel time and increase mobility of society. (English)
    21 October 2020
    0 references

    Identifiers

    RPPM.09.03.00-22-0002/17
    0 references