Preparation of preparatory documentation for the ‘Improvement of capacity on line No 213 Reda — Hel’ (Q122353): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The preparation of the preparatory documentation for the project ‘Improvement of capacity on line No 213 Reda — Hel’, under which a detailed inventory of the line will be carried out, followed by a feasibility study in line with the standards in force (including the scope and cost of the works), the project information sheet, if it is to make a provision on the need to carry out an environmental impact assessment, also an EIA report to make fi...) |
||
Property / summary | |||
Property / summary: The preparation of the preparatory documentation for the project ‘Improvement of capacity on line No 213 Reda — Hel’, under which a detailed inventory of the line will be carried out, followed by a feasibility study in line with the standards in force (including the scope and cost of the works), the project information sheet, if it is to make a provision on the need to carry out an environmental impact assessment, also an EIA report to make financial and physical decisions on the planned regeneration and electrification of the railway line and a functional — utility programme. (English) / rank | |||
Revision as of 09:34, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Preparation of preparatory documentation for the ‘Improvement of capacity on line No 213 Reda — Hel’ |
Project in Poland financed by DG Regio |
Statements
1,289,253.88 zloty
0 references
1,516,769.28 zloty
0 references
85.0 percent
0 references
4 June 2019
0 references
30 December 2020
0 references
PKP POLSKIE LINIE KOLEJOWE S.A.
0 references
Q2515024 (Deleted Item)
0 references
Opracowanie dokumentacji przygotowawczej dla projektu „Poprawa przepustowości na linii Nr 213 Reda – Hel”, w ramach której zostanie wykonana szczegółowa inwentaryzacja linii, a następnie studium wykonalności zgodne z obowiązującymi w tym zakresie standardami (uwzględniające zakres i koszty robót), karta informacyjna przedsięwzięcia, jeśli będzie Postanowienie o potrzebie przeprowadzenia oceny oddziaływania na środowisko również raport OOŚ w celu podjęcia decyzji finansowych i rzeczowych w zakresie planowanej rewitalizacji i elektryfikacji linii kolejowej oraz przygotowany zostanie program funkcjonalno – użytkowy. (Polish)
0 references
Identifiers
RPPM.09.02.02-22-0002/18
0 references