Thermal modernisation of the Building SP No 13 at ul. The National Army 1 in Tarnowskie Górach (Q123843): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The object of the project is the comprehensive thermal renovation of the public building, which is the building at the Primary School No 13 at ul. The National Army 1 in Tarnowskie Górach. The comprehensive thermal renovation will consist of: replacement of door frames, repair of gel components, refurbishment of chimneys, warm up of the roof, the heating of the entrances, the installation of a lightning strike, the thermal of the wall and wall...)
Property / summary
The object of the project is the comprehensive thermal renovation of the public building, which is the building at the Primary School No 13 at ul. The National Army 1 in Tarnowskie Górach. The comprehensive thermal renovation will consist of: replacement of door frames, repair of gel components, refurbishment of chimneys, warm up of the roof, the heating of the entrances, the installation of a lightning strike, the thermal of the wall and walls of the wall and walls above the foot, the modernisation of the heating plant and the installation of the efficient LED lighting. The implementation of the project is designed to isolate the thermal premises and to improve the thermal conditions of the site and to improve the comfort of the use of the building as well as to reduce the need for energy needed for heating. (English)
 
Property / summary: The object of the project is the comprehensive thermal renovation of the public building, which is the building at the Primary School No 13 at ul. The National Army 1 in Tarnowskie Górach. The comprehensive thermal renovation will consist of: replacement of door frames, repair of gel components, refurbishment of chimneys, warm up of the roof, the heating of the entrances, the installation of a lightning strike, the thermal of the wall and walls of the wall and walls above the foot, the modernisation of the heating plant and the installation of the efficient LED lighting. The implementation of the project is designed to isolate the thermal premises and to improve the thermal conditions of the site and to improve the comfort of the use of the building as well as to reduce the need for energy needed for heating. (English) / rank
Normal rank
 

Revision as of 07:26, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the Building SP No 13 at ul. The National Army 1 in Tarnowskie Górach
Project in Poland financed by DG Regio

    Statements

    0 references
    1,915,714.78 zloty
    0 references
    459,771.55 Euro
    13 January 2020
    0 references
    2,253,782.08 zloty
    0 references
    540,907.7 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 September 2016
    0 references
    31 August 2019
    0 references
    GMINA TARNOWSKIE GÓRY
    0 references
    0 references

    50°27'55.4"N, 18°50'1.0"E
    0 references
    Przedmiotem projektu jest kompleksowa termomodernizacja budynku użyteczności publicznej, którym jest budynek Szkoły Podstawowej nr 13 przy ul. Armii Krajowej 1 w Tarnowskich Górach. Kompleksowa termomodernizacja będzie polegała na: wymianie stolarki drzwiowej, naprawie elementów żelbetowych, remoncie kominów, ociepleniu stropodachów, dociepleniu zadaszeń wejść, montażu instalacji odgromowej, ociepleniu ścian cokołu i ścian powyżej cokołu, modernizacji instalacji c.o. oraz montażu energooszczędnego oświetlenia LED. Realizacja projektu ma na celu izolację termiczną pomieszczeń oraz poprawę warunków termicznych obiektu, a także podniesienie komfortu użytkowania budynku jak również zmniejszenie zapotrzebowania na energię konieczną do jego ogrzewania. (Polish)
    0 references

    Identifiers

    RPSL.04.03.01-24-046G/17
    0 references