(‎Removed claim: summary (P836): The subject of the project is the reconstruction and extension of the Water Treatment Station in Rudnina above Sanem, as well as the further development of the water supply network in the strose settlement and to ul. The 7,60-km-long Konopnickna nad Sanem, for the development of the water supply system for the inhabitants of the municipality and the town of Ruwidk above Sanem. This project foresees construction work involving the extension and...)
(‎Created claim: summary (P836): The subject of the project is the reconstruction and expansion of the Water Treatment Station in Rudnik nad Sanem, as well as further expansion of the water supply network on the Stróża estate and on the street. Konopnicka in Rudnik nad Sanem with a length of 7.60 km, for the development of a water supply system for residents of the commune and the town of Rudnik nad Sanem. This project envisages building works including the extension and recons...)
Property / summary
 
The subject of the project is the reconstruction and expansion of the Water Treatment Station in Rudnik nad Sanem, as well as further expansion of the water supply network on the Stróża estate and on the street. Konopnicka in Rudnik nad Sanem with a length of 7.60 km, for the development of a water supply system for residents of the commune and the town of Rudnik nad Sanem. This project envisages building works including the extension and reconstruction of the existing SUW station building in Rudnik nad Sanem at ul. Stróżańska to enlarge the room of the pump hall. The area of expansion is 44.7 m², after expansion the area of the SUW will be 145.3 m² (100.6 + 44.7 m²). In addition, the development of water treatment technology located in the SUW in Rudnik nad Sanem at ul. It’s a guard. In order to ensure the required efficiency of the SUW, the project includes the implementation of works related to the reconstruction of the Water Reception at ul. Stróżańska, including a replacement well hole S-2a with a depth of 24.5 m, drilling diameter O 20, which will take over the operation of the well hole S-2 with the installation of a new deep water pump with increased capacity (30 m³/h at nominal lifting height of 22 m). The task was carried out by the Applicant in 2018, and is part of the whole task connected with the expansion of the water supply system in the commune and the town of Rudnik nad Sanem. In addition, as part of the project to increase the level of drainage of the town of Rudnik nad Sanem, the construction of a water supply network is planned, including:- at the Stróża Estate in Rudnik nad Sanem with parameters of 160,110,90,63,50,40,32 mm and a length of 7522.00 m;- on ul. Konopnicka with parameters dn 110, 90, mm and length of 85.50 m.In the area of the project, sewage management in the form of an aggregate sewer system is ensured. (English)
Property / summary: The subject of the project is the reconstruction and expansion of the Water Treatment Station in Rudnik nad Sanem, as well as further expansion of the water supply network on the Stróża estate and on the street. Konopnicka in Rudnik nad Sanem with a length of 7.60 km, for the development of a water supply system for residents of the commune and the town of Rudnik nad Sanem. This project envisages building works including the extension and reconstruction of the existing SUW station building in Rudnik nad Sanem at ul. Stróżańska to enlarge the room of the pump hall. The area of expansion is 44.7 m², after expansion the area of the SUW will be 145.3 m² (100.6 + 44.7 m²). In addition, the development of water treatment technology located in the SUW in Rudnik nad Sanem at ul. It’s a guard. In order to ensure the required efficiency of the SUW, the project includes the implementation of works related to the reconstruction of the Water Reception at ul. Stróżańska, including a replacement well hole S-2a with a depth of 24.5 m, drilling diameter O 20, which will take over the operation of the well hole S-2 with the installation of a new deep water pump with increased capacity (30 m³/h at nominal lifting height of 22 m). The task was carried out by the Applicant in 2018, and is part of the whole task connected with the expansion of the water supply system in the commune and the town of Rudnik nad Sanem. In addition, as part of the project to increase the level of drainage of the town of Rudnik nad Sanem, the construction of a water supply network is planned, including:- at the Stróża Estate in Rudnik nad Sanem with parameters of 160,110,90,63,50,40,32 mm and a length of 7522.00 m;- on ul. Konopnicka with parameters dn 110, 90, mm and length of 85.50 m.In the area of the project, sewage management in the form of an aggregate sewer system is ensured. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the reconstruction and expansion of the Water Treatment Station in Rudnik nad Sanem, as well as further expansion of the water supply network on the Stróża estate and on the street. Konopnicka in Rudnik nad Sanem with a length of 7.60 km, for the development of a water supply system for residents of the commune and the town of Rudnik nad Sanem. This project envisages building works including the extension and reconstruction of the existing SUW station building in Rudnik nad Sanem at ul. Stróżańska to enlarge the room of the pump hall. The area of expansion is 44.7 m², after expansion the area of the SUW will be 145.3 m² (100.6 + 44.7 m²). In addition, the development of water treatment technology located in the SUW in Rudnik nad Sanem at ul. It’s a guard. In order to ensure the required efficiency of the SUW, the project includes the implementation of works related to the reconstruction of the Water Reception at ul. Stróżańska, including a replacement well hole S-2a with a depth of 24.5 m, drilling diameter O 20, which will take over the operation of the well hole S-2 with the installation of a new deep water pump with increased capacity (30 m³/h at nominal lifting height of 22 m). The task was carried out by the Applicant in 2018, and is part of the whole task connected with the expansion of the water supply system in the commune and the town of Rudnik nad Sanem. In addition, as part of the project to increase the level of drainage of the town of Rudnik nad Sanem, the construction of a water supply network is planned, including:- at the Stróża Estate in Rudnik nad Sanem with parameters of 160,110,90,63,50,40,32 mm and a length of 7522.00 m;- on ul. Konopnicka with parameters dn 110, 90, mm and length of 85.50 m.In the area of the project, sewage management in the form of an aggregate sewer system is ensured. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:29, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of the water supply system in the municipality and town of Ruwidk above Sanem
Project in Poland financed by DG Regio

    Statements

    0 references
    1,193,682.37 zloty
    0 references
    286,483.77 Euro
    13 January 2020
    0 references
    1,404,332.21 zloty
    0 references
    337,039.73 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    22 March 2018
    0 references
    12 November 2020
    0 references
    GMINA I MIASTO RUDNIK NAD SANEM
    0 references
    0 references
    Przedmiotem podejmowanego projektu jest przebudowa i rozbudowa Stacji Uzdatniania Wody w Rudniku nad Sanem, a także dalsza rozbudowa sieci wodociągowej na osiedlu Stróża oraz na ul. Konopnickiej w Rudniku nad Sanem o długości 7,60 km, na potrzeby rozwoju systemu zaopatrzenia w wodę dla mieszkańców gminy i miasta Rudnik nad Sanem. W ramach niniejszego projektu przewiduje się prace budowlane obejmujące rozbudowę i przebudowę istniejącego budynku stacji SUW w Rudniku nad Sanem przy ul. Stróżańskiej w celu powiększenia pomieszczenia hali pomp. Powierzchnia rozbudowy wynosi 44,7 m2, po rozbudowie powierzchnia zabudowy SUW wynosić będzie 145,3 m2 (100,6+44,7 m2). Ponadto przewiduje się rozbudowę technologii uzdatniania wody zlokalizowanej w SUW w Rudniku nad Sanem przy ul. Stróżańskiej. W celu zapewnienia wymaganej wydajności SUW projekt obejmuje realizację prac związanych z przebudową Ujęcia Wody przy ul. Stróżańskiej, w tym wykonanie zastępczego otworu studziennego S-2a o głębokości 24,5m, średnicy wiercenia O 20, który przejmie funkcję eksploatacyjną planowanego do wyłączenia z eksploatacji otworu studziennego S-2 wraz montażem nowej pompy głębinowej o zwiększonej wydajności ( 30m3/h przy nominalnej wysokości podnoszenia 22m). Zadanie zostało zrealizowane przez Wnioskodawcę w roku 2018, stanowi element całości zadania wiązanego z rozbudową systemu zaopatrzenia w wodę na terenie gminy i miasta Rudnik nad Sanem. Dodatkowo w ramach projektu w celu podniesienia poziomu zwodociągowania miasta Rudnik nad Sanem przewiduje się budowę sieci wodociągowej, w tym:- na Osiedlu Stróża w Rudniku nad Sanem o parametrach dn 160,110,90,63,50,40,32 mm i długości 7 522,00 mb;- na ul. Konopnickiej o parametrach dn 110, 90, mm i długości 85,50 mb.Na terenie realizowanego projektu zapewniona jest gospodarka ściekowa w postaci systemu kanalizacji zbiorczej. (Polish)
    0 references
    The subject of the project is the reconstruction and expansion of the Water Treatment Station in Rudnik nad Sanem, as well as further expansion of the water supply network on the Stróża estate and on the street. Konopnicka in Rudnik nad Sanem with a length of 7.60 km, for the development of a water supply system for residents of the commune and the town of Rudnik nad Sanem. This project envisages building works including the extension and reconstruction of the existing SUW station building in Rudnik nad Sanem at ul. Stróżańska to enlarge the room of the pump hall. The area of expansion is 44.7 m², after expansion the area of the SUW will be 145.3 m² (100.6 + 44.7 m²). In addition, the development of water treatment technology located in the SUW in Rudnik nad Sanem at ul. It’s a guard. In order to ensure the required efficiency of the SUW, the project includes the implementation of works related to the reconstruction of the Water Reception at ul. Stróżańska, including a replacement well hole S-2a with a depth of 24.5 m, drilling diameter O 20, which will take over the operation of the well hole S-2 with the installation of a new deep water pump with increased capacity (30 m³/h at nominal lifting height of 22 m). The task was carried out by the Applicant in 2018, and is part of the whole task connected with the expansion of the water supply system in the commune and the town of Rudnik nad Sanem. In addition, as part of the project to increase the level of drainage of the town of Rudnik nad Sanem, the construction of a water supply network is planned, including:- at the Stróża Estate in Rudnik nad Sanem with parameters of 160,110,90,63,50,40,32 mm and a length of 7522.00 m;- on ul. Konopnicka with parameters dn 110, 90, mm and length of 85.50 m.In the area of the project, sewage management in the form of an aggregate sewer system is ensured. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.04.03.02-18-0043/18
    0 references