Installation of a photovoltaic installation and a thermal energy renovation of multi-family housing at ul. Maria Konopicka 9 and 12 in Nowa Sarzyna (Q118757): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project concerns energy modernisation of multi-family residential buildings at ul. Maria Konopnické 9 and 12 in Nowa Sarzyna, and the reduction of air pollution emitted into the atmosphere from the municipality of Nowa Szyna. Maria Konopicka 9 has been scheduled for: 1. Insulation of walls on land, 2. The insulation of the external wall, 3. Warming of the outer wall, 4. The wall of the basement of the basement, 5. Replacement of wooden win...)
(‎Created claim: summary (P836): The project concerns energy modernisation of multi-family residential buildings at ul. Maria Konopnicka 9 and 12 in Nowa Sarzyna, and reduction of pollution emitted into the atmosphere from the area of Nowa Sarzyna commune. Maria Konopnicka 9 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. Replacement of wooden windows...)
Property / summary
 
The project concerns energy modernisation of multi-family residential buildings at ul. Maria Konopnicka 9 and 12 in Nowa Sarzyna, and reduction of pollution emitted into the atmosphere from the area of Nowa Sarzyna commune. Maria Konopnicka 9 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. Replacement of wooden windows with a total area of 7.82 m² for new PVC, 6. Installation of photovoltaic cells 2 units of cells with a total area of 3.25 m², power of 250 W, total installation capacity 0.5 kW, In the building at ul. Maria Konopnicka 12 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. External ceiling warming, 6. Replacement of lighting in the common part: 48 tubes with a power output of 20 W, 7. Installation of photovoltaic cells 4 units of cells with a total area of 6.49 m², power of 250 W, total installation capacity of 1 kW, implementation of the investment will allow to obtain:a) in the building at ul. Maria Konopnicka 9 EP index at the level of 236,98 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 26.12 %,b) in the building at ul. Maria Konopnicka 12 EP index of 235,53 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 64,58 %, (English)
Property / summary: The project concerns energy modernisation of multi-family residential buildings at ul. Maria Konopnicka 9 and 12 in Nowa Sarzyna, and reduction of pollution emitted into the atmosphere from the area of Nowa Sarzyna commune. Maria Konopnicka 9 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. Replacement of wooden windows with a total area of 7.82 m² for new PVC, 6. Installation of photovoltaic cells 2 units of cells with a total area of 3.25 m², power of 250 W, total installation capacity 0.5 kW, In the building at ul. Maria Konopnicka 12 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. External ceiling warming, 6. Replacement of lighting in the common part: 48 tubes with a power output of 20 W, 7. Installation of photovoltaic cells 4 units of cells with a total area of 6.49 m², power of 250 W, total installation capacity of 1 kW, implementation of the investment will allow to obtain:a) in the building at ul. Maria Konopnicka 9 EP index at the level of 236,98 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 26.12 %,b) in the building at ul. Maria Konopnicka 12 EP index of 235,53 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 64,58 %, (English) / rank
 
Normal rank
Property / summary: The project concerns energy modernisation of multi-family residential buildings at ul. Maria Konopnicka 9 and 12 in Nowa Sarzyna, and reduction of pollution emitted into the atmosphere from the area of Nowa Sarzyna commune. Maria Konopnicka 9 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. Replacement of wooden windows with a total area of 7.82 m² for new PVC, 6. Installation of photovoltaic cells 2 units of cells with a total area of 3.25 m², power of 250 W, total installation capacity 0.5 kW, In the building at ul. Maria Konopnicka 12 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. External ceiling warming, 6. Replacement of lighting in the common part: 48 tubes with a power output of 20 W, 7. Installation of photovoltaic cells 4 units of cells with a total area of 6.49 m², power of 250 W, total installation capacity of 1 kW, implementation of the investment will allow to obtain:a) in the building at ul. Maria Konopnicka 9 EP index at the level of 236,98 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 26.12 %,b) in the building at ul. Maria Konopnicka 12 EP index of 235,53 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 64,58 %, (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:56, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of a photovoltaic installation and a thermal energy renovation of multi-family housing at ul. Maria Konopicka 9 and 12 in Nowa Sarzyna
Project in Poland financed by DG Regio

    Statements

    0 references
    1,065,841.05 zloty
    0 references
    255,801.85 Euro
    13 January 2020
    0 references
    1,253,930.75 zloty
    0 references
    300,943.38 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    13 September 2016
    0 references
    30 June 2018
    0 references
    WSPÓLNOTA MIESZKANIOWA PRZY UL. MARII KONOPNICKIEJ 9 W NOWEJ SARZYNIE
    0 references
    0 references
    Projekt dotyczy modernizacji energetycznej wielorodzinnych budynków mieszkalnych przy ul. Marii Konopnickiej 9 i 12 w Nowej Sarzynie, oraz redukcja zanieczyszczeń emitowanych do atmosfery z obszaru Gminy Nowa Sarzyna.W budynku przy ul. Marii Konopnickiej 9 zaplanowano: 1. Ocieplenie ściany na gruncie, 2. Ocieplenie ściany zewnętrznej podłużnej, 3. Ocieplenie ściany zewnętrznej szczytowej, 4. Ocieplenie ściany nad gruntem-piwnica, 5. Wymiana okien drewnianych o łącznej powierzchni 7,82 m2 na nowe PVC, 6. Instalacja ogniw fotowoltaicznej 2 sztuk ogniw o łącznej powierzchni 3,25 m2, mocy 250 W, łączna moc instalacji 0,5 kW, W budynku przy ul. Marii Konopnickiej 12 zaplanowano: 1. Ocieplenie ściany na gruncie, 2. Ocieplenie ściany zewnętrznej podłużnej, 3. Ocieplenie ściany zewnętrznej szczytowej, 4. Ocieplenie ściany nad gruntem-piwnica, 5. Ocieplenie stropodachu zewnętrznego, 6. Wymiana oświetlenia w części wspólnej: 48 lamp o mocy 20 W, 7. Instalacja ogniw fotowoltaicznej 4 sztuk ogniw o łącznej powierzchni 6,49 m2, mocy 250 W, łączna moc instalacji 1 kW, Realizacja inwestycji pozwoli na uzyskanie:a) w budynku przy ul. Marii Konopnickiej 9 wskaźnika EP na poziomie 236,98 [kWh/(m2 · rok)] oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 26,12%,b) w budynku przy ul. Marii Konopnickiej 12 wskaźnika EP na poziomie 235,53 [kWh/(m2 · rok)] oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 64,58%, (Polish)
    0 references
    The project concerns energy modernisation of multi-family residential buildings at ul. Maria Konopnicka 9 and 12 in Nowa Sarzyna, and reduction of pollution emitted into the atmosphere from the area of Nowa Sarzyna commune. Maria Konopnicka 9 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. Replacement of wooden windows with a total area of 7.82 m² for new PVC, 6. Installation of photovoltaic cells 2 units of cells with a total area of 3.25 m², power of 250 W, total installation capacity 0.5 kW, In the building at ul. Maria Konopnicka 12 is planned to: 1. Wall warming on the ground, 2. Warming of the outer longitudinal wall, 3. Warming of the outer wall of the summit, 4. Wall warming over the ground- cellar, 5. External ceiling warming, 6. Replacement of lighting in the common part: 48 tubes with a power output of 20 W, 7. Installation of photovoltaic cells 4 units of cells with a total area of 6.49 m², power of 250 W, total installation capacity of 1 kW, implementation of the investment will allow to obtain:a) in the building at ul. Maria Konopnicka 9 EP index at the level of 236,98 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 26.12 %,b) in the building at ul. Maria Konopnicka 12 EP index of 235,53 [kWh/(m²· year)] and the demand for energy consumption will be reduced by 64,58 %, (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0134/16
    0 references