Thermal modernisation of the buildings of the Care and Medical Department/Hospice in Przemyśl (Q118665): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Thermal modernisation of the buildings of the Care and Medical Department/Hospice in Przemyśl |
Revision as of 16:51, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the buildings of the Care and Medical Department/Hospice in Przemyśl |
Project in Poland financed by DG Regio |
Statements
2,944,043.3 zloty
0 references
3,463,580.37 zloty
0 references
85.0 percent
0 references
21 September 2018
0 references
31 January 2020
0 references
CARITAS ARCHIDIECEZJI PRZEMYSKIEJ
0 references
Cel główny projektu to zmniejszenie zapotrzebowania na energie cieplną oraz obniżenie kosztów eksploatacyjnych budynków nr 5 oraz nr 2 Zakładu Opiekuńczo-Leczniczego/Hospicjum przy ul. Słowackiego 85 w Przemyślu. Cel zostanie osiągnięty poprzez realizację:- w budynku 5: ocieplenia ścian zewnętrznych; ocieplenia ścian fundamentowych części A; ocieplenia podłóg na gruncie część A niskiego parteru; ocieplenia stropów część A pod niskim parterem (piwnicą); wymianę stolarki okiennej- wysokiego i niskiego parteru cz.A; wymianę stolarki drzwiowej- wysokiego parteru cz.A, modernizację instalacji centralnego ogrzewania wysokiego i niskiego parteru część A oraz modernizację ciepłej wody.- w budynku nr 2: ocieplenia ścian fundamentowych (przy gruncie), wymianę stolarki drzwiowej, docieplenie podłogi na gruncie-niskiego parteru, docieplenie ścian zewnętrznych elewacyjnych, docieplenie tarasu(dach płaski), docieplenie stropów pod nieogrzewanym poddaszem, modernizację instalacji c.w.u oraz modernizację instalacji centralnego ogrzewania, wymiana stolarki drzwiowej.- wymianę opraw świetlówek na oprawy led'owe w obu budynkach. W ramach realizacji projektu wykonano audyty energetyczne, dokumentację techniczną. Przeprowadzony zostanie nadzór inwestorski oraz audyt powykonawczy, w ramach którego przeprowadzone zostanie termowizyjne badanie ciągłości warstw izolacji termicznej budynku oraz powietrzne badanie szczelności budynku. Z uwagi na brak zgody Wojewódzkiego Urzędu Konserwacji Zabytków na ocieplenie ścian elewacyjnych budynku z użyciem materiałów ocieplających (styropianu, wełny i tp), oraz możliwością odnowienia, renowacji elewacji ścian zewnętrznych tynkiem ocieplającym zaprojektowano grubość tynku ocieplającego zapewniając uzyskanię max wartości współczynnika przenikania U [W/m2*K]. (Polish)
0 references
The main objective of the project is to reduce the demand for thermal energy and reduce the operating costs of buildings no.5 and 2 of the Care and Medical Department/Hospice at ul. Slovak 85 in Przemyśl. The objective will be achieved by:- in building 5: insulation of the outer walls; insulation of the foundation walls of Part A; warming of floors on the ground floor part A of the low ground floor; warming of the ceilings part A under the low ground floor (cellar); replacement of window joinery- high and low ground floor part A; replacement of the door carpentry- high ground floor part A, modernisation of central heating system part A and modernisation of hot water.- in building No. 2: insulation of the foundation walls (at the ground), replacement of the door carpentry, warming of the floor on the ground floor, warming of the exterior walls of the facade, warming of the terrace(flat roof), warming of ceilings under an unheated attic, modernisation of central heating system and modernisation of central heating system, replacement of door joinery.- replacement of fluorescent luminaires for led housings in both buildings. As part of the project, energy audits and technical documentation were carried out. Investor supervision and post-executive audit will be carried out, in which the thermal imaging test of the building’s thermal insulation layers and the air tightness of the building will be carried out. Due to the lack of agreement of the Provincial Office for the Preservation of Monuments for warming the facade walls of the building with warming materials (styrofoam, wool and tp), as well as the possibility of refurbishing, renovation of the facade of the exterior walls with warming plaster, the thickness of the insulation plaster was designed to achieve maximum penetration coefficient U [W/m²*K]. (English)
20 October 2020
0 references
Identifiers
RPPK.03.02.00-18-0031/18
0 references