Modernisation of the ZSP in Basni Lower and the equipment of modern ICT equipment and materials (Q119317): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project concerns investment activities to rebuild the Public School Group building in the Lower Lower House, along with the construction of a sports hall. In addition, a team of schools will be equipped with modern ICT equipment and training materials will be provided in teaching materials. The implementation of the project will create favourable conditions for the development of the school subject to the project, while at the same time im...) |
(Created claim: summary (P836): The subject of the project is investment activities aimed at rebuilding the building of the Public School Complex in Lower Basznia together with the reconstruction of the sports hall. In addition, the school team will be equipped with modern ICT equipment and equipped with teaching materials will be a natural laboratory. The implementation of the project will create favourable conditions for the development of the school covered by the project,...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is investment activities aimed at rebuilding the building of the Public School Complex in Lower Basznia together with the reconstruction of the sports hall. In addition, the school team will be equipped with modern ICT equipment and equipped with teaching materials will be a natural laboratory. The implementation of the project will create favourable conditions for the development of the school covered by the project, ensuring at the same time improving the quality and standard of teaching, as well as increasing accessibility to modern teaching methods for children from rural areas of Lubaczów. The achievement of the main objective is possible through the achievement of the specific objectives: — improving the school’s local and sports base; — access to modern scientific aid for children; — improving the energy efficiency of the building; — improving working and working conditions; — reduce the disparities in access to education. As part of the modernisation, it is planned to: the refurbishment of parts of the walls and construction, enlargement of the door holes, partial walling of window and door openings, demolition and construction of staircases, reconstruction of the main entrance, replacement of the wooden carpentry on the windows of the PCV with the replacement of the interior and exterior walls of the interior and exterior walls, the demolition of the staircase and the performance of the staircase in the constructed window window (the ceiling above the cellar and the ground floor), (English) | |||||||||||||||
Property / summary: The subject of the project is investment activities aimed at rebuilding the building of the Public School Complex in Lower Basznia together with the reconstruction of the sports hall. In addition, the school team will be equipped with modern ICT equipment and equipped with teaching materials will be a natural laboratory. The implementation of the project will create favourable conditions for the development of the school covered by the project, ensuring at the same time improving the quality and standard of teaching, as well as increasing accessibility to modern teaching methods for children from rural areas of Lubaczów. The achievement of the main objective is possible through the achievement of the specific objectives: — improving the school’s local and sports base; — access to modern scientific aid for children; — improving the energy efficiency of the building; — improving working and working conditions; — reduce the disparities in access to education. As part of the modernisation, it is planned to: the refurbishment of parts of the walls and construction, enlargement of the door holes, partial walling of window and door openings, demolition and construction of staircases, reconstruction of the main entrance, replacement of the wooden carpentry on the windows of the PCV with the replacement of the interior and exterior walls of the interior and exterior walls, the demolition of the staircase and the performance of the staircase in the constructed window window (the ceiling above the cellar and the ground floor), (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is investment activities aimed at rebuilding the building of the Public School Complex in Lower Basznia together with the reconstruction of the sports hall. In addition, the school team will be equipped with modern ICT equipment and equipped with teaching materials will be a natural laboratory. The implementation of the project will create favourable conditions for the development of the school covered by the project, ensuring at the same time improving the quality and standard of teaching, as well as increasing accessibility to modern teaching methods for children from rural areas of Lubaczów. The achievement of the main objective is possible through the achievement of the specific objectives: — improving the school’s local and sports base; — access to modern scientific aid for children; — improving the energy efficiency of the building; — improving working and working conditions; — reduce the disparities in access to education. As part of the modernisation, it is planned to: the refurbishment of parts of the walls and construction, enlargement of the door holes, partial walling of window and door openings, demolition and construction of staircases, reconstruction of the main entrance, replacement of the wooden carpentry on the windows of the PCV with the replacement of the interior and exterior walls of the interior and exterior walls, the demolition of the staircase and the performance of the staircase in the constructed window window (the ceiling above the cellar and the ground floor), (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 16:44, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the ZSP in Basni Lower and the equipment of modern ICT equipment and materials |
Project in Poland financed by DG Regio |
Statements
983,828.9 zloty
0 references
1,157,445.8 zloty
0 references
85.0 percent
0 references
15 August 2016
0 references
30 March 2018
0 references
GMINA LUBACZÓW
0 references
Przedmiotem projektu są działania inwestycyjne mające na celu przebudowę budynku Zespołu Szkół Publicznych w Baszni Dolnej wraz z przebudową sali sportowej. Dodatkowo zespół szkół zostanie wyposażony w nowoczesny sprzęt ICT i doposażony w materiały dydaktyczne zostanie pracownia przyrodnicza. Realizacja projektu stworzy korzystne warunki do rozwoju szkoły objętej projektem zapewniając jednocześnie podniesienie jakości oraz standardu nauczania, a także zwiększenie dostępności do nowoczesnych metod nauczania dla dzieci z obszarów wiejskich gminy Lubaczów. Realizacja celu głównego jest możliwa dzięki osiągnięciu celów szczegółowych: - poprawę bazy lokalowej i sportowej szkoły; - dostęp dzieci do nowoczesnych pomocy naukowych; - poprawę wydajności energetycznej budynku; - poprawa warunków prowadzenia zajęć i pracy; - zmniejszenie dysproporcji w dostępie do edukacji. W ramach modernizacji planuje się: wyburzenie części ścian działowych i konstrukcyjnych, powiększenie otworów drzwiowych, częściowe zamurowanie otworów okiennych i drzwiowych, wyburzenie oraz budowę klatki schodowej przy wejściu głównym, przebudowę wejścia głównego, wymianę stolarki okiennej drewnianej na okna PCV wraz z wymianą podokienników wewnętrznych i zewnętrznych, wyburzenie klatki schodowej oraz wykonanie stropu w powstałym szybie po klatce schodowej (strop nad piwnicą i parterem), wyburzenie wiaty, schodów i ścian oporowych przy wejściu do kotłowni oraz wykonanie nowych, wyburzenie schodów i ścian przy wejściu do pomieszczenia nr 1.21, remont szatni, remont pomieszczeń parteru, piętra i holi, wymianę instalacji c.o., wykonanie instalacji wod.-kan., budowę schodów zewnętrznych stalowych przy sali gimn, przebudowę podjazdu dla osób niepełnosprawnych przy sali gimnastycznej, wykonanie ocieplenia ściany łącznika, wykonanie ocieplenia stropodachu w części nieocieplonej, przebudowę sali gimnast., w tym przebudowę stropu w sali gimnast., odnowienie elewacji frontowej przy wejściu gł. do szkoły. (Polish)
0 references
The subject of the project is investment activities aimed at rebuilding the building of the Public School Complex in Lower Basznia together with the reconstruction of the sports hall. In addition, the school team will be equipped with modern ICT equipment and equipped with teaching materials will be a natural laboratory. The implementation of the project will create favourable conditions for the development of the school covered by the project, ensuring at the same time improving the quality and standard of teaching, as well as increasing accessibility to modern teaching methods for children from rural areas of Lubaczów. The achievement of the main objective is possible through the achievement of the specific objectives: — improving the school’s local and sports base; — access to modern scientific aid for children; — improving the energy efficiency of the building; — improving working and working conditions; — reduce the disparities in access to education. As part of the modernisation, it is planned to: the refurbishment of parts of the walls and construction, enlargement of the door holes, partial walling of window and door openings, demolition and construction of staircases, reconstruction of the main entrance, replacement of the wooden carpentry on the windows of the PCV with the replacement of the interior and exterior walls of the interior and exterior walls, the demolition of the staircase and the performance of the staircase in the constructed window window (the ceiling above the cellar and the ground floor), (English)
20 October 2020
0 references
Identifiers
RPPK.06.04.03-18-0058/16
0 references