Energy renovation of public buildings in the area of the municipality of Brzozów — thermal renovation of the Urban Authority building and district office at ul. The National Army 1 in Brzozów (Q118655): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The aim of the project is to improve the energy efficiency of the administrative building of the district office of Brzozów and district office in Brzozów to the level of the energy efficient with the simultaneous introduction of the energy management system. modernisation of bulkheads — ceilings and external walls and window and door frames; modernisation of the installation of domestic hot water; modernisation of the heating system; replacem...)
(‎Created claim: summary (P836): The aim of the project is to improve the energy efficiency of the administrative building of the Municipal Office in Brzozów and the District Starostwo in Brzozów to the level of energy-saving construction with the simultaneous implementation of the energy management system. modernisation of partitions – ceilings and exterior walls, as well as window and door carpentry; modernisation of hot water installations; modernisation of the heating syste...)
Property / summary
 
The aim of the project is to improve the energy efficiency of the administrative building of the Municipal Office in Brzozów and the District Starostwo in Brzozów to the level of energy-saving construction with the simultaneous implementation of the energy management system. modernisation of partitions – ceilings and exterior walls, as well as window and door carpentry; modernisation of hot water installations; modernisation of the heating system; replacement of lighting for energy-efficient, solar system installation; installation of a set of photovoltaic cells.The main products of the project include energy modernisation of the building. In addition, the projections plan to use RES energy, thereby creating additional capacity to generate electricity and heat from renewable sources. The heat source for the building will also be modernised. As a result of the project, the following will be: improving the conditions of use of the facility and eliminating the heat discomfort felt by users; reducing the cost of energy supply of the building and improving air quality due to the limitation of energy sources.The project therefore meets the strategic goal of the Low-Emission Economy Plan for Brzozów Municipality – Improving air quality, increasing energy efficiency and increasing the share of energy from renewable sources in Brzozów Municipality. (English)
Property / summary: The aim of the project is to improve the energy efficiency of the administrative building of the Municipal Office in Brzozów and the District Starostwo in Brzozów to the level of energy-saving construction with the simultaneous implementation of the energy management system. modernisation of partitions – ceilings and exterior walls, as well as window and door carpentry; modernisation of hot water installations; modernisation of the heating system; replacement of lighting for energy-efficient, solar system installation; installation of a set of photovoltaic cells.The main products of the project include energy modernisation of the building. In addition, the projections plan to use RES energy, thereby creating additional capacity to generate electricity and heat from renewable sources. The heat source for the building will also be modernised. As a result of the project, the following will be: improving the conditions of use of the facility and eliminating the heat discomfort felt by users; reducing the cost of energy supply of the building and improving air quality due to the limitation of energy sources.The project therefore meets the strategic goal of the Low-Emission Economy Plan for Brzozów Municipality – Improving air quality, increasing energy efficiency and increasing the share of energy from renewable sources in Brzozów Municipality. (English) / rank
 
Normal rank
Property / summary: The aim of the project is to improve the energy efficiency of the administrative building of the Municipal Office in Brzozów and the District Starostwo in Brzozów to the level of energy-saving construction with the simultaneous implementation of the energy management system. modernisation of partitions – ceilings and exterior walls, as well as window and door carpentry; modernisation of hot water installations; modernisation of the heating system; replacement of lighting for energy-efficient, solar system installation; installation of a set of photovoltaic cells.The main products of the project include energy modernisation of the building. In addition, the projections plan to use RES energy, thereby creating additional capacity to generate electricity and heat from renewable sources. The heat source for the building will also be modernised. As a result of the project, the following will be: improving the conditions of use of the facility and eliminating the heat discomfort felt by users; reducing the cost of energy supply of the building and improving air quality due to the limitation of energy sources.The project therefore meets the strategic goal of the Low-Emission Economy Plan for Brzozów Municipality – Improving air quality, increasing energy efficiency and increasing the share of energy from renewable sources in Brzozów Municipality. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:34, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of public buildings in the area of the municipality of Brzozów — thermal renovation of the Urban Authority building and district office at ul. The National Army 1 in Brzozów
Project in Poland financed by DG Regio

    Statements

    0 references
    1,408,013.51 zloty
    0 references
    337,923.24 Euro
    13 January 2020
    0 references
    1,656,486.55 zloty
    0 references
    397,556.77 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 December 2015
    0 references
    31 May 2018
    0 references
    GMINA BRZOZÓW
    0 references
    Celem projektu jest poprawa efektywności energetycznej budynku administracyjnego siedziby Urzędu Miejskiego w Brzozowie i Starostwa Powiatowego w Brzozowie do poziomu budownictwa energooszczędnego z równoczesnym wprowadzaniem systemu zarządzania energią.Projekt obejmuje termomodernizację energetyczną budynku między innymi przez: modernizację przegród – stropów i ścian zewnętrznych oraz stolarki okiennej i drzwiowej; modernizację instalacji ciepłej wody użytkowej; modernizację systemu grzewczego; wymianę oświetlenia na energooszczędne, montaż systemu solarnego; montaż zestawu ogniw fotowoltaicznych.Do głównych produktów projektu należy zmodernizowanie energetyczne przedmiotowego budynku. Ponadto w projekcje zaplanowano wykorzystanie energii z OZE, przez co powstanie dodatkowa zdolność wytwarzania energii elektrycznej i cieplnej ze źródeł odnawialnych. Zostanie także zmodernizowane źródło ciepła dla budynku. W wyniku realizacji projektu nastąpi: poprawa warunków użytkowania obiektu i likwidacja dyskomfortu cieplnego odczuwanego przez użytkowników; redukcja kosztów zaopatrzenia budynku w energię oraz poprawa, jakości powietrza ze względu na ograniczenie emisyjności źródeł energii.Projekt realizuje, zatem cel strategiczny Planu Gospodarki Niskoemisyjnej dla Gminy Brzozów - Poprawa jakości powietrza, podniesienie efektywności energetycznej oraz zwiększenie udziału energii z odnawialnych źródeł na terenie Gminy Brzozów. (Polish)
    0 references
    The aim of the project is to improve the energy efficiency of the administrative building of the Municipal Office in Brzozów and the District Starostwo in Brzozów to the level of energy-saving construction with the simultaneous implementation of the energy management system. modernisation of partitions – ceilings and exterior walls, as well as window and door carpentry; modernisation of hot water installations; modernisation of the heating system; replacement of lighting for energy-efficient, solar system installation; installation of a set of photovoltaic cells.The main products of the project include energy modernisation of the building. In addition, the projections plan to use RES energy, thereby creating additional capacity to generate electricity and heat from renewable sources. The heat source for the building will also be modernised. As a result of the project, the following will be: improving the conditions of use of the facility and eliminating the heat discomfort felt by users; reducing the cost of energy supply of the building and improving air quality due to the limitation of energy sources.The project therefore meets the strategic goal of the Low-Emission Economy Plan for Brzozów Municipality – Improving air quality, increasing energy efficiency and increasing the share of energy from renewable sources in Brzozów Municipality. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0026/16
    0 references