Energy renovation of the health building in the Council (Q118634): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project plans to modernise the building to which the tenant of the ‘Ars Medica’ is a non-public service in the Council. The main objective of this project is to improve the energy efficiency of the use of the energy infrastructure of the building which will result in a reduction in the final energy consumption of 943,68 GJ.Scope of works to include: — insulation of the outdoor walls of the building, — insulation of the external walls of th...) |
(Created claim: summary (P836): As part of the project, the energy modernisation of the building is planned, the tenant of which is the Non-public Health Care Department “Ars Medica” in Radymno. The main objective of this project is to improve the energy efficiency of the building’s energy infrastructure, which will reduce final energy consumption of 943.68 GJ. — warming of the outer walls of the cellars, – warming of the outer walls of the building, – warming of the floor cei...) |
||||||||||||||
Property / summary | |||||||||||||||
As part of the project, the energy modernisation of the building is planned, the tenant of which is the Non-public Health Care Department “Ars Medica” in Radymno. The main objective of this project is to improve the energy efficiency of the building’s energy infrastructure, which will reduce final energy consumption of 943.68 GJ. — warming of the outer walls of the cellars, – warming of the outer walls of the building, – warming of the floor ceiling, – replacement of windows for energy-saving, – replacement of doors for energy-saving, – modernisation of the C.W.U. system in the boiler room, modernisation of heating system and renovation of the boiler room, electrical installations in the boiler room, installation of two condensing gas boilers with a capacity of 65 kW each. (English) | |||||||||||||||
Property / summary: As part of the project, the energy modernisation of the building is planned, the tenant of which is the Non-public Health Care Department “Ars Medica” in Radymno. The main objective of this project is to improve the energy efficiency of the building’s energy infrastructure, which will reduce final energy consumption of 943.68 GJ. — warming of the outer walls of the cellars, – warming of the outer walls of the building, – warming of the floor ceiling, – replacement of windows for energy-saving, – replacement of doors for energy-saving, – modernisation of the C.W.U. system in the boiler room, modernisation of heating system and renovation of the boiler room, electrical installations in the boiler room, installation of two condensing gas boilers with a capacity of 65 kW each. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As part of the project, the energy modernisation of the building is planned, the tenant of which is the Non-public Health Care Department “Ars Medica” in Radymno. The main objective of this project is to improve the energy efficiency of the building’s energy infrastructure, which will reduce final energy consumption of 943.68 GJ. — warming of the outer walls of the cellars, – warming of the outer walls of the building, – warming of the floor ceiling, – replacement of windows for energy-saving, – replacement of doors for energy-saving, – modernisation of the C.W.U. system in the boiler room, modernisation of heating system and renovation of the boiler room, electrical installations in the boiler room, installation of two condensing gas boilers with a capacity of 65 kW each. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 16:33, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of the health building in the Council |
Project in Poland financed by DG Regio |
Statements
839,956.49 zloty
0 references
1,014,072.79 zloty
0 references
82.83 percent
0 references
1 March 2019
0 references
31 July 2020
0 references
MIASTO RADYMNO
0 references
W ramach projektu planuje się modernizację energetyczną budynku, którego najemcą jest Niepubliczny Zakład Opieki Zdrowotnej „Ars Medica” w Radymnie. Głównym celem niniejszego projektu jest poprawa efektywności energetycznej wykorzystania infrastruktury energetycznej budynku, dzięki której nastąpi redukcja zużycia energii końcowej na poziomie 943,68 GJ.Zakres robót obejmować będzie: - docieplenie ścian zewnętrznych piwnic, - docieplenie ścian zewnętrznych budynku, - docieplenie stropu piętra, - wymiana okien na energooszczędne, - wymiana drzwi na energooszczędne, - modernizacja systemu C.W.U. w kotłowni, modernizacja instalacji grzewczej oraz remont kotłowni, instalacje elektryczna w kotłowni, montaż dwóch wiszących kotłów gazowych kondensacyjnych o mocy 65 kW każdy, - wymiana oświetlenia na energooszczędne, - montaż instalacji fotowoltaicznej o mocy 10,24 kW. (Polish)
0 references
As part of the project, the energy modernisation of the building is planned, the tenant of which is the Non-public Health Care Department “Ars Medica” in Radymno. The main objective of this project is to improve the energy efficiency of the building’s energy infrastructure, which will reduce final energy consumption of 943.68 GJ. — warming of the outer walls of the cellars, – warming of the outer walls of the building, – warming of the floor ceiling, – replacement of windows for energy-saving, – replacement of doors for energy-saving, – modernisation of the C.W.U. system in the boiler room, modernisation of heating system and renovation of the boiler room, electrical installations in the boiler room, installation of two condensing gas boilers with a capacity of 65 kW each. (English)
20 October 2020
0 references
Identifiers
RPPK.03.02.00-18-0011/18
0 references