Improvement of preschool infrastructure in Radomyśl Wielki Commune. (Q119208): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Improvement of preschool infrastructure in Radomyśl Wielki Commune.

Revision as of 16:27, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of preschool infrastructure in Radomyśl Wielki Commune.
Project in Poland financed by DG Regio

    Statements

    0 references
    186,407.52 zloty
    0 references
    44,737.80 Euro
    13 January 2020
    0 references
    219,302.98 zloty
    0 references
    52,632.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 June 2017
    0 references
    20 July 2018
    0 references
    GMINA RADOMYŚL WIELKI
    0 references
    projektem przełoży się także na polepszenie jakości życia mieszkańców gminy oraz doprowadzi do podniesienia jej atrakcyjności dla mieszkańców. Do pozostałych celów projektu należą również: zwiększenie ilości miejsc w placówkach wychowania przedszkolnego ,poprawa warunków nauczania przedszkolnego ,poprawa bezpieczeństwa dzieci uczęszczających do przedszkola jak również personelu pedagogicznego. Jednakże oddziaływanie projektu będzie znacznie szersze – pozwoli ono także m.in. na:zmniejszania terytorialnego deficytu w dostępie do placówek wychowania przedszkolnego,upowszechnienie edukacji przedszkolnej. Cele są zgodne z celami EFS, z rozporządzenia PE i Rady 1304/2013 z 17.12.2013 r. Rozbudowa budynku Zespołu Szkolno – Przedszkolnego w Żarówce polegać będzie na dobudowie budynku parterowego, ściany docieplone styropianem. . Dach w formie stropodachu. Pokrycie dachu papą termozgrzewalną. Szerokość elewacji wynosi 9,0 m, kąt nachylenia stropodachu około 3°. Wysokość budynku – do 3,5 m. Instalacje wewnętrzne: elektryczną, wodo- kan, wentylacyjną grawitacyjną, C.O. zasilane z istniejącej kotłowni . Pow. zab – 51,07 m2, pow. użytk – 44,1 m2,kub – 250,22 m3,dł – 9,37 m, szer – 5,43 m.Roboty adaptacyjne w Przedszkolu Publicznym w Podborzu wraz z placem zabaw : przygotowanie terenu poprzez usunięcie humusu i niwelację placu, zamontowanie urządzeń huśtawka wahadłowa – 1 szt. karuzela -1 szt, zestaw zabawowy 1 szt, huśtawka wagowa 1 szt, zabawka na sprężynie 1 szt, piaskownica drewniana 1 szt .Adaptacja pomieszczeń sanitariatów i sal do zajęć roboty budowlano –instalacyjne w zakresie wymiana baterii, umywalki, pisuaru, miski ustępowej z płuczką oraz brodzika, wykonanie glazury na ścianach i terrakoty na posadzkach, malowanie pomieszczeń wc i pomieszczeń dydaktycznych (roboty niekwalifikowalne) (Polish)
    0 references
    the project will also translate into improving the quality of life of residents of the municipality and will increase its attractiveness for residents. Other objectives of the project include: increase the number of places in pre-school education institutions, improve pre-school education conditions, improve the safety of children attending kindergarten as well as pedagogical staff. However, the impact of the project will be much broader – it will also allow for:reduction of territorial deficit in access to pre-school institutions, dissemination of pre-school education. The objectives are in line with the objectives of the ESF, the EP and Council Regulation 1304/2013 of 17.12.2013. The expansion of the school and preschool complex building in a light bulb will consist of the addition of a ground-floor building, walls with styrofoam. .. Roof in the form of a ceiling. Roof cover with heat-heated papa. The width of the facade is 9.0 m, the angle of the stropod is about 3°. Height of the building – up to 3.5 m. Internal installations: electric, water can, gravitational ventilation, C.O. powered from an existing boiler room. Above ground – 51,07 m², area – 44,1 m², cubicle – 250.22 m³, long – 9.37 m, wide – 5.43 m.Adapting work in the Public Preschool in Podborz with playground: preparation of the area through removal of humus and levelling of the square, installation of pendulum swing devices – 1 pcs. carousel -1 pcs, play set 1 pcs, weight swing 1 pcs, toy on spring 1 pcs, sandbox wooden 1 pieces Adaptation of rooms of sanitary rooms and halls for construction work – installation in the scope of replacement of batteries, washbasins, urinals, pavilions and mouth bowls of lungs (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.06.04.01-18-0004/16
    0 references