Renewable energy sources in the municipalities of Wiśniowa and Frysztak. (Q118466): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): Partnership project implemented in partnership (Lider-Lmin Wiśniowa, Partner — Municipality of Frysztak). The scope of the project includes the construction of units of energy from RES: in the municipality of Wiśniowa: solar panels 141, solar installations 238, boilers 5 for biomass 34, and air and ground heat pumps: 20 Plus.In the municipality of Fryshtak: solar panels 152, solar installations 266, boilers 5 for biomass 45 and air heat pumps...)
Property / summary
Partnership project implemented in partnership (Lider-Lmin Wiśniowa, Partner — Municipality of Frysztak). The scope of the project includes the construction of units of energy from RES: in the municipality of Wiśniowa: solar panels 141, solar installations 238, boilers 5 for biomass 34, and air and ground heat pumps: 20 Plus.In the municipality of Fryshtak: solar panels 152, solar installations 266, boilers 5 for biomass 45 and air heat pumps 77, the project will ensure that the project is prepared, implemented and coordinated in a comprehensive manner. The main aim of the project is to increase the production of energy from RES and its use in final energy consumption in the municipality of Wiśniowa and in the municipality of Fryshyes, by means of investment in the construction of units for the production of electricity and heat, in a distributed system to end customers, in households situated within the territory of designated municipalities. In view of the achievement of the project objectives, the generation of energy from renewable sources in distributed sources will increase, greenhouse gas emissions will be reduced, as well as the cost of energy consumption in households. The project will include 714 households, including 196 affected by energy poverty. The declared power from RES will be as follows: solar panels — 1.07 MW, solar collectors 1.96 MW, biomass boilers 1.63 MW and heat pumps — 0.29 MW. Total capacity of their installation 4.95 MW.Cost efficiency of the project will amount to PLN 2 644 791,71/MW. The project is in line with the PGN of the partner municipalities. The inhabitants declared contributing 15 % of the eligible expenditure and VAT. The project does not require the obtaining of building permits and the notification of construction works. The applicant shall ensure that the project will apply mechanisms that take all users into account in accordance with the universal design principles. (English)
 
Property / summary: Partnership project implemented in partnership (Lider-Lmin Wiśniowa, Partner — Municipality of Frysztak). The scope of the project includes the construction of units of energy from RES: in the municipality of Wiśniowa: solar panels 141, solar installations 238, boilers 5 for biomass 34, and air and ground heat pumps: 20 Plus.In the municipality of Fryshtak: solar panels 152, solar installations 266, boilers 5 for biomass 45 and air heat pumps 77, the project will ensure that the project is prepared, implemented and coordinated in a comprehensive manner. The main aim of the project is to increase the production of energy from RES and its use in final energy consumption in the municipality of Wiśniowa and in the municipality of Fryshyes, by means of investment in the construction of units for the production of electricity and heat, in a distributed system to end customers, in households situated within the territory of designated municipalities. In view of the achievement of the project objectives, the generation of energy from renewable sources in distributed sources will increase, greenhouse gas emissions will be reduced, as well as the cost of energy consumption in households. The project will include 714 households, including 196 affected by energy poverty. The declared power from RES will be as follows: solar panels — 1.07 MW, solar collectors 1.96 MW, biomass boilers 1.63 MW and heat pumps — 0.29 MW. Total capacity of their installation 4.95 MW.Cost efficiency of the project will amount to PLN 2 644 791,71/MW. The project is in line with the PGN of the partner municipalities. The inhabitants declared contributing 15 % of the eligible expenditure and VAT. The project does not require the obtaining of building permits and the notification of construction works. The applicant shall ensure that the project will apply mechanisms that take all users into account in accordance with the universal design principles. (English) / rank
Normal rank
 

Revision as of 16:19, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renewable energy sources in the municipalities of Wiśniowa and Frysztak.
Project in Poland financed by DG Regio

    Statements

    0 references
    9,882,110.19 zloty
    0 references
    2,371,706.45 Euro
    13 January 2020
    0 references
    11,626,012.0 zloty
    0 references
    2,790,242.88 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 March 2017
    0 references
    15 October 2019
    0 references
    GMINA WIŚNIOWA
    0 references
    0 references
    Projekt „parasolowy” realizowany w partnerstwie (Lider-Gmina Wiśniowa, Partner – Gmina Frysztak). Zakres rzeczowy projektu obejmuje budowę jednostek wywarzania energii z OZE: w Gminie Wiśniowa: panele fotowoltaiczne 141 szt., instalacje solarne 238 szt., kotły klasy 5 na biomasę 34 szt. oraz powietrzne i gruntowe pompy ciepła: 20 szt.W Gminie Frysztak: panele fotowoltaiczne 152 szt., instalacje solarne 266 szt., kotły klasy 5 na biomasę 45 szt. oraz powietrzne pompy ciepła 77 szt.Lider projektu w kompleksowy sposób zapewni przygotowanie, realizację i koordynację projektu. Celem głównym projektu jest wzrost produkcji energii pochodzącej z OZE i jej wykorzystanie w finalnym zużyciu energii w Gminie Wiśniowa i Gminie Frysztak, dzięki realizacji inwestycji w zakresie budowy jednostek wytwarzania energii elektrycznej i ciepła, w systemie rozproszonym, dla odbiorców końcowych – mieszkańców gospodarstw domowych położonych na terenie wskazanych gmin. W związku z osiągnięciem celów projektu zwiększy się wytwarzanie energii z OZE w źródłach rozproszonych, zmniejszy się poziom emisji gazów cieplarnianych oraz koszty zużycia energii w gospodarstwach domowych. Łącznie projektem zostanie objętych 714 gospodarstw domowych, w tym 196 dotkniętych ubóstwem energetycznym. Moc zadeklarowana z OZE wyniesie: panele fotowoltaiczne – 1,07 MW, kolektory słoneczne – 1,96 MW, kotły na biomasę – 1,63 MW oraz pompy ciepła - 0,29 MW. Łączna moc wszyskich instalacji wyniesienie 4,95 MW.Efektywność kosztowa projektu wyniesie 2 644 791,71 PLN/MW. Projekt jest zgodny z PGN gmin partnerskich. Mieszkańcy zadeklarowali wniesienie wkładu zapewniającego pokrycie 15% wydatków kwalifikowanych oraz podatku VAT. Projekt nie wymaga uzyskania pozwoleń na budowę ani zgłoszenia robót budowlanych. Wnioskodawca zapewnia że w ramach projektu zastosowane zostaną mechanizmy uwzględniające wszystkich użytkowników zgodnie z zasadami projektowania uniwersalnego. (Polish)
    0 references

    Identifiers

    RPPK.03.01.00-18-0006/17
    0 references