Improving accessibility to the nodes of the A4 Gogolin and Olsztyn motorway. Phase I. Activity 1: Construction of a new road viaduct over the railway line on the provincial road No 426 with the construction of this road in the new footprint on the section from km 15 + 831,78 to km 16 + 279,11 in m. (Q115053): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the study is the construction of provincial road No 426 in the county of Strzelce Opolskie to km 15 + 831,78 to km 16 + 279,11 with the construction of a new viaduct. The scope of the task consists of the dismantling of the road bridge over the railway line, together with the fragments of the embankment at the level crossing. Construction of provincial road No 426, master class, two lane one lane at more than 0.44 km in the new...)
(‎Created claim: summary (P836): The subject of the study is the construction of the Voivodeship Road No. 426 in Strzelce Opolskie on the section from km 15 + 831.78 to km 16 + 279.11 together with the construction of a new viaduct. The scope of the task is the demolition of the road viaduct over the railway line with fragments of the embankment on the access points. Construction in a new footprint of Voivodeship Road No. 426, main class, single-space two-lane G1/2 over a lengt...)
Property / summary
 
The subject of the study is the construction of the Voivodeship Road No. 426 in Strzelce Opolskie on the section from km 15 + 831.78 to km 16 + 279.11 together with the construction of a new viaduct. The scope of the task is the demolition of the road viaduct over the railway line with fragments of the embankment on the access points. Construction in a new footprint of Voivodeship Road No. 426, main class, single-space two-lane G1/2 over a length of more than 0.44 km. Construction of a new single-span road viaduct with a length of 31.8 m and a width of 14.2 m. The span is a grate consisting of 11 HL 1100M steel girders combined with reinforced concrete bridging plate. Demolition of the existing culvert and construction of a new reinforced concrete culvert made of prefabricated elements with a cross-section of 4.5 x 1.8 m and a length of 35.0 m. The bridge and culvert are designed for Class A (50 T) load. Construction of an acoustic screen during the provincial road on a total length of about 160.0 mb. There will be a change in the route of voivodeship road No. 426, which will cause it to be removed from the strict centre. Construction of a bicycle track on a new course of the voivodship road with a length of more than 0.44 km and the construction of a pavement with a length of 45.0 mb. Reconstruction and construction of intersections with public roads. Construction of street lighting, rainwater drainage with settlers and collective collectors. A detailed description of the actions to be implemented for this project is set out in point 5.1 of this proposal. (English)
Property / summary: The subject of the study is the construction of the Voivodeship Road No. 426 in Strzelce Opolskie on the section from km 15 + 831.78 to km 16 + 279.11 together with the construction of a new viaduct. The scope of the task is the demolition of the road viaduct over the railway line with fragments of the embankment on the access points. Construction in a new footprint of Voivodeship Road No. 426, main class, single-space two-lane G1/2 over a length of more than 0.44 km. Construction of a new single-span road viaduct with a length of 31.8 m and a width of 14.2 m. The span is a grate consisting of 11 HL 1100M steel girders combined with reinforced concrete bridging plate. Demolition of the existing culvert and construction of a new reinforced concrete culvert made of prefabricated elements with a cross-section of 4.5 x 1.8 m and a length of 35.0 m. The bridge and culvert are designed for Class A (50 T) load. Construction of an acoustic screen during the provincial road on a total length of about 160.0 mb. There will be a change in the route of voivodeship road No. 426, which will cause it to be removed from the strict centre. Construction of a bicycle track on a new course of the voivodship road with a length of more than 0.44 km and the construction of a pavement with a length of 45.0 mb. Reconstruction and construction of intersections with public roads. Construction of street lighting, rainwater drainage with settlers and collective collectors. A detailed description of the actions to be implemented for this project is set out in point 5.1 of this proposal. (English) / rank
 
Normal rank
Property / summary: The subject of the study is the construction of the Voivodeship Road No. 426 in Strzelce Opolskie on the section from km 15 + 831.78 to km 16 + 279.11 together with the construction of a new viaduct. The scope of the task is the demolition of the road viaduct over the railway line with fragments of the embankment on the access points. Construction in a new footprint of Voivodeship Road No. 426, main class, single-space two-lane G1/2 over a length of more than 0.44 km. Construction of a new single-span road viaduct with a length of 31.8 m and a width of 14.2 m. The span is a grate consisting of 11 HL 1100M steel girders combined with reinforced concrete bridging plate. Demolition of the existing culvert and construction of a new reinforced concrete culvert made of prefabricated elements with a cross-section of 4.5 x 1.8 m and a length of 35.0 m. The bridge and culvert are designed for Class A (50 T) load. Construction of an acoustic screen during the provincial road on a total length of about 160.0 mb. There will be a change in the route of voivodeship road No. 426, which will cause it to be removed from the strict centre. Construction of a bicycle track on a new course of the voivodship road with a length of more than 0.44 km and the construction of a pavement with a length of 45.0 mb. Reconstruction and construction of intersections with public roads. Construction of street lighting, rainwater drainage with settlers and collective collectors. A detailed description of the actions to be implemented for this project is set out in point 5.1 of this proposal. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:03, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving accessibility to the nodes of the A4 Gogolin and Olsztyn motorway. Phase I. Activity 1: Construction of a new road viaduct over the railway line on the provincial road No 426 with the construction of this road in the new footprint on the section from km 15 + 831,78 to km 16 + 279,11 in m.
Project in Poland financed by DG Regio

    Statements

    0 references
    10,445,496.62 zloty
    0 references
    2,506,919.19 Euro
    13 January 2020
    0 references
    12,288,819.55 zloty
    0 references
    2,949,316.69 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 December 2015
    0 references
    12 January 2017
    0 references
    WOJEWÓDZTWO OPOLSKIE
    0 references
    0 references
    Przedmiotem opracowania jest budowa drogi wojewódzkiej nr 426 w m. Strzelce Opolskie na odc. od km 15+831,78 do km 16+279,11 wraz z budowa nowego wiaduktu. Zakres zadania obejmuje rozbiórkę wiaduktu drogowego nad linią kolejową wraz z fragmentami nasypu na dojazdach. Budowę w nowym śladzie drogi wojewódzkiej nr 426, klasy głównej, jednoprzestrzennej dwupasmowej G1/2 na długości ponad 0,44 km. Budowę nowego jednoprzęsłowego wiaduktu drogowego o długości 31,8 m i szerokości 14,2 m. Konstrukcja przęsła stanowi ruszt składający się z 11 szt. dźwigarów stalowych dwuteowych typu HL 1100M zespolony żelbetową płytą pomostową. Rozbiórka istniejącego przepustu i budowa nowego przepustu żelbetowego z prefabrykowanych elementów o przekroju skrzynkowym o wymiarach 4,5 x 1,8 m i długości 35,0 m. Wiadukt i przepust zostały zaprojektowane na obciążenie klasą A ( 50 T). Budowę ekranu akustycznego w ciągu drogi wojewódzkiej na łącznej długości około 160,0 mb. Nastąpi zmiana przebiegu drogi wojewódzkiej nr 426 co spowoduje jej odsunięcie od ścisłego centrum. Budowa ciągu pieszo rowerowego na nowym przebiegu drogi wojewódzkiej o długości ponad 0,44 km oraz budowa chodnika o długości 45,0 mb. Przebudowa i budowa skrzyżowań z drogami publicznymi . Budowa oświetlenia ulicznego, kanalizacji deszczowej wraz z osadnikami i kolektorami zbiorczymi. Szczegółowy opis działań planowanych do realizacji dla przedmiotowego projektu ujęto w pkt.5.1 niniejszego wniosku. (Polish)
    0 references
    The subject of the study is the construction of the Voivodeship Road No. 426 in Strzelce Opolskie on the section from km 15 + 831.78 to km 16 + 279.11 together with the construction of a new viaduct. The scope of the task is the demolition of the road viaduct over the railway line with fragments of the embankment on the access points. Construction in a new footprint of Voivodeship Road No. 426, main class, single-space two-lane G1/2 over a length of more than 0.44 km. Construction of a new single-span road viaduct with a length of 31.8 m and a width of 14.2 m. The span is a grate consisting of 11 HL 1100M steel girders combined with reinforced concrete bridging plate. Demolition of the existing culvert and construction of a new reinforced concrete culvert made of prefabricated elements with a cross-section of 4.5 x 1.8 m and a length of 35.0 m. The bridge and culvert are designed for Class A (50 T) load. Construction of an acoustic screen during the provincial road on a total length of about 160.0 mb. There will be a change in the route of voivodeship road No. 426, which will cause it to be removed from the strict centre. Construction of a bicycle track on a new course of the voivodship road with a length of more than 0.44 km and the construction of a pavement with a length of 45.0 mb. Reconstruction and construction of intersections with public roads. Construction of street lighting, rainwater drainage with settlers and collective collectors. A detailed description of the actions to be implemented for this project is set out in point 5.1 of this proposal. (English)
    20 October 2020
    0 references

    Identifiers

    RPOP.06.01.00-16-0001/15
    0 references