Q116737 (Q116737): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of the project is the design and revitalisation of single track, non-electrified, wide-track (1520 mm) railway lines No. 57 (from km 161.496 to km 188.260) and 923 (from km 0.000 to km 1.120) together with traffic control equipment and engineering facilities. Category of line No 57 – Priority, category of line No 923 – local significance. Line 57 is parallel to railway line 6. Railway No. 923 departs from line 57 in km 176.952 (passe...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 15:40, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
164,041,671.2 zloty
0 references
192,990,201.43 zloty
0 references
85.0 percent
0 references
14 June 2018
0 references
15 November 2021
0 references
PKP POLSKIE LINIE KOLEJOWE SPÓŁKA AKCYJNA
0 references
Przedmiotem projektu jest zaprojektowanie oraz rewitalizacja jednotorowych, niezelektryfikowanych, szerokotorowych (1520 mm) linii kolejowych nr 57 (na odcinku od km 161,496 do km 188,260) oraz nr 923 (na odcinku od km 0,000 do km 1,120) wraz z urządzeniami sterowania ruchem kolejowym i obiektami inżynieryjnymi. Kategoria linii nr 57 – pierwszorzędna, kategoria linii nr 923 – znaczenia miejscowego. Linia nr 57 jest na całej długości równoległa do linii kolejowej nr 6. Linia kolejowa nr 923 odchodzi od linii nr 57 w km 176,952 (w rozjeździe nr 6) i tam ma swój początek. Całość przedmiotu zamówienia obejmuje wykonanie: 1) Dokumentacji projektowej niezbędnej do prawidłowego wykonania wszystkich robót budowlanych i uzyskania dla niej wszystkich wymaganych opinii, uzgodnień, dopuszczeń, warunków, decyzji i pozwoleń niezbędnych do realizacji przedmiotu zamówienia; 2) Wszystkich robót budowlanych zgodnie z zakresem zamówienia na podstawie opracowanej przez Wykonawcę i zatwierdzonej przez Zamawiającego dokumentacji projektowej, o której mowa w ppkt 1), oraz wszystkich robót przygotowawczych niezbędnych do wykonania zakresu Umowy oraz wszelkich czynności wymaganych Prawem; 3) Przeprowadzenie oceny zgodności każdego podsystemu strukturalnego objętego zakresem zamówienia na każdym etapie (projektowania, budowy i końcowych prób podsystemu). Zamówienie obejmuje zaprojektowanie i wykonanie zakresu torowego, inżynieryjnego i sterowania ruchem kolejowym oraz wszystkich branż niezbędnych do prawidłowego wykonania zadania. Zamawiający zwraca szczególną uwagę, iż całość przedmiotu Zamówienia powinna być wykonana zgodnie z Standardami Technicznymi. (Polish)
0 references
The subject of the project is the design and revitalisation of single track, non-electrified, wide-track (1520 mm) railway lines No. 57 (from km 161.496 to km 188.260) and 923 (from km 0.000 to km 1.120) together with traffic control equipment and engineering facilities. Category of line No 57 – Priority, category of line No 923 – local significance. Line 57 is parallel to railway line 6. Railway No. 923 departs from line 57 in km 176.952 (passenger 6) and begins there. The whole subject-matter of the contract includes the performance of: 1) Design documentation necessary for the proper execution of all construction works and obtaining all the required opinions, arrangements, approvals, conditions, decisions and permits necessary for the performance of the subject matter of the contract; 2) All construction works according to the scope of the contract on the basis of the design documentation referred to in point (1), prepared by the Contractor and approved by the Employer, as well as all preparatory works necessary for the performance of the scope of the Agreement and any activities required by Law; 3) Conformity assessment of each structural subsystem covered by the contract at each stage (design, construction and final testing of the subsystem). The contract includes the design and execution of the track range, engineering and traffic control, as well as all sectors necessary for the proper performance of the task. The awarding entity shall pay particular attention to the fact that the whole subject of the contract should be performed in accordance with the Technical Standards. (English)
20 October 2020
0 references
Identifiers
RPPD.04.02.00-20-0001/17
0 references