Construction of pedestrian and cycling infrastructure in Opole district — stage I (Q114848): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): As part of the project, a cycle path of between 2,50 and 3.00 m will be built (along provincial road No 457 of concrete asphalt and along the district road No 1807 O — from concrete stone) of a total length: 3.58 km (of which 2.36 km in the territory of the municipality of Połów, 1.05 km in the municipality of Dobrzeń Wielka and 0.17 km in the municipality of ZIMEK) and two car parks Bike & Ride: in the ashtrays, at 10 stands and in Dobra, 20...)
(‎Created claim: summary (P836): As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the c...)
Property / summary
 
As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the construction of bicycle paths, there will be a foot and bicycle footbridge in the village of Krasiejów on the Mała Panew river with a resistance wall and a foot and bicycle footbridge over the Brynica River. The project also provides for illumination of the bicycle path using LED lamps on the Popielów – Stare Siołkowice section and Stare Siołkowice – Chróścice section. (English)
Property / summary: As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the construction of bicycle paths, there will be a foot and bicycle footbridge in the village of Krasiejów on the Mała Panew river with a resistance wall and a foot and bicycle footbridge over the Brynica River. The project also provides for illumination of the bicycle path using LED lamps on the Popielów – Stare Siołkowice section and Stare Siołkowice – Chróścice section. (English) / rank
 
Normal rank
Property / summary: As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the construction of bicycle paths, there will be a foot and bicycle footbridge in the village of Krasiejów on the Mała Panew river with a resistance wall and a foot and bicycle footbridge over the Brynica River. The project also provides for illumination of the bicycle path using LED lamps on the Popielów – Stare Siołkowice section and Stare Siołkowice – Chróścice section. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:22, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of pedestrian and cycling infrastructure in Opole district — stage I
Project in Poland financed by DG Regio

    Statements

    0 references
    6,259,199.59 zloty
    0 references
    1,502,207.90 Euro
    13 January 2020
    0 references
    7,363,764.24 zloty
    0 references
    1,767,303.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    17 May 2016
    0 references
    31 January 2018
    0 references
    POWIAT OPOLSKI
    0 references
    W ramach realizacji projektu powstanie ścieżka rowerowa o szerokości 2,50 - 3,00 m (wzdłuż drogi wojewódzkiej nr 457 z betonu asfaltowego oraz wzdłuż drogi powiatowej nr 1807 O – z kostki betonowej) o łącznej długości: 3,58 km (w tym 2,36 km na terenie gminy Popielów, 1,05 km na terenie gminy Dobrzeń Wielki oraz 0,17 km na terenie gminy Ozimek) oraz dwa parkingi Bike&Ride: w Popielowie na 10 stojaków oraz w Dobrzeniu Wielkim na 20 stojaków. W ramach budowy ścieżek rowerowych powstanie kładka pieszo-rowerowa w miejscowości Krasiejów nad rzeką Mała Panew z murem oporowym i kładka pieszo-rowerowa nad rzeką Brynica. Projekt przewiduje również oświetlenie ścieżki rowerowej za pomocą lamp typu LED na odcinku Popielów - Stare Siołkowice oraz Stare Siołkowice - Chróścice. (Polish)
    0 references
    As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the construction of bicycle paths, there will be a foot and bicycle footbridge in the village of Krasiejów on the Mała Panew river with a resistance wall and a foot and bicycle footbridge over the Brynica River. The project also provides for illumination of the bicycle path using LED lamps on the Popielów – Stare Siołkowice section and Stare Siołkowice – Chróścice section. (English)
    20 October 2020
    0 references

    Identifiers

    RPOP.03.01.02-16-0001/16
    0 references