(Removed claim: summary (P836): The applicant is the municipality of Rutki. The project will consist of a comprehensive thermal renovation of the building of the Primary School in Grądy-Woecko through: 1. The warming of the external walls of the basement of the building 2. Insulation of the outer wall of the building 3. The insulation of the ventilation valve above the building (4). The insulation of the non-ventilated pump above the building (5). Replacement of windows in t...) |
(Created claim: summary (P836): The project’s applicant is Rutka Municipality. The project will consist of a comprehensive thermal modernisation of the building of the Primary School in Grądy-Woniecko by: 1. Insulation of the outer walls of the cellars of the building 2. Warming of the outer walls of the building 3. Warming of ventilated ceiling above building 4. Warming of the unventilated ceiling above the building 5. Replacement of windows in the above-ground part of the bu...) |
||||||||||||||
Property / summary | |||||||||||||||
The project’s applicant is Rutka Municipality. The project will consist of a comprehensive thermal modernisation of the building of the Primary School in Grądy-Woniecko by: 1. Insulation of the outer walls of the cellars of the building 2. Warming of the outer walls of the building 3. Warming of ventilated ceiling above building 4. Warming of the unventilated ceiling above the building 5. Replacement of windows in the above-ground part of the building 6. Replacement of the old entrance door to the ground part of building 7. Walling of the luxfer with a gas concrete wall 8. Construction of a new biomass boiler room and a new central heating system 9. Modernisation of lighting in the building. The strategic objective of the project is to improve energy efficiency in the public sector through thermo-modernisation, smart energy management and the use of renewable energy sources in public infrastructure. The direct objective of the project is to improve the energy efficiency of a public utility building in the Rutka Municipality by: reducing heating costs, which at the same time reduces the operating costs of public institutions and raises awareness of users of public buildings in terms of energy efficiency. The budget of the project: 1 124 938,00 PLN. Co-financing (75 %): 843 077,21 PLN. Period of implementation of the project: XI 2016-XI 2017. (English) | |||||||||||||||
Property / summary: The project’s applicant is Rutka Municipality. The project will consist of a comprehensive thermal modernisation of the building of the Primary School in Grądy-Woniecko by: 1. Insulation of the outer walls of the cellars of the building 2. Warming of the outer walls of the building 3. Warming of ventilated ceiling above building 4. Warming of the unventilated ceiling above the building 5. Replacement of windows in the above-ground part of the building 6. Replacement of the old entrance door to the ground part of building 7. Walling of the luxfer with a gas concrete wall 8. Construction of a new biomass boiler room and a new central heating system 9. Modernisation of lighting in the building. The strategic objective of the project is to improve energy efficiency in the public sector through thermo-modernisation, smart energy management and the use of renewable energy sources in public infrastructure. The direct objective of the project is to improve the energy efficiency of a public utility building in the Rutka Municipality by: reducing heating costs, which at the same time reduces the operating costs of public institutions and raises awareness of users of public buildings in terms of energy efficiency. The budget of the project: 1 124 938,00 PLN. Co-financing (75 %): 843 077,21 PLN. Period of implementation of the project: XI 2016-XI 2017. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project’s applicant is Rutka Municipality. The project will consist of a comprehensive thermal modernisation of the building of the Primary School in Grądy-Woniecko by: 1. Insulation of the outer walls of the cellars of the building 2. Warming of the outer walls of the building 3. Warming of ventilated ceiling above building 4. Warming of the unventilated ceiling above the building 5. Replacement of windows in the above-ground part of the building 6. Replacement of the old entrance door to the ground part of building 7. Walling of the luxfer with a gas concrete wall 8. Construction of a new biomass boiler room and a new central heating system 9. Modernisation of lighting in the building. The strategic objective of the project is to improve energy efficiency in the public sector through thermo-modernisation, smart energy management and the use of renewable energy sources in public infrastructure. The direct objective of the project is to improve the energy efficiency of a public utility building in the Rutka Municipality by: reducing heating costs, which at the same time reduces the operating costs of public institutions and raises awareness of users of public buildings in terms of energy efficiency. The budget of the project: 1 124 938,00 PLN. Co-financing (75 %): 843 077,21 PLN. Period of implementation of the project: XI 2016-XI 2017. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 15:19, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermo-modernisation of the Primary School Building in Grench-Wonieko |
Project in Poland financed by DG Regio |
Statements
843,077.21 zloty
0 references
1,124,103.0 zloty
0 references
75.0 percent
0 references
9 November 2016
0 references
23 November 2017
0 references
GMINA RUTKI
0 references
Wnioskodawcą projektu jest Gmina Rutki. Projekt będzie polegał na kompleksowej termomodernizacji budynku Szkoły Podstawowej w miejscowości Grądy-Woniecko poprzez: 1. Ocieplenie ścian zewnętrznych piwnic budynku 2. Ocieplenie ścian zewnętrznych nadziemia budynku 3. Ocieplenie stropodachu wentylowanego nad budynkiem 4. Ocieplenie stropodachu niewentylowanego nad budynkiem 5. Wymianę okien w części nadziemnej budynku 6. Wymianę starych drzwi wejściowych do części nadziemnej budynku 7. Zamurowanie luksfer murem z gazobetonu 8. Wykonanie nowej kotłowni na biomasę oraz nowej instalacji centralnego ogrzewania 9. Modernizację oświetlenia w budynku. Celem strategicznym projektu jest poprawa efektywności energetycznej w sektorze publicznym poprzez termomodernizację, inteligentne zarządzanie energią i wykorzystanie odnawialnych źródeł energii w infrastrukturze publicznej. Cel bezpośredni projektu to poprawa efektywności energetycznej budynku użyteczności publicznej w Gminie Rutki poprzez: redukcję kosztów ogrzewania, co wpłynie jednocześnie na obniżenie kosztów funkcjonowania instytucji publicznych, podniesienie świadomości użytkowników budynków użyteczności publicznej w zakresie oszczędności gospodarowania energią. Budżet projektu: 1 124 938,00 zł. Dofinansowanie (75%): 843 077,21 zł. Okres realizacji projektu: XI 2016-XI 2017. (Polish)
0 references
The project’s applicant is Rutka Municipality. The project will consist of a comprehensive thermal modernisation of the building of the Primary School in Grądy-Woniecko by: 1. Insulation of the outer walls of the cellars of the building 2. Warming of the outer walls of the building 3. Warming of ventilated ceiling above building 4. Warming of the unventilated ceiling above the building 5. Replacement of windows in the above-ground part of the building 6. Replacement of the old entrance door to the ground part of building 7. Walling of the luxfer with a gas concrete wall 8. Construction of a new biomass boiler room and a new central heating system 9. Modernisation of lighting in the building. The strategic objective of the project is to improve energy efficiency in the public sector through thermo-modernisation, smart energy management and the use of renewable energy sources in public infrastructure. The direct objective of the project is to improve the energy efficiency of a public utility building in the Rutka Municipality by: reducing heating costs, which at the same time reduces the operating costs of public institutions and raises awareness of users of public buildings in terms of energy efficiency. The budget of the project: 1 124 938,00 PLN. Co-financing (75 %): 843 077,21 PLN. Period of implementation of the project: XI 2016-XI 2017. (English)
20 October 2020
0 references
Identifiers
RPPD.05.03.01-20-0151/16