Construction of the DW 780 route (ul. Prince Józef w Krakowie) with the southern bypass of Cracow — Mirowski intersection (Q112965): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): Construction of a new route of provincial road No 780 with a length of 1 060.20 m from ul. Prince Joseph to be connected to the southern bypass of Kraków — the A4 motorway in the Mirowski node and the extension of provincial road No 780 to a length of 162.5 m (ul. Prince Joseph Józef) and extending the motorway link to the length of 80.50 m in Krakow and the town of Kryspins, the municipality of Liszki, the district of krakowski, Małopolskie P...)
Property / summary
Construction of a new route of provincial road No 780 with a length of 1 060.20 m from ul. Prince Joseph to be connected to the southern bypass of Kraków — the A4 motorway in the Mirowski node and the extension of provincial road No 780 to a length of 162.5 m (ul. Prince Joseph Józef) and extending the motorway link to the length of 80.50 m in Krakow and the town of Kryspins, the municipality of Liszki, the district of krakowski, Małopolskie Province, the intention of the planned investment: 1. As part of the construction of a provincial road, the new mileage of the DW 780 will be carried out in the sections of the national road — motorway A-4: Construction of the intersection of the ‘median roundabout’ between the four traffic tracks and the extension of the junction of the motorway link (ul. Mirowska) — construction and reconstruction of pedestrian and cycle paths — reconstruction of the road ditch — construction and reconstruction of storm water sewerage including sewage systems — construction of street lighting — reconstruction of the average voltage power grid 2. In the framework of the construction of a provincial road, the new course of the DW 780 will be carried out in the following works on the demarcation lines of Provincial Road No 780: — construction of a provincial road No 780 for a width of 7.0 m, with two lanes in Class G to be 2 m. 3.5 m — construction of a bridge over the river Sanka at km 0 + 942 in km of DW780 0 + 668 (1), length of total Lc = 62.0 m, theoretical range Lt = 11,8 + 18,1 + 11.8 m, total length Lc = 13.94 m/14.29 m — construction of a crossroads of a ‘small roundabout’ on a municipal road, — construction of a pavement of a pavement of the river Sanka — construction of a pedestrian cycle — construction of a pavement — building a walker-rollator in the planned road (English)
 
Property / summary: Construction of a new route of provincial road No 780 with a length of 1 060.20 m from ul. Prince Joseph to be connected to the southern bypass of Kraków — the A4 motorway in the Mirowski node and the extension of provincial road No 780 to a length of 162.5 m (ul. Prince Joseph Józef) and extending the motorway link to the length of 80.50 m in Krakow and the town of Kryspins, the municipality of Liszki, the district of krakowski, Małopolskie Province, the intention of the planned investment: 1. As part of the construction of a provincial road, the new mileage of the DW 780 will be carried out in the sections of the national road — motorway A-4: Construction of the intersection of the ‘median roundabout’ between the four traffic tracks and the extension of the junction of the motorway link (ul. Mirowska) — construction and reconstruction of pedestrian and cycle paths — reconstruction of the road ditch — construction and reconstruction of storm water sewerage including sewage systems — construction of street lighting — reconstruction of the average voltage power grid 2. In the framework of the construction of a provincial road, the new course of the DW 780 will be carried out in the following works on the demarcation lines of Provincial Road No 780: — construction of a provincial road No 780 for a width of 7.0 m, with two lanes in Class G to be 2 m. 3.5 m — construction of a bridge over the river Sanka at km 0 + 942 in km of DW780 0 + 668 (1), length of total Lc = 62.0 m, theoretical range Lt = 11,8 + 18,1 + 11.8 m, total length Lc = 13.94 m/14.29 m — construction of a crossroads of a ‘small roundabout’ on a municipal road, — construction of a pavement of a pavement of the river Sanka — construction of a pedestrian cycle — construction of a pavement — building a walker-rollator in the planned road (English) / rank
Normal rank
 

Revision as of 14:34, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the DW 780 route (ul. Prince Józef w Krakowie) with the southern bypass of Cracow — Mirowski intersection
Project in Poland financed by DG Regio

    Statements

    0 references
    13,764,525.88 zloty
    0 references
    3,303,486.21 Euro
    13 January 2020
    0 references
    16,193,559.91 zloty
    0 references
    3,886,454.38 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 November 2015
    0 references
    31 August 2016
    0 references
    WOJEWÓDZTWO MAŁOPOLSKIE
    0 references
    Budowa nowego przebiegu drogi wojewódzkiej nr 780 o długości 1060,20 m od ul. Księcia Józefa do połączenia z południową obwodnicą Krakowa – autostradą A4 w węźle Mirowskim oraz rozbudowa drogi wojewódzkiej nr 780 na długości 162,5 m (ul. Księcia Józefa) i rozbudowa łącznicy autostradowej na długości 80,50 m w Krakowie oraz w miejscowości Kryspinów, gmina Liszki, powiat krakowski, województwo małopolskie Zakres zamierzenia planowanej inwestycji: 1. W ramach budowy drogi wojewódzkiej - nowy przebieg DW 780 realizowane będą następujące roboty budowlane w liniach rozgraniczających pas drogi krajowej – autostrady A-4 : - budowa skrzyżowania skanalizowanego typu "średnie rondo" czterowlotowego - rozbudowa wlotów łącznicy autostradowej (ul. Mirowska) - budowa i przebudowa ciągów pieszo-rowerowych - przebudowa rowu drogowego - budowa i przebudowa kanalizacji deszczowej wraz z przykanalikami - budowa oświetlenia ulicznego - przebudowa sieci elektroenergetycznej średniego napięcia 2. W ramach budowy drogi wojewódzkiej - nowy przebieg DW 780 realizowane będą następujące roboty budowlane w liniach rozgraniczających pas drogi wojewódzkiej nr 780: - budowa drogi wojewódzkiej nr 780 jezdnojezdniowej o szerokości 7,0m, o dwóch pasach ruchu 2x3,5m klasy G odługości 1060,20m - budowa mostu nad rzeką Sanka w km rzeki 0+942, w km DW780 0+668 (1), o długości całkowitej Lc=62,0m, rozpiętości teoretycznej Lt=11,8+18,1+11,8m, szerokości całkowitej B=13,94m / 14,29m - budowa skrzyżowania skanalizowanego typu "małe rondo" czterowlotowego - budowa wlotu północnego z ronda na drogę gminną, - rozbudowa drogi wojewódzkiej nr 780 z chodnikiem, - budowy dojazdu do obsługi i konserwacji projektowanych rowów szczelnych, projektowanych urządzeń podczyszczających, dla służb utrzymaniowych do obsługi projektowanego obiektu mostowego nad rzeką Sanką - budowa ciągu pieszo-rowerowego - budowa chodnika - budowa rowów drogowych nieszczelnych (trapezowych) w ciągu projektowanej drogi wojew (Polish)
    0 references

    Identifiers

    RPMP.07.01.01-12-0062/15
    0 references