Construction of multifunctional recreational paths over Klimkówka reservoir (Q112958): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project involves the construction of a multi-purpose recreational path along the Klimek reservoir, in 2 municipalities: Oil and gorse. The planned route will be rushed through in summer, during the winter period running from the running gear. Length of route 4.323 km.Activities undertaken in the project: 1. Construction work construction construction of multifunctional expressways over the reservoir of Llimkówka 4.323 km, including: 0.485 ...)
(‎Created claim: summary (P836): The subject of the project is the construction of a multifunctional recreational path along the Klimkówka reservoir, within 2 communes: Oil and Gorlicky’s Movement. The track will be designed as a footbike during the summer, and in winter it will be a cross-country skiing trail. Track length 4.323 km. Measures taken in the project:1. Construction work building. multifunctional footpath over Klimkówka reservoir dl. 4,323 km, of which: 0,485 km as...)
Property / summary
 
The subject of the project is the construction of a multifunctional recreational path along the Klimkówka reservoir, within 2 communes: Oil and Gorlicky’s Movement. The track will be designed as a footbike during the summer, and in winter it will be a cross-country skiing trail. Track length 4.323 km. Measures taken in the project:1. Construction work building. multifunctional footpath over Klimkówka reservoir dl. 4,323 km, of which: 0,485 km asphalt pavement, 3,8380 km mineral surface with crushed stone; it’s a broad. 2,0 2,5 m explanation in the letter of the wire including even and recult. ter. green description in point. Q2. Purchase of fixed assets purchase and installation of small tourist architecture, including: building. resting places in the form of benches without backing 8 pcs and outdoor tables 4pcs.assembly of bicycle stands 20pcs.bike world 4pcs assembly of garbage baskets along the bike path 4pcs. installation of information boards with regulations and route plan 4pcs.assembly of protective barriers 828 m³. Promotion of the project’s sources of funding:the execution of 2 information boards, which will be replaced by commemorative plaques, for the duration of the project, with the required markings,implementing stickers for equipment, purchased in the framework of the project, marked in accordance with the requirements of the rules for the promotion of funding sources4. The entire investment process will be supervised by a supervisory inspector, who will ensure compliance of the work performed with the design, regulations and principles of technical knowledge. L. supported tourist and recreational facilities 2018r.1pc. l. facilities tailored to the needs of people with disabilities 2018 1 pieces were adopted in the project along with the infrastructure accompanying as a holistic tourist and recreational facility, hence the value of the indicator 1Result ratios:increase of employment in supported entities other than enterprises 2 jobs of the EPC. (English)
Property / summary: The subject of the project is the construction of a multifunctional recreational path along the Klimkówka reservoir, within 2 communes: Oil and Gorlicky’s Movement. The track will be designed as a footbike during the summer, and in winter it will be a cross-country skiing trail. Track length 4.323 km. Measures taken in the project:1. Construction work building. multifunctional footpath over Klimkówka reservoir dl. 4,323 km, of which: 0,485 km asphalt pavement, 3,8380 km mineral surface with crushed stone; it’s a broad. 2,0 2,5 m explanation in the letter of the wire including even and recult. ter. green description in point. Q2. Purchase of fixed assets purchase and installation of small tourist architecture, including: building. resting places in the form of benches without backing 8 pcs and outdoor tables 4pcs.assembly of bicycle stands 20pcs.bike world 4pcs assembly of garbage baskets along the bike path 4pcs. installation of information boards with regulations and route plan 4pcs.assembly of protective barriers 828 m³. Promotion of the project’s sources of funding:the execution of 2 information boards, which will be replaced by commemorative plaques, for the duration of the project, with the required markings,implementing stickers for equipment, purchased in the framework of the project, marked in accordance with the requirements of the rules for the promotion of funding sources4. The entire investment process will be supervised by a supervisory inspector, who will ensure compliance of the work performed with the design, regulations and principles of technical knowledge. L. supported tourist and recreational facilities 2018r.1pc. l. facilities tailored to the needs of people with disabilities 2018 1 pieces were adopted in the project along with the infrastructure accompanying as a holistic tourist and recreational facility, hence the value of the indicator 1Result ratios:increase of employment in supported entities other than enterprises 2 jobs of the EPC. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of a multifunctional recreational path along the Klimkówka reservoir, within 2 communes: Oil and Gorlicky’s Movement. The track will be designed as a footbike during the summer, and in winter it will be a cross-country skiing trail. Track length 4.323 km. Measures taken in the project:1. Construction work building. multifunctional footpath over Klimkówka reservoir dl. 4,323 km, of which: 0,485 km asphalt pavement, 3,8380 km mineral surface with crushed stone; it’s a broad. 2,0 2,5 m explanation in the letter of the wire including even and recult. ter. green description in point. Q2. Purchase of fixed assets purchase and installation of small tourist architecture, including: building. resting places in the form of benches without backing 8 pcs and outdoor tables 4pcs.assembly of bicycle stands 20pcs.bike world 4pcs assembly of garbage baskets along the bike path 4pcs. installation of information boards with regulations and route plan 4pcs.assembly of protective barriers 828 m³. Promotion of the project’s sources of funding:the execution of 2 information boards, which will be replaced by commemorative plaques, for the duration of the project, with the required markings,implementing stickers for equipment, purchased in the framework of the project, marked in accordance with the requirements of the rules for the promotion of funding sources4. The entire investment process will be supervised by a supervisory inspector, who will ensure compliance of the work performed with the design, regulations and principles of technical knowledge. L. supported tourist and recreational facilities 2018r.1pc. l. facilities tailored to the needs of people with disabilities 2018 1 pieces were adopted in the project along with the infrastructure accompanying as a holistic tourist and recreational facility, hence the value of the indicator 1Result ratios:increase of employment in supported entities other than enterprises 2 jobs of the EPC. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:34, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of multifunctional recreational paths over Klimkówka reservoir
Project in Poland financed by DG Regio

    Statements

    0 references
    2,703,786.49 zloty
    0 references
    648,908.76 Euro
    13 January 2020
    0 references
    4,005,609.62 zloty
    0 references
    961,346.31 Euro
    13 January 2020
    0 references
    67.5 percent
    0 references
    1 February 2017
    0 references
    31 December 2020
    0 references
    POWIAT GORLICKI
    0 references
    Przedmiotem projektu jest budowa wielofunkcyjnej ścieżki rekreacyjnej wzdłuż zbiornika Klimkówka, na terenie 2 gmin: Ropy i Uścia Gorlickiego. Projektowana ścieżka pełnić będzie funkcje pieszorowerowe w okresie letnim, w okresie zimowym będzie trasą narciarstwa biegowego. Dł. trasy 4,323 km.Działania podejmowane w projekcie:1. Roboty budowlane bud. wielofunkcyjnej ścieżki pieszorowerowej nad Zbiornikiem Klimkówka dł. 4,323 km, w tym: 0,485 km nawierzchnia asfaltowa, 3,8380 km nawierzchnia mineralna z tłucznia kamiennego; szer. 2,0 2,5m wyjaśnienie w piśmie przewod. wraz z wyrówn. i rekult. ter. ziel. opis w pkt. Q2. Zakup środków trwałych zakup i instalacja małej architektury turystycznej, w tym: bud. miejsc odpoczynku w formie ławek bez oparcia 8 szt. i stołów plenerowych 4szt.montaż miejsc dla rowerów stojaki rowerowe 20szt.bud. wiat rowerowych 4szt.montaż koszy na śmieci wzdłuż ścieżki rowerowej 4szt.montaż tablic informacyjnych z regulaminem i planem trasy 4szt.montaż barier ochronnych 828 m3. Promocja źródeł finansowania projektu:wykonanie 2 tablic informac., które po zakończeniu prac zastąpione będą tablicami pamiątkowymi, na okres trwałości projektu, z wymaganymi oznaczeniamiwykonanie naklejektabliczek na sprzęt, kupowany w ramach projektu oznaczone zgodnie z wymogami zasad promocji źródeł finansowania4. Nad całością procesu inwest. czuwać będzie inspektor nadzoru, który zapewni kontrolę zgodności wykonywanych robót z projektem, przepisami i zasadami wiedzy techn.Wskaźniki produktu: l. wspartych obiektów turystycznych i rekreacyjnych 2018r.1szt. l. obiektów dostosowanych do potrzeb osób z niepełnosprawnościami 2018r. 1 szt. przyjęto ścieżki realizowane w projekcie wraz z infrastrukturą towarzyszącą jako całościowy obiekt turystyczny i rekreacyjny stąd wartość wskaźnika 1Wskaźniki rezultatu:wzrost zatrudnienia we wspieranych podmiotach innych niż przedsiębiorstwa 2 miejsca pracy EPC. (Polish)
    0 references
    The subject of the project is the construction of a multifunctional recreational path along the Klimkówka reservoir, within 2 communes: Oil and Gorlicky’s Movement. The track will be designed as a footbike during the summer, and in winter it will be a cross-country skiing trail. Track length 4.323 km. Measures taken in the project:1. Construction work building. multifunctional footpath over Klimkówka reservoir dl. 4,323 km, of which: 0,485 km asphalt pavement, 3,8380 km mineral surface with crushed stone; it’s a broad. 2,0 2,5 m explanation in the letter of the wire including even and recult. ter. green description in point. Q2. Purchase of fixed assets purchase and installation of small tourist architecture, including: building. resting places in the form of benches without backing 8 pcs and outdoor tables 4pcs.assembly of bicycle stands 20pcs.bike world 4pcs assembly of garbage baskets along the bike path 4pcs. installation of information boards with regulations and route plan 4pcs.assembly of protective barriers 828 m³. Promotion of the project’s sources of funding:the execution of 2 information boards, which will be replaced by commemorative plaques, for the duration of the project, with the required markings,implementing stickers for equipment, purchased in the framework of the project, marked in accordance with the requirements of the rules for the promotion of funding sources4. The entire investment process will be supervised by a supervisory inspector, who will ensure compliance of the work performed with the design, regulations and principles of technical knowledge. L. supported tourist and recreational facilities 2018r.1pc. l. facilities tailored to the needs of people with disabilities 2018 1 pieces were adopted in the project along with the infrastructure accompanying as a holistic tourist and recreational facility, hence the value of the indicator 1Result ratios:increase of employment in supported entities other than enterprises 2 jobs of the EPC. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.06.03.03-12-0319/17
    0 references