Construction of sewage treatment plant in Poznachowice Dolny with the extension of sewage network in Wiśniowa and Poznachowice Dolny_2 (Q112710): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Construction of sewage treatment plant in Poznachowice Dolny with the extension of sewage network in Wiśniowa and Poznachowice Dolny_2

Revision as of 12:41, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of sewage treatment plant in Poznachowice Dolny with the extension of sewage network in Wiśniowa and Poznachowice Dolny_2
Project in Poland financed by DG Regio

    Statements

    0 references
    10,114,667.18 zloty
    0 references
    2,427,520.12 Euro
    13 January 2020
    0 references
    19,156,566.75 zloty
    0 references
    4,597,576.02 Euro
    13 January 2020
    0 references
    52.8 percent
    0 references
    2 May 2018
    0 references
    31 December 2020
    0 references
    GMINA WIŚNIOWA
    0 references
    0 references
    Przedmiotem projektu jest budowa sieci kanalizacji grawitacyjnej i ciśnieniowej na terenie miejscowości Wiśniowa i Poznachowice Dolne oraz budowa nowej oczyszczalni ścieków na terenie miejscowości Poznachowice Dolne.Inwestycja w zakresie sieci kanalizacyjnej zostanie wykonana na terenie miejscowości Wiśniowa i Poznachowice Dolne na obszarach dotąd nieskanalizowanych i znajdujących się w obszarze aglomeracji Wiśniowa. Podstawowe parametry i założenia budowanej sieci: podstawową formą dla terenów o zabudowie zwartej i skupionej będzie zbiorcza kanalizacja grawitacyjna zrealizowana jako trzy główne kolektory kanalizacji sanitarnej dla potrzeb przekroczenia cieku wodnego pn. Krzyworzeka wykonane zostaną przewierty rurą ciśnieniową oraz lokalne przepompownie P1; P2; P3Sieć kanalizacyjna pracować będzie w układzie grawitacyjnotłocznym. Układ sieci dostosowano do istniejącego przebiegu dróg. Planowana długość kanalizacji grawitacyjnej to ok. 14,933 km łącznie z przykanalikami, kanały tłoczne o dł. ok. 0,187 km. Łączna długość sieci kanalizacyjnej to ok. 15,12 km.Ścieki z projektowanej sieci kanalizacyjnej będą prowadzone do nowo budowanej mechanicznobiologicznej oczyszczalni, która zgodnie z założeniami projektowymi będzie spełnia wymagania wynikające z przepisów prawa w zakresie oczyszczania ścieków komunalnych. W szczególności oczyszczalnia będzie spełniać wymagania Dyrektywy Rady 91271EWG z dnia 21 maja 1991 r. dotyczącej oczyszczania ścieków komunalnych Dz. U. L 13540 z 30.5.1991 oraz Rozporządzenia Ministra Środowiska z dnia 18 listopada 2014 r. w sprawie warunków, jakie należy spełnić przy wprowadzaniu ścieków do wód lub ziemi, oraz w sprawie substancji szczególnie szkodliwych dla środowiskawodnego Dz. U. 2014 poz. 1800 dla RLM w zakresie 2.000 9 999 tj. MINIMALNE poziomy oczyszczania osiągną:ChZT125 mg O2l 87,2BZT525 mg O2l 95ZO 35mg O2l 92,4Ciąg dalszy informacji w punkcie Q. (Polish)
    0 references
    The subject of the project is the construction of a gravitational and pressure sewage system in Wiśniowa and Poznachowice Dolne and the construction of a new sewage treatment plant in Poznachowice Dolne.The investment in the sewage network will be carried out in Wiśniowa and Poznachowice Dolne in areas unscanised and located in the area of Wiśniowa agglomeration. Basic parameters and assumptions of the network being built: the basic form for areas with compact and concentrated construction will be the aggregate gravity sewer system realised as three main collectors of sanitary sewage system for the needs of crossing the watercourse Bn. Krzyworzeka will be drilled with pressure pipe and local pumping stations P1; P2; P3The sewer network will work in the gravity system. The layout of the network was adapted to the existing route of roads. The planned length of gravity drainage is approx. 14.933 km including canals, pressing channels approx. It’s 0,187 miles. The total length of the sewer network is approx. 15.12 km.The sewage from the designed sewage network will be carried out to a newly built mechanical biological treatment plant, which according to the design assumptions will meet the requirements arising from the legal regulations concerning the treatment of municipal waste water. In particular, the treatment plant will comply with the requirements of Council Directive 91271EEC of 21 May 1991 concerning urban waste water treatment. U. L 13540 of 30.5.1991 and the Ordinance of the Minister of the Environment of 18 November 2014 on the conditions to be fulfilled when introducing sewage into water or land, and on substances particularly harmful to the environment, Journal of the European Union (Journal of Laws). U. 2014 pos. 1800 for RLM in the range 2.000 9 999 i.e. Minimum purification levels will be reached: COD125 mg O2 l 87.2BZT525 mg O2 l 95ZO 35 mg O2 l 92.4For further information, see section Q. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.05.03.02-12-1001/17
    0 references