Implementation of innovative Archonex technology — coupling of casing to threaded and welded to drill holes up to 150 m (Q111939): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): This investment includes the implementation of research results on innovative technology for the drilling of boreholes in Archonun.Implementation of the technology is the result of research carried out in collaboration with the Scientific Unit of the Department of Wiertnictwo and GeoEngineering WWN AGH. BR’s work was carried out in the framework of MROP 20142020, Measure 1.2.3 on innovation. The Archonex system permits the drilling of borehole...) |
(Created claim: summary (P836): This investment includes the implementation of research results in the field of innovative drilling technology in the Archonex system.The implementation of technology is the result of research work carried out in cooperation with the scientific unit of the Department of Drilling and Geoengineering of WWNiG AGH. The BR work was carried out as part of the MRPO 20142020, Action 1.2.3 Bones for innovation. The Archonex system allows for drilling hol...) |
||||||||||||||
Property / summary | |||||||||||||||
This investment includes the implementation of research results in the field of innovative drilling technology in the Archonex system.The implementation of technology is the result of research work carried out in cooperation with the scientific unit of the Department of Drilling and Geoengineering of WWNiG AGH. The BR work was carried out as part of the MRPO 20142020, Action 1.2.3 Bones for innovation. The Archonex system allows for drilling holes up to a depth of approx. 150 m i.e. typical depth of hole heat exchangers with simultaneous tubing and draining of the wash, thus eliminating all current problems of the geoengineering industry. (English) | |||||||||||||||
Property / summary: This investment includes the implementation of research results in the field of innovative drilling technology in the Archonex system.The implementation of technology is the result of research work carried out in cooperation with the scientific unit of the Department of Drilling and Geoengineering of WWNiG AGH. The BR work was carried out as part of the MRPO 20142020, Action 1.2.3 Bones for innovation. The Archonex system allows for drilling holes up to a depth of approx. 150 m i.e. typical depth of hole heat exchangers with simultaneous tubing and draining of the wash, thus eliminating all current problems of the geoengineering industry. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: This investment includes the implementation of research results in the field of innovative drilling technology in the Archonex system.The implementation of technology is the result of research work carried out in cooperation with the scientific unit of the Department of Drilling and Geoengineering of WWNiG AGH. The BR work was carried out as part of the MRPO 20142020, Action 1.2.3 Bones for innovation. The Archonex system allows for drilling holes up to a depth of approx. 150 m i.e. typical depth of hole heat exchangers with simultaneous tubing and draining of the wash, thus eliminating all current problems of the geoengineering industry. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 12:35, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Implementation of innovative Archonex technology — coupling of casing to threaded and welded to drill holes up to 150 m |
Project in Poland financed by DG Regio |
Statements
350,000.0 zloty
0 references
700,000.0 zloty
0 references
50.0 percent
0 references
8 May 2019
0 references
8 May 2021
0 references
ARCHON SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Przedmiotowa inwestycja obejmuje wdrożenie wyników badań w zakresie innowacyjnej technologii wykonywania otworów wiertniczych w systemie Archonex.Wdrożenie technologii jest wynikiem prac badawczych zrealizowanych przy współpracy z jednostką naukową Katedra Wiertnictwa i Geoinżynierii WWNiG AGH. Prace BR zostały przeprowadzone w ramach MRPO 20142020, Działanie 1.2.3 Bony na innowacje. System Archonex pozwala na wykonywanie otworów wiertniczych do głębokości ok. 150 m a więc typowej głębokości otworowych wymienników ciepła z jednoczesnym rurowaniem i odprowadzeniem płuczki, dzięki czemu eliminuje wszystkie aktualne problemy branży geoinżynieryjnej. (Polish)
0 references
This investment includes the implementation of research results in the field of innovative drilling technology in the Archonex system.The implementation of technology is the result of research work carried out in cooperation with the scientific unit of the Department of Drilling and Geoengineering of WWNiG AGH. The BR work was carried out as part of the MRPO 20142020, Action 1.2.3 Bones for innovation. The Archonex system allows for drilling holes up to a depth of approx. 150 m i.e. typical depth of hole heat exchangers with simultaneous tubing and draining of the wash, thus eliminating all current problems of the geoengineering industry. (English)
20 October 2020
0 references
Identifiers
RPMP.03.04.04-12-0071/18
0 references