Construction of a sewage treatment plant in the village of Krempacha with the construction of a sewerage network in the village of Krempascha. (Q112669): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The investment will be constructed with 10.75 km of sewerage network in the Kremlin: DN 300 160 mm, with a length of 7 362.10 m, and gravity connections for the PVC 160 mm PVC and 50 mm PE pipes with a total length of 3 393.60 mm. the investment also includes the construction of a mechanical internal sewage treatment plant in the village of Krempascha. Treatment of treatment plants: maximum hourly flow Qhmax 76,7 m3h average flow Qdpr 500 m3D...) |
||
Property / summary | |||
Property / summary: The investment will be constructed with 10.75 km of sewerage network in the Kremlin: DN 300 160 mm, with a length of 7 362.10 m, and gravity connections for the PVC 160 mm PVC and 50 mm PE pipes with a total length of 3 393.60 mm. the investment also includes the construction of a mechanical internal sewage treatment plant in the village of Krempascha. Treatment of treatment plants: maximum hourly flow Qhmax 76,7 m3h average flow Qdpr 500 m3D flow max day Qdmax 800 m3dw WWTP construction in m. Krempacha is planned to be built: social building: volume 611 m³, powazab. 135.59 m² technology building: 750 m³, 138.78 m² building sediment drainage building: 533 m³, 106,56 m2Compliance by the agglomeration to be covered by the draft provisions of the Urban Waste Water Treatment Directive: Status prior to implementation. a load of the p.e. of 0 p.e. in cargo 0Level IAS load link 0IAS systems and other appropriate systems: in cargo 0, the UWWTP serving a given agglomeration of urban waste water which is serving a p.e. of 0 RLMExisting treatment to treat secondary treatment to the treatment of 0 p.e. of the treatment after implementation: agglomeration load 2660p.e. in load 70,68 W m. in load 0The capacity of the urban waste water treatment plant serving the agglomeration concerned with the p.e. of the plant is new, the capacity of the treatment plant 500md ensures that the whole load of the agglomeration 3767Compulsory depuration is cleaned up: BOD525, COD125, SS35, N15, P2Treatment efficiency 500 md (English) / rank | |||
Revision as of 12:28, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a sewage treatment plant in the village of Krempacha with the construction of a sewerage network in the village of Krempascha. |
Project in Poland financed by DG Regio |
Statements
4,687,346.37 zloty
0 references
6,260,647.02 zloty
0 references
74.87 percent
0 references
1 October 2017
0 references
31 December 2019
0 references
GMINA NOWY TARG
0 references
W ramach inwestycji wybudowane zostanie 10,75 km sieci kanalizacyjnej w m. Krempachy: DN 300 160 mm o długości 7.362,10 m oraz przyłączy grawitacyjnych rury PCV 160 mm i tłocznych rury PE 50 mm o łącznej długości 3.393,60 mb.Inwestycja zakłada też budowę mechanicznobiologicznej oczyszczalni ścieków w miejscowości Krempachy. Wydajność oczyszczalni: przepływ max godzinowy Qhmax 76,7 m3h przepływ średniodobowy Qdśr 500 m3d przepływ max dobowy Qdmax 800 m3dW ramach budowy oczyszczalni ścieków w m. Krempachy planuje się budowę: budynek socjalny: kubatura 611 m3, pow. zab. 135,59 m2 budynek technologiczny: 750 m3, 138,78 m2 budynek odwadniania osadów: 533 m3, 106,56 m2Przestrzegania przez aglomerację będącą przedmiotem projektu przepisów dyrektywy dotyczącej oczyszczania ścieków komunalnych: Stan przed realizacją.Ładunek aglomeracji RLM 0Poziom zbierania w ładunku 0Poziom powiązania w ładunku 0IAS pojedyncze systemy i inne właściwe systemy: w ładunku 0Wydajność oczyszczalni ścieków komunalnych obsługującej daną aglomerację RLM 0 RLMObowiązujący poziom oczyszczania oczyszczanie wtórneWydajność oczyszczania 0 RLM Stan po realizacji:Ładunek aglomeracji RLM 2660Poziom zbierania w ładunku 70,68 W m. Nowa Biała część kanalizacji zostanie wybudowana w późn. terminie.Poziom powiązania w ładunku 70,68IAS pojedyncze systemy i inne właściwe systemy: w ładunku 0Wydajność oczyszczalni ścieków komunalnych obsługującej daną aglomerację RLM Obiekt nowy, wydajność oczyszczalni 500md, zapewnia oczyścić cały ładunek aglomeracji 3767Obowiązujący poziom oczyszczania: BZT525, ChZT125, SS35, N15, P2Wydajność oczyszczania 500 md (Polish)
0 references