‘Remont and expansion of the selective municipal waste collection point on plots Nos 110/8 and 110/9, of the municipality of Muszyna’ (Q112610): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is to achieve an extremely green public target. It meets the objectives of the Waste Management Plan for Muszyna Town and Municipality, as well as in the local zoning plan, laying down the principles of waste management and taking into account the findings of the Plan for the Conservation of the Park Landscape Park. The project will contribute to clean-up the management of municipal waste in the area of the town and...)
(‎Created claim: summary (P836): The aim of the project is to achieve a public objective, which is highly environmentally friendly. It meets the objectives enshrined in the Waste Management Plan for the City and Municipality of Muszyna and in the local spatial planning plan, defining the principles of waste management, and taking into account the findings of the Plan for the Protection of Popradzki Landscape Park. The implementation of the project will contribute to order manag...)
Property / summary
 
The aim of the project is to achieve a public objective, which is highly environmentally friendly. It meets the objectives enshrined in the Waste Management Plan for the City and Municipality of Muszyna and in the local spatial planning plan, defining the principles of waste management, and taking into account the findings of the Plan for the Protection of Popradzki Landscape Park. The implementation of the project will contribute to order management of municipal waste in the area of Muszyna City and Spa Commune, thus limiting the nuisances for all elements of the environment caused by human life and economic activity.The project proposes the following solutions: The reconstruction of the building will consist of changing the shape of the roof and warming the outer walls. Construction of a freestanding shelter in steel structure. Modernisation of the rainwater drainage system that drains rainwater from the roof of the farm building and paved to the existing rainwater drainage system. Manufacture of petroleum-derived separator as the final element of the rainwater drainage system. Water supplied from the municipal water supply. Electric current from the existing switch.Communication service: The designed paved interior roads and squares, the orderly surface will be cured by making a new pavement of 8 cm thick paving on cement and sandstone. The waste delivered shall be recorded only in descriptive, quantitative and weighing manners. The solutions adopted in the project are consistent with the best solutions in the field of waste management, optimal design solutions for the development of available land and guaranteeing the correct valuation of investment outlays.PSZOK Powroźnik will be operated by the workshop (English)
Property / summary: The aim of the project is to achieve a public objective, which is highly environmentally friendly. It meets the objectives enshrined in the Waste Management Plan for the City and Municipality of Muszyna and in the local spatial planning plan, defining the principles of waste management, and taking into account the findings of the Plan for the Protection of Popradzki Landscape Park. The implementation of the project will contribute to order management of municipal waste in the area of Muszyna City and Spa Commune, thus limiting the nuisances for all elements of the environment caused by human life and economic activity.The project proposes the following solutions: The reconstruction of the building will consist of changing the shape of the roof and warming the outer walls. Construction of a freestanding shelter in steel structure. Modernisation of the rainwater drainage system that drains rainwater from the roof of the farm building and paved to the existing rainwater drainage system. Manufacture of petroleum-derived separator as the final element of the rainwater drainage system. Water supplied from the municipal water supply. Electric current from the existing switch.Communication service: The designed paved interior roads and squares, the orderly surface will be cured by making a new pavement of 8 cm thick paving on cement and sandstone. The waste delivered shall be recorded only in descriptive, quantitative and weighing manners. The solutions adopted in the project are consistent with the best solutions in the field of waste management, optimal design solutions for the development of available land and guaranteeing the correct valuation of investment outlays.PSZOK Powroźnik will be operated by the workshop (English) / rank
 
Normal rank
Property / summary: The aim of the project is to achieve a public objective, which is highly environmentally friendly. It meets the objectives enshrined in the Waste Management Plan for the City and Municipality of Muszyna and in the local spatial planning plan, defining the principles of waste management, and taking into account the findings of the Plan for the Protection of Popradzki Landscape Park. The implementation of the project will contribute to order management of municipal waste in the area of Muszyna City and Spa Commune, thus limiting the nuisances for all elements of the environment caused by human life and economic activity.The project proposes the following solutions: The reconstruction of the building will consist of changing the shape of the roof and warming the outer walls. Construction of a freestanding shelter in steel structure. Modernisation of the rainwater drainage system that drains rainwater from the roof of the farm building and paved to the existing rainwater drainage system. Manufacture of petroleum-derived separator as the final element of the rainwater drainage system. Water supplied from the municipal water supply. Electric current from the existing switch.Communication service: The designed paved interior roads and squares, the orderly surface will be cured by making a new pavement of 8 cm thick paving on cement and sandstone. The waste delivered shall be recorded only in descriptive, quantitative and weighing manners. The solutions adopted in the project are consistent with the best solutions in the field of waste management, optimal design solutions for the development of available land and guaranteeing the correct valuation of investment outlays.PSZOK Powroźnik will be operated by the workshop (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:27, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
‘Remont and expansion of the selective municipal waste collection point on plots Nos 110/8 and 110/9, of the municipality of Muszyna’
Project in Poland financed by DG Regio

    Statements

    0 references
    853,881.95 zloty
    0 references
    204,931.67 Euro
    13 January 2020
    0 references
    1,004,567.0 zloty
    0 references
    241,096.08 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 September 2019
    0 references
    31 December 2020
    0 references
    PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ SP. Z O. O. W MUSZYNIE
    0 references
    0 references
    Przedmiotem przedsięwzięcie jest osiągnięcie celu publicznego, mającego charakter wybitnie proekologiczny. Spełnia ono cele zapisane w Planie Gospodarki Odpadami dla Miasta i Gminy Muszyna oraz w miejscowym planie zagospodarowania przestrzennego, określającym zasady gospodarki odpadami, oraz uwzględniającym ustalenia Planu Ochrony Popradzkiego Parku Krajobrazowego. Realizacja przedsięwzięcia przyczyni się do uporządkowania gospodarki odpadami komunalnymi na obszarze Miasta i Gminy Uzdrowiskowej Muszyna, co za tym idzie ograniczy uciążliwości dla wszystkich elementów środowiska naturalnego spowodowane bytowaniem i działalnością gospodarczą człowieka.Projekt przedsięwzięcia proponuje następujące rozwiązania: Przebudowa budynku gospodarczego przebudowa polegać będzie na zmianie kształtu dachu oraz ociepleniu ścian zewnętrznych. Budowa wolnostojącej wiaty w konstrukcji stalowej. Wykonanie modernizacji instalacji kanalizacji deszczowej odprowadzającej wody opadowe z dachu budynku gospodarczego oraz nawierzchni utwardzonej do istniejącej instalacji kanalizacji deszczowej. Wykonanie separatora substancji ropopochodnych jako końcowego elementu systemu kanalizacji deszczowej.Zaopatrzenie w media: Woda dostarczana z wodociągu gminnego. prąd elektryczny z istniejącego przyłacza.Obsługa komunikacyjna: Projektowane utwardzone drogi wewnętrzne i place, uporządkowana powierzchnia zostanie utwardzona poprzez wykonanie nowej nawierzchni z kostki brukowej o grubości 8 cm na podsypce cementowo piaskowej. Oddawane odpady są ewidencjonowane tylko w sposób opisowy, ilościowy i wagowy. Po wyremontowania, PSZOK będzie wykorzystywał będącą obecnie na wyposażeniu wagę.Przyjęte w projekcie rozwiązania są zgodne z najlepszymi rozwiązaniami w dziedzinie gospodarki odpadami, zastosowano rozwiązania projektowe optymalne dla zagospodarowania dostępnego terenu oraz gwarantujące prawidłową wycenę nakładów inwestycyjnych.PSZOK Powroźnik będzie obsługiwany przez pracowni (Polish)
    0 references
    The aim of the project is to achieve a public objective, which is highly environmentally friendly. It meets the objectives enshrined in the Waste Management Plan for the City and Municipality of Muszyna and in the local spatial planning plan, defining the principles of waste management, and taking into account the findings of the Plan for the Protection of Popradzki Landscape Park. The implementation of the project will contribute to order management of municipal waste in the area of Muszyna City and Spa Commune, thus limiting the nuisances for all elements of the environment caused by human life and economic activity.The project proposes the following solutions: The reconstruction of the building will consist of changing the shape of the roof and warming the outer walls. Construction of a freestanding shelter in steel structure. Modernisation of the rainwater drainage system that drains rainwater from the roof of the farm building and paved to the existing rainwater drainage system. Manufacture of petroleum-derived separator as the final element of the rainwater drainage system. Water supplied from the municipal water supply. Electric current from the existing switch.Communication service: The designed paved interior roads and squares, the orderly surface will be cured by making a new pavement of 8 cm thick paving on cement and sandstone. The waste delivered shall be recorded only in descriptive, quantitative and weighing manners. The solutions adopted in the project are consistent with the best solutions in the field of waste management, optimal design solutions for the development of available land and guaranteeing the correct valuation of investment outlays.PSZOK Powroźnik will be operated by the workshop (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.05.02.02-12-0501/17
    0 references