(‎Removed claim: summary (P836): The project relates to the exchange of low carbon energy boilers for biomass and gas using biomass and gas, with the use of in-house works. Awareness raising activities are an integral part of it. The old boiler will be eliminated and disposed of. CO2 74,84 emissions reduction CO2 emissions will be reduced: before 576,1028, after implementation of 144,97 Mg10 99,92 and PM2,5 99,8emissions, particulate matter PM10 emissions before 2,104991, aft...)
(‎Created claim: summary (P836): The project concerns the replacement of low-efficiency coal boilers for biomass and gas equipment, with possibly internal installation work. An integral part of it is to raise environmental awareness. The old boiler will be liquidated and disposed of. CO2 emission reduction 74.84 CO2 emissions: before 576.1028, after 144.97 Mgrok reduction of PM10 PM10 99.92 and PM2.5 99.8 PM10 dust emissions before 2.104991, after 0.001743 Mgrok and PM2.5 befor...)
Property / summary
 
The project concerns the replacement of low-efficiency coal boilers for biomass and gas equipment, with possibly internal installation work. An integral part of it is to raise environmental awareness. The old boiler will be liquidated and disposed of. CO2 emission reduction 74.84 CO2 emissions: before 576.1028, after 144.97 Mgrok reduction of PM10 PM10 99.92 and PM2.5 99.8 PM10 dust emissions before 2.104991, after 0.001743 Mgrok and PM2.5 before 0.8863 and after project 0.001743 Mgrok. There is no boiler room or district heating system in the municipality. The project does not involve connection to the district heating network. There are no plans to build a network. Information activities are planned: organisation of 2 meetings, preparation: leaflets and information articles at www.pcim.pl Referred to 2 belowRecipients: residents of the municipalityThese actions will promote green attitudes and a sense of responsibility for the state of the environment in terms of improving energy efficiency, saving natural resources or reducing low emissions. They will include the following: saving natural resources; reductions in low emissions; improving energy efficiency.The commune does not plan to prepare a cover programme.The commune is one of the areas where corrective action is needed in the existing POP. Envisaged decommissioning scale for solid fuel equipment: 1170 pcs; the expansion of the gas networks. 330 new uses..The project is indicated in PGN. PGN has been reviewed and received confirmation of WFOŚiGW.Assessment of air quality in the voivodship includes the Municipality among the areas of exceedance: PM10 dust 24 hours and BaProk. The dominant fuel group in the household sector is coal: 56 PGN provides for remedial action 3 Reducing energy consumption and power generation from RES. 3.2 and 3.3.The project will not be implemented in the spa villages.The project responds to the problems identified (English)
Property / summary: The project concerns the replacement of low-efficiency coal boilers for biomass and gas equipment, with possibly internal installation work. An integral part of it is to raise environmental awareness. The old boiler will be liquidated and disposed of. CO2 emission reduction 74.84 CO2 emissions: before 576.1028, after 144.97 Mgrok reduction of PM10 PM10 99.92 and PM2.5 99.8 PM10 dust emissions before 2.104991, after 0.001743 Mgrok and PM2.5 before 0.8863 and after project 0.001743 Mgrok. There is no boiler room or district heating system in the municipality. The project does not involve connection to the district heating network. There are no plans to build a network. Information activities are planned: organisation of 2 meetings, preparation: leaflets and information articles at www.pcim.pl Referred to 2 belowRecipients: residents of the municipalityThese actions will promote green attitudes and a sense of responsibility for the state of the environment in terms of improving energy efficiency, saving natural resources or reducing low emissions. They will include the following: saving natural resources; reductions in low emissions; improving energy efficiency.The commune does not plan to prepare a cover programme.The commune is one of the areas where corrective action is needed in the existing POP. Envisaged decommissioning scale for solid fuel equipment: 1170 pcs; the expansion of the gas networks. 330 new uses..The project is indicated in PGN. PGN has been reviewed and received confirmation of WFOŚiGW.Assessment of air quality in the voivodship includes the Municipality among the areas of exceedance: PM10 dust 24 hours and BaProk. The dominant fuel group in the household sector is coal: 56 PGN provides for remedial action 3 Reducing energy consumption and power generation from RES. 3.2 and 3.3.The project will not be implemented in the spa villages.The project responds to the problems identified (English) / rank
 
Normal rank
Property / summary: The project concerns the replacement of low-efficiency coal boilers for biomass and gas equipment, with possibly internal installation work. An integral part of it is to raise environmental awareness. The old boiler will be liquidated and disposed of. CO2 emission reduction 74.84 CO2 emissions: before 576.1028, after 144.97 Mgrok reduction of PM10 PM10 99.92 and PM2.5 99.8 PM10 dust emissions before 2.104991, after 0.001743 Mgrok and PM2.5 before 0.8863 and after project 0.001743 Mgrok. There is no boiler room or district heating system in the municipality. The project does not involve connection to the district heating network. There are no plans to build a network. Information activities are planned: organisation of 2 meetings, preparation: leaflets and information articles at www.pcim.pl Referred to 2 belowRecipients: residents of the municipalityThese actions will promote green attitudes and a sense of responsibility for the state of the environment in terms of improving energy efficiency, saving natural resources or reducing low emissions. They will include the following: saving natural resources; reductions in low emissions; improving energy efficiency.The commune does not plan to prepare a cover programme.The commune is one of the areas where corrective action is needed in the existing POP. Envisaged decommissioning scale for solid fuel equipment: 1170 pcs; the expansion of the gas networks. 330 new uses..The project is indicated in PGN. PGN has been reviewed and received confirmation of WFOŚiGW.Assessment of air quality in the voivodship includes the Municipality among the areas of exceedance: PM10 dust 24 hours and BaProk. The dominant fuel group in the household sector is coal: 56 PGN provides for remedial action 3 Reducing energy consumption and power generation from RES. 3.2 and 3.3.The project will not be implemented in the spa villages.The project responds to the problems identified (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:09, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Replacement of inefficient heat sources in the home of PVC (biomass and gaseous fuels)
Project in Poland financed by DG Regio

    Statements

    0 references
    699,997.23 zloty
    0 references
    167,999.34 Euro
    13 January 2020
    0 references
    717,855.42 zloty
    0 references
    172,285.30 Euro
    13 January 2020
    0 references
    97.51 percent
    0 references
    9 February 2017
    0 references
    28 November 2019
    0 references
    GMINA PCIM
    0 references
    0 references
    Projekt dotyczy wymiany niskosprawnych kotłów węglowych na urządzenia wykorzystujące biomasę i gaz, z ew. wykonaniem prac w ramach instalacji wewnętrznej. Integralną jego częścią są działania na rzecz podniesienia świadomości ekologicznej. Stary kocioł będzie zlikwidowany i zutylizowany. redukcji emisji CO2 74,84Emisja CO2 : przed 576,1028 , po realizacji 144,97 Mgrok redukcji emisji pyłu PM10 99,92 i PM2,5 99,8Emisja pyłu PM10 przed 2,104991, po realizacji 0,001743 Mgrok i PM2,5 przed 0,8863 i po realizacji projektu 0,001743 Mgrok. W Gminie nie ma kotłowni zbiorczej i sieci ciepłowniczej. Projekt nie zakłada podłączenia do sieci ciepłow. Nie przewiduje się budowy sieci. Planuje się działania informacyjne: organizacja 2 spotkań, przygotowanie: ulotek i art informacyjnych na www.pcim.pl Zad 2 poniżejOdbiorcy: mieszkańcy gminyDziałania te będą promować postawy proekologiczne oraz poczucie odpowiedzialności za stan środowiska w zakresie poprawy efektywności energetycznej, oszczędności zasobów naturalnych lub obniżenia niskiej emisji. Będą obejmować tem.: oszczędności zasobów naturalnych; obniżenia niskiej emisji; poprawy efektywności energetycznej.Gmina nie planuje przygotowania programu osłonowego.Gmina należy do obszarów, na których konieczne jest podjęcie działań naprawczych w obowiązującym POP. Przewidziana skala likwidacji urządzeń na paliwa stałe: 1170szt.; rozbudowa sieci gazowych podł. 330 nowych użyt..Projekt został wskazany w PGN. PGN został zaopiniowany i uzyskał potwierdzenie WFOŚiGW.Ocena jakości powietrza w województwie zalicza Gminę do obszarów przekroczeń: pyłu PM10 24 godz.oraz BaProk. Dominującą grupą paliw w sektorze gospodarstw domowych jest węgiel: 56 PGN przewiduje działanie naprawcze 3 Ograniczenie zużycia energii i wytwarzanie energii z OZEbud.mieszkaniowezad. 3.2 i 3.3.Projekt nie będzie realizowany na terenie miejscowości uzdrowiskowych.Projekt odpowiada na zidentyfikowane problemy (Polish)
    0 references
    The project concerns the replacement of low-efficiency coal boilers for biomass and gas equipment, with possibly internal installation work. An integral part of it is to raise environmental awareness. The old boiler will be liquidated and disposed of. CO2 emission reduction 74.84 CO2 emissions: before 576.1028, after 144.97 Mgrok reduction of PM10 PM10 99.92 and PM2.5 99.8 PM10 dust emissions before 2.104991, after 0.001743 Mgrok and PM2.5 before 0.8863 and after project 0.001743 Mgrok. There is no boiler room or district heating system in the municipality. The project does not involve connection to the district heating network. There are no plans to build a network. Information activities are planned: organisation of 2 meetings, preparation: leaflets and information articles at www.pcim.pl Referred to 2 belowRecipients: residents of the municipalityThese actions will promote green attitudes and a sense of responsibility for the state of the environment in terms of improving energy efficiency, saving natural resources or reducing low emissions. They will include the following: saving natural resources; reductions in low emissions; improving energy efficiency.The commune does not plan to prepare a cover programme.The commune is one of the areas where corrective action is needed in the existing POP. Envisaged decommissioning scale for solid fuel equipment: 1170 pcs; the expansion of the gas networks. 330 new uses..The project is indicated in PGN. PGN has been reviewed and received confirmation of WFOŚiGW.Assessment of air quality in the voivodship includes the Municipality among the areas of exceedance: PM10 dust 24 hours and BaProk. The dominant fuel group in the household sector is coal: 56 PGN provides for remedial action 3 Reducing energy consumption and power generation from RES. 3.2 and 3.3.The project will not be implemented in the spa villages.The project responds to the problems identified (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.04.02-12-0226/17
    0 references