Implementation of the programme for the removal of products containing asbestos from the city of Cracow to 2032. (Q112570): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The implementation of the project is to be completed by 2020: products containing asbestos from construction works (roof coverings, façades or parts thereof) of asbestos waste from storage sites in real estate, in quantities of approximately 2240 Mg. The construction works catalogue are: residential buildings, buildings, industrial buildings, residential and economic buildings, others (e.g. altanks). Asbestos will be removed in the form of cor...)
(‎Created claim: summary (P836): The implementation of the project assumes removal by 2020: products containing asbestos from buildings (roof coverings, facades or parts thereof) of asbestos waste from their landfills in the amount of about 2240 Mg. The catalogue of construction works is: residential buildings, outbuildings, industrial buildings, residential and economic buildings, others (e.g. gazebos). Removal will include asbestos in the form of asbestos-cement corrugated an...)
Property / summary
 
The implementation of the project assumes removal by 2020: products containing asbestos from buildings (roof coverings, facades or parts thereof) of asbestos waste from their landfills in the amount of about 2240 Mg. The catalogue of construction works is: residential buildings, outbuildings, industrial buildings, residential and economic buildings, others (e.g. gazebos). Removal will include asbestos in the form of asbestos-cement corrugated and flat panels, spray insulation with asbestos-containing asbestos, asbestos sealants, pipes and connectors. The task will be performed by the Contractor selected by means of a public contract. It will be obliged to apply the requirements contained in the applicable legal regulations, in particular in the Regulation of the Minister of Labour and Social Policy of 2.04.2004 on ways and conditions for safe use and disposal of asbestos-containing products and in the Decree of the Minister of Economy and Labour of 14.10.2005 on health and safety rules for the protection and disposal of products containing asbestos and a programme of training on the safe use of such products, as well as a “promes” from the landfill of asbestos waste confirming the possibility of receiving asbestos waste. The project will remove a significant part of products containing asbestos inventory in the City of Krakow. The remainder of them should be removed by 2032, which is allowed to disperse. Minister of Economy of 13.12.2010 on requirements for the use of asbestos-containing products and the use and purification of installations or equipment in which asbestos-containing products have been or are used, which specifies that asbestos-containing installations or equipment shall be cleaned by removing or replacing asbestos-containing products with non-asbestos-free products by 31.12.2032. (English)
Property / summary: The implementation of the project assumes removal by 2020: products containing asbestos from buildings (roof coverings, facades or parts thereof) of asbestos waste from their landfills in the amount of about 2240 Mg. The catalogue of construction works is: residential buildings, outbuildings, industrial buildings, residential and economic buildings, others (e.g. gazebos). Removal will include asbestos in the form of asbestos-cement corrugated and flat panels, spray insulation with asbestos-containing asbestos, asbestos sealants, pipes and connectors. The task will be performed by the Contractor selected by means of a public contract. It will be obliged to apply the requirements contained in the applicable legal regulations, in particular in the Regulation of the Minister of Labour and Social Policy of 2.04.2004 on ways and conditions for safe use and disposal of asbestos-containing products and in the Decree of the Minister of Economy and Labour of 14.10.2005 on health and safety rules for the protection and disposal of products containing asbestos and a programme of training on the safe use of such products, as well as a “promes” from the landfill of asbestos waste confirming the possibility of receiving asbestos waste. The project will remove a significant part of products containing asbestos inventory in the City of Krakow. The remainder of them should be removed by 2032, which is allowed to disperse. Minister of Economy of 13.12.2010 on requirements for the use of asbestos-containing products and the use and purification of installations or equipment in which asbestos-containing products have been or are used, which specifies that asbestos-containing installations or equipment shall be cleaned by removing or replacing asbestos-containing products with non-asbestos-free products by 31.12.2032. (English) / rank
 
Normal rank
Property / summary: The implementation of the project assumes removal by 2020: products containing asbestos from buildings (roof coverings, facades or parts thereof) of asbestos waste from their landfills in the amount of about 2240 Mg. The catalogue of construction works is: residential buildings, outbuildings, industrial buildings, residential and economic buildings, others (e.g. gazebos). Removal will include asbestos in the form of asbestos-cement corrugated and flat panels, spray insulation with asbestos-containing asbestos, asbestos sealants, pipes and connectors. The task will be performed by the Contractor selected by means of a public contract. It will be obliged to apply the requirements contained in the applicable legal regulations, in particular in the Regulation of the Minister of Labour and Social Policy of 2.04.2004 on ways and conditions for safe use and disposal of asbestos-containing products and in the Decree of the Minister of Economy and Labour of 14.10.2005 on health and safety rules for the protection and disposal of products containing asbestos and a programme of training on the safe use of such products, as well as a “promes” from the landfill of asbestos waste confirming the possibility of receiving asbestos waste. The project will remove a significant part of products containing asbestos inventory in the City of Krakow. The remainder of them should be removed by 2032, which is allowed to disperse. Minister of Economy of 13.12.2010 on requirements for the use of asbestos-containing products and the use and purification of installations or equipment in which asbestos-containing products have been or are used, which specifies that asbestos-containing installations or equipment shall be cleaned by removing or replacing asbestos-containing products with non-asbestos-free products by 31.12.2032. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:06, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Implementation of the programme for the removal of products containing asbestos from the city of Cracow to 2032.
Project in Poland financed by DG Regio

    Statements

    0 references
    3,733,776.0 zloty
    0 references
    896,106.24 Euro
    13 January 2020
    0 references
    4,392,677.66 zloty
    0 references
    1,054,242.64 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 July 2017
    0 references
    31 December 2020
    0 references
    GMINA MIEJSKA KRAKÓW
    0 references
    0 references
    Realizacja projektu zakłada usunięcie do 2020r.: wyrobów zawierających azbest z obiektów budowlanych (pokryć dachowych, elewacji lub jej części) odpadów azbestowych z miejsc ich składowania na nieruchomościach, w ilości około 2240 Mg. Katalog obiektów budowlanych to: budynki mieszkalne, budynki gospodarcze, budynki przemysłowe, budynki mieszkalno-gospodarcze, inne (np. altanki). Usunięcie obejmie azbest w postaci płyt azbestowo-cementowych falistych i płaskich, izolacji natryskowej środkami zawierającymi w swoim składzie azbest, szczeliwa azbestowe, rury i złącza. Zadanie wykona Wykonawca wyłoniony w drodze zamówienia publicznego. Będzie on zobowiązany do stosowania wymagań zawartych w obowiązujących regulacjach prawnych w szczególności w rozporządzeniu Ministra Pracy i Polityki Społecznej z dnia 2.04.2004 r. w sprawie sposobów i warunków bezpiecznego użytkowania i usuwania wyrobów zawierających azbest oraz w rozporządzeniu Ministra Gospodarki i Pracy z dnia 14.10.2005 r. w sprawie zasad bezpieczeństwa i higieny pracy przy zabezpieczaniu i usuwaniu wyrobów zawierających azbest oraz programu szkolenia w zakresie bezpiecznego użytkowania takich wyrobów, a także posiadać „Promesę” od zarządzającego składowiskiem odpadów azbestowych potwierdzającą możliwość odbioru odpadów azbestowych. Projekt pozwoli na usunięcie znaczącej części wyrobów zawierających azbest zinwentaryzowanych na terenie Miasta Krakowa. Pozostała ich część powinna zostać usunięta do 2032 r. co jest dopuszczone rozp. Ministra Gospodarki z dnia 13.12.2010 r. w sprawie wymagań w zakresie wykorzystywania wyrobów zawierających azbest oraz wykorzystywania i oczyszczania instalacji lub urządzeń, w których były lub są wykorzystywane wyroby zawierające azbest, które określa, że instalacje lub urządzenia zawierające azbest oczyszcza się przez usunięcie wyrobów zawierających azbest lub ich wymianę na bezazbestowe w sposób niestwarzający zagrożenia dla środowiska i ludzi w terminie do 31.12.2032r. (Polish)
    0 references
    The implementation of the project assumes removal by 2020: products containing asbestos from buildings (roof coverings, facades or parts thereof) of asbestos waste from their landfills in the amount of about 2240 Mg. The catalogue of construction works is: residential buildings, outbuildings, industrial buildings, residential and economic buildings, others (e.g. gazebos). Removal will include asbestos in the form of asbestos-cement corrugated and flat panels, spray insulation with asbestos-containing asbestos, asbestos sealants, pipes and connectors. The task will be performed by the Contractor selected by means of a public contract. It will be obliged to apply the requirements contained in the applicable legal regulations, in particular in the Regulation of the Minister of Labour and Social Policy of 2.04.2004 on ways and conditions for safe use and disposal of asbestos-containing products and in the Decree of the Minister of Economy and Labour of 14.10.2005 on health and safety rules for the protection and disposal of products containing asbestos and a programme of training on the safe use of such products, as well as a “promes” from the landfill of asbestos waste confirming the possibility of receiving asbestos waste. The project will remove a significant part of products containing asbestos inventory in the City of Krakow. The remainder of them should be removed by 2032, which is allowed to disperse. Minister of Economy of 13.12.2010 on requirements for the use of asbestos-containing products and the use and purification of installations or equipment in which asbestos-containing products have been or are used, which specifies that asbestos-containing installations or equipment shall be cleaned by removing or replacing asbestos-containing products with non-asbestos-free products by 31.12.2032. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.05.02.01-12-0066/17
    0 references