Construction of a system of cycle paths and footpaths over a district road from Aleksandrowc to the junction with the regional road in Balice on the A4 motorway in the municipality of Zabierzów (Q112519): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims to implement the projects and complete the following works on the basis of the project, the following works being carried out within the district road around the length of the district. 2 780 m, i.e. from about km 2550 in m. Balice up to approx. 5 320 m. 157 m² construction of the cycle path over the length approx. 945 m³.roll of softones over a length ca. 2776 m4.construction and upgrading of street lighting. 2530 m5.drainage...) |
(Created claim: summary (P836): The object of the project is to carry out projects on the basis of them complete assortment of the necessary assortment, the following construction works within the district road for approx. 2780 m, i.e. from approx. 2550 in Balice to approx. km 5320 in Aleksandrowice according to the adopted work hectometer used to describe the sections of the road to the application for an environmental decision.In this section the roads will be designed and c...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is to carry out projects on the basis of them complete assortment of the necessary assortment, the following construction works within the district road for approx. 2780 m, i.e. from approx. 2550 in Balice to approx. km 5320 in Aleksandrowice according to the adopted work hectometer used to describe the sections of the road to the application for an environmental decision.In this section the roads will be designed and constructed, cycle paths, walking cycles, modernisation of drainage works in connection with the construction of the above-mentioned bicycle infrastructure elements including rain drainage if necessary, modernisation of periphery lengths and all associated works. 157 m². construction of the bike path approx. 945 m³. construction of a footbike along the length of approx. 2776 m4.construction and modernisation of street lighting approx. 2530 m5.modernisation of dehydration in connection with the construction of bicycle infrastructure, including the construction of rainwater drainage over a length of approx. 825 m6.Extension of culverts under the district road, forced by the construction of bicycle infrastructure, pc. 27.construction of crossings through cycle and footways at the site of existing exits8.decommissioning fences, gates and gates9.cut of colliding greenery high-growthParaments of designed element aswidth of one-way cycle path:1.70 MBS speed of walking distance with one-way cycle traffic:2,50 min. (English) | |||||||||||||||
Property / summary: The object of the project is to carry out projects on the basis of them complete assortment of the necessary assortment, the following construction works within the district road for approx. 2780 m, i.e. from approx. 2550 in Balice to approx. km 5320 in Aleksandrowice according to the adopted work hectometer used to describe the sections of the road to the application for an environmental decision.In this section the roads will be designed and constructed, cycle paths, walking cycles, modernisation of drainage works in connection with the construction of the above-mentioned bicycle infrastructure elements including rain drainage if necessary, modernisation of periphery lengths and all associated works. 157 m². construction of the bike path approx. 945 m³. construction of a footbike along the length of approx. 2776 m4.construction and modernisation of street lighting approx. 2530 m5.modernisation of dehydration in connection with the construction of bicycle infrastructure, including the construction of rainwater drainage over a length of approx. 825 m6.Extension of culverts under the district road, forced by the construction of bicycle infrastructure, pc. 27.construction of crossings through cycle and footways at the site of existing exits8.decommissioning fences, gates and gates9.cut of colliding greenery high-growthParaments of designed element aswidth of one-way cycle path:1.70 MBS speed of walking distance with one-way cycle traffic:2,50 min. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is to carry out projects on the basis of them complete assortment of the necessary assortment, the following construction works within the district road for approx. 2780 m, i.e. from approx. 2550 in Balice to approx. km 5320 in Aleksandrowice according to the adopted work hectometer used to describe the sections of the road to the application for an environmental decision.In this section the roads will be designed and constructed, cycle paths, walking cycles, modernisation of drainage works in connection with the construction of the above-mentioned bicycle infrastructure elements including rain drainage if necessary, modernisation of periphery lengths and all associated works. 157 m². construction of the bike path approx. 945 m³. construction of a footbike along the length of approx. 2776 m4.construction and modernisation of street lighting approx. 2530 m5.modernisation of dehydration in connection with the construction of bicycle infrastructure, including the construction of rainwater drainage over a length of approx. 825 m6.Extension of culverts under the district road, forced by the construction of bicycle infrastructure, pc. 27.construction of crossings through cycle and footways at the site of existing exits8.decommissioning fences, gates and gates9.cut of colliding greenery high-growthParaments of designed element aswidth of one-way cycle path:1.70 MBS speed of walking distance with one-way cycle traffic:2,50 min. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 12:04, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a system of cycle paths and footpaths over a district road from Aleksandrowc to the junction with the regional road in Balice on the A4 motorway in the municipality of Zabierzów |
Project in Poland financed by DG Regio |
Statements
3,268,496.0 zloty
0 references
3,845,290.01 zloty
0 references
85.0 percent
0 references
29 May 2017
0 references
31 December 2020
0 references
GMINA ZABIERZÓW
0 references
Przedmiotem projektu jest wykonanie projektów i zrealizowanie na ich podstawie kompletnych co do niezbędnego asortymentu, niżej wymienionych robót budowlanych w ciągu drogi powiatowej na długości ok. 2780 m tj. od ok km 2550 w m. Balice do ok km 5320 w m. Aleksandrowice według przyjętego hektometrażu roboczego zastosowanego dla opisania odcinków drogi do wniosku o wydanie decyzji środowiskowej.W tym odcinku drogi zostaną zaprojektowane i wykone, ścieżki rowerowe, ciągi pieszorowerowe, modernizacja odwodnienia w związku z budową ww. elementów infrastruktury rowerowej w tym kanalizacja opadową jeśli będzie konieczna, modernizacja oświetlenia ulicznego oraz wszelkie roboty towarzyszące.Szacunkowe ilości robót:1.budowa chodników, peronów na przystankach na długości ok. 157m2.budowa ścieżki rowerowej na długości ok. 945 m3.budowa ciąg pieszorowerowego na długości ok. 2776 m4.budowa i modernizacja oświetlenia ulicznego na długości ok. 2530 m5.modernizacja odwodnienia w związku z budową infrastruktury rowerowej, w tym budowa kanalizacji deszczowej na długości ok. 825 m6.przedłużenie przepustów pod drogą powiatową, wymuszone budową infrastruktury rowerowej szt. 27.budowa przejazdów przez ciągi rowerowe i pieszorowerowe w miejscu istniejących zjazdów8.rozbiórka kolidujących ogrodzeń, bram i furtek9.wycinka kolidującej zieleni wysokiejParamenty projektowanych elementówaszerokość jednokierunkowej ścieżki rowerowej:1,70 mbszerokość ciągu pieszorowerowego z jednokierunkowym ruchem rowerowym :2,50 mcszerokość ciągu pieszorowerowego z dwukierunkowym ruchem rowerowym :3,50 mdszerokość chodników przy jezdni:2,0 meszerokość peronów przystankowych:1,5 mfszerokość zjazdów indywidualnych:zgodnie ze stanem istniejącym, min. 3,0 mgszerokość zjazdów publicznych:zgodnie ze stanem istniejącym, min. 3,5 m (Polish)
0 references
The object of the project is to carry out projects on the basis of them complete assortment of the necessary assortment, the following construction works within the district road for approx. 2780 m, i.e. from approx. 2550 in Balice to approx. km 5320 in Aleksandrowice according to the adopted work hectometer used to describe the sections of the road to the application for an environmental decision.In this section the roads will be designed and constructed, cycle paths, walking cycles, modernisation of drainage works in connection with the construction of the above-mentioned bicycle infrastructure elements including rain drainage if necessary, modernisation of periphery lengths and all associated works. 157 m². construction of the bike path approx. 945 m³. construction of a footbike along the length of approx. 2776 m4.construction and modernisation of street lighting approx. 2530 m5.modernisation of dehydration in connection with the construction of bicycle infrastructure, including the construction of rainwater drainage over a length of approx. 825 m6.Extension of culverts under the district road, forced by the construction of bicycle infrastructure, pc. 27.construction of crossings through cycle and footways at the site of existing exits8.decommissioning fences, gates and gates9.cut of colliding greenery high-growthParaments of designed element aswidth of one-way cycle path:1.70 MBS speed of walking distance with one-way cycle traffic:2,50 min. (English)
20 October 2020
0 references
Identifiers
RPMP.04.05.01-12-0964/17
0 references