Reduce the low emissions in the municipality of Muszyna by exchange of sources of heat in individual households for heat sources using solid fuels (Q112477): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project relates to the implementation of measures for the replacement of old boilers on ecoplant boilers, which meet certain parameters, with subsidies for the preparation of certain installations. The project will finance actions related to the dismantling of the old heat source, i.e. decommissioning, and at the same time the purchase and installation of a new heat source. It is also envisaged to fund small work related to the replacement...)
(‎Created claim: summary (P836): The subject of the project is the implementation of activities with the exchange of old boilers for ecogrown boilers fulfilling certain parameters together with the co-financing of works related to the need to prepare specific installations. The project will co-finance activities related to the dismantling of the old heat source, i.e. its decommissioning and simultaneously related to the purchase and assembly of a new heat source. It is also env...)
Property / summary
 
The subject of the project is the implementation of activities with the exchange of old boilers for ecogrown boilers fulfilling certain parameters together with the co-financing of works related to the need to prepare specific installations. The project will co-finance activities related to the dismantling of the old heat source, i.e. its decommissioning and simultaneously related to the purchase and assembly of a new heat source. It is also envisaged to finance small works related to the replacement and purchase of fittings, fittings, among others: radiators, chimney inserts. It should be stressed that the detailed scope necessary to carry out the work will result from the energy assessment of each building covered by the project. As part of the support provided in the project, it will also be possible to build an internal central heating and hot water installation. The catalogue of eligible expenditure also includes project doc. It is assumed that 102 boilers and installations will be replaced. The scope of the project will be implemented through the implementation of the following activities:1. Preparation of financial and economic analysis.2. Replacement of boilers of furnaces, heating appliances for solid fuels using solid fuels and adapting the installation to the needs of the new appliance3. Raising public awareness4. Management and promotion of the project flat-rate costsThe heat source parameters, i.e. solid fuel heating devices, will be determined on the basis of the energy assessment of the building. All expenses incurred in the project will represent the optimal quality-to-price ratio. The solutions used in the draft will comply with the minimum level of energy efficiency and emission standards applicable from the end of 2020, as set out in the implementing measures of Directive 2009125EC of 21.10.2009 laying down the general principles for setting ecodesign requirements for energy-related products. (English)
Property / summary: The subject of the project is the implementation of activities with the exchange of old boilers for ecogrown boilers fulfilling certain parameters together with the co-financing of works related to the need to prepare specific installations. The project will co-finance activities related to the dismantling of the old heat source, i.e. its decommissioning and simultaneously related to the purchase and assembly of a new heat source. It is also envisaged to finance small works related to the replacement and purchase of fittings, fittings, among others: radiators, chimney inserts. It should be stressed that the detailed scope necessary to carry out the work will result from the energy assessment of each building covered by the project. As part of the support provided in the project, it will also be possible to build an internal central heating and hot water installation. The catalogue of eligible expenditure also includes project doc. It is assumed that 102 boilers and installations will be replaced. The scope of the project will be implemented through the implementation of the following activities:1. Preparation of financial and economic analysis.2. Replacement of boilers of furnaces, heating appliances for solid fuels using solid fuels and adapting the installation to the needs of the new appliance3. Raising public awareness4. Management and promotion of the project flat-rate costsThe heat source parameters, i.e. solid fuel heating devices, will be determined on the basis of the energy assessment of the building. All expenses incurred in the project will represent the optimal quality-to-price ratio. The solutions used in the draft will comply with the minimum level of energy efficiency and emission standards applicable from the end of 2020, as set out in the implementing measures of Directive 2009125EC of 21.10.2009 laying down the general principles for setting ecodesign requirements for energy-related products. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the implementation of activities with the exchange of old boilers for ecogrown boilers fulfilling certain parameters together with the co-financing of works related to the need to prepare specific installations. The project will co-finance activities related to the dismantling of the old heat source, i.e. its decommissioning and simultaneously related to the purchase and assembly of a new heat source. It is also envisaged to finance small works related to the replacement and purchase of fittings, fittings, among others: radiators, chimney inserts. It should be stressed that the detailed scope necessary to carry out the work will result from the energy assessment of each building covered by the project. As part of the support provided in the project, it will also be possible to build an internal central heating and hot water installation. The catalogue of eligible expenditure also includes project doc. It is assumed that 102 boilers and installations will be replaced. The scope of the project will be implemented through the implementation of the following activities:1. Preparation of financial and economic analysis.2. Replacement of boilers of furnaces, heating appliances for solid fuels using solid fuels and adapting the installation to the needs of the new appliance3. Raising public awareness4. Management and promotion of the project flat-rate costsThe heat source parameters, i.e. solid fuel heating devices, will be determined on the basis of the energy assessment of the building. All expenses incurred in the project will represent the optimal quality-to-price ratio. The solutions used in the draft will comply with the minimum level of energy efficiency and emission standards applicable from the end of 2020, as set out in the implementing measures of Directive 2009125EC of 21.10.2009 laying down the general principles for setting ecodesign requirements for energy-related products. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:03, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reduce the low emissions in the municipality of Muszyna by exchange of sources of heat in individual households for heat sources using solid fuels
Project in Poland financed by DG Regio

    Statements

    0 references
    839,997.18 zloty
    0 references
    201,599.32 Euro
    13 January 2020
    0 references
    854,187.76 zloty
    0 references
    205,005.06 Euro
    13 January 2020
    0 references
    98.34 percent
    0 references
    1 February 2017
    0 references
    31 December 2019
    0 references
    MIASTO I GMINA UZDROWISKOWA MUSZYNA
    0 references
    0 references
    Przedmiotem projektu jest realizacja działań zw. z wymianą starych kotłów na kotły na ekogroszek spełniające określone parametry wraz z dofinansowaniem prac związanych z koniecznością przygotowania określonych instalacji. W ramach projektu dofinansowane będą działania związane z demontażem starego źródła ciepła, tj. jego likwidacją oraz jednocześnie związane z zakupem i montażem nowego źródła ciepła. Przewiduje się również dofinansowanie drobnych prac związanych z wymianą i zakupem armatury, osprzętu m.in.: grzejniki, wkłady kominowe. Podkreślić należy, że szczegółowy zakres niezbędnych do przeprowadzenia prac będzie wynikał z przeprowadzonej oceny energetycznej każdego budynku objętego projektem. W ramach wsparcia udzielonego w projekcie, możliwe będzie również wykonanie wewnętrznej instalacji centralnego ogrzewania i ciepłej wody użytkowej. W ramach katalogu wydatków kwalifikowanych mieści się również dok. projektowa. Zakłada się, że wymianie podlegać będzie 102 kotłów oraz instalacji. Zakres projektu zostanie zrealizowany poprzez wykonanie następujących działań:1. Opracowanie analizy finansowej i ekonomicznej.2. Wymiana kotłów pieców, urządzeń grzewczych na paliwa stałe na źródła ciepła wykorzystujące paliwa stałe z dostosowaniem instalacji do potrzeb nowego urządzenia3. Podniesienie świadomości ekologicznej społeczeństwa4. Zarządzanie i promocja projektu koszty ryczałtoweParametry źródeł ciepła, tj. urządzeń grzewczych na paliwa stałe, zostaną określone na podstawie przeprowadzonej oceny energetycznej budynku. Wszystkie wydatki ponoszone w projekcie przedstawiały będą optymalną relacje jakości do ceny. Zastosowane w projekcie rozwiązania spełniać będą obowiązujący od końca 2020 warunek minimalnego poziomu efektywności energetycznej i normy emisji zanieczyszczeń, określone w środkach wykonawczych do dyrektywy 2009125WE z 21.10.2009 ustanawiającej ogólne zasady ustalania wymogów dotyczących ekoprojektu dla produktów związanych z energią. (Polish)
    0 references
    The subject of the project is the implementation of activities with the exchange of old boilers for ecogrown boilers fulfilling certain parameters together with the co-financing of works related to the need to prepare specific installations. The project will co-finance activities related to the dismantling of the old heat source, i.e. its decommissioning and simultaneously related to the purchase and assembly of a new heat source. It is also envisaged to finance small works related to the replacement and purchase of fittings, fittings, among others: radiators, chimney inserts. It should be stressed that the detailed scope necessary to carry out the work will result from the energy assessment of each building covered by the project. As part of the support provided in the project, it will also be possible to build an internal central heating and hot water installation. The catalogue of eligible expenditure also includes project doc. It is assumed that 102 boilers and installations will be replaced. The scope of the project will be implemented through the implementation of the following activities:1. Preparation of financial and economic analysis.2. Replacement of boilers of furnaces, heating appliances for solid fuels using solid fuels and adapting the installation to the needs of the new appliance3. Raising public awareness4. Management and promotion of the project flat-rate costsThe heat source parameters, i.e. solid fuel heating devices, will be determined on the basis of the energy assessment of the building. All expenses incurred in the project will represent the optimal quality-to-price ratio. The solutions used in the draft will comply with the minimum level of energy efficiency and emission standards applicable from the end of 2020, as set out in the implementing measures of Directive 2009125EC of 21.10.2009 laying down the general principles for setting ecodesign requirements for energy-related products. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.04.03-12-0253/17
    0 references