Development of the district road linking the municipality of Świątniki Górne to the TEN-T network — stage II (Q112999): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The design of the road transport sector is a reconstruction of the district road of class Z. it is designed to design a road of approximately 4 843 m long. The beginning of the conversion is situated near the border of the districts of the Kraków District of Świątniki Górne and the city of Kraków with districts in the area of parcels 32 and 122. The end of the planned road is located at the roundabout at the roundabout at the intersection of t...) |
(Created claim: summary (P836): The subject of the project of the road industry is the reconstruction of the Z-class district road. It is planned to design a reconstruction of the road with a length of about 4843 m. The beginning of the reconstruction is located near the border of the districts of Krakow Świętoniki Górne and the city of Kraków on the district rights in the vicinity of plots 32 and 122. The end of the projected road is located on the border of the roundabout, w...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project of the road industry is the reconstruction of the Z-class district road. It is planned to design a reconstruction of the road with a length of about 4843 m. The beginning of the reconstruction is located near the border of the districts of Krakow Świętoniki Górne and the city of Kraków on the district rights in the vicinity of plots 32 and 122. The end of the projected road is located on the border of the roundabout, which is the intersection of the 2239K district corner with the district road 1992K in Świątniki Górnych plot 109 Shrines Upper town within the Temple of Upper. The section from the roundabout in Światniki to the border with Mogilany Municipality will be renovated from the municipality’s own resources the section not covered by the project by length. 746.82 m so that continuity is maintained in connection with the TENT network. In the vicinity of the road there are single-family buildings and construction works. There are also agricultural areas. The area’s armaments are within the range of the investment: underground and overground power grid, water supply network, teletechnical network, gas network, rainwater and sanitation drainage. (English) | |||||||||||||||
Property / summary: The subject of the project of the road industry is the reconstruction of the Z-class district road. It is planned to design a reconstruction of the road with a length of about 4843 m. The beginning of the reconstruction is located near the border of the districts of Krakow Świętoniki Górne and the city of Kraków on the district rights in the vicinity of plots 32 and 122. The end of the projected road is located on the border of the roundabout, which is the intersection of the 2239K district corner with the district road 1992K in Świątniki Górnych plot 109 Shrines Upper town within the Temple of Upper. The section from the roundabout in Światniki to the border with Mogilany Municipality will be renovated from the municipality’s own resources the section not covered by the project by length. 746.82 m so that continuity is maintained in connection with the TENT network. In the vicinity of the road there are single-family buildings and construction works. There are also agricultural areas. The area’s armaments are within the range of the investment: underground and overground power grid, water supply network, teletechnical network, gas network, rainwater and sanitation drainage. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project of the road industry is the reconstruction of the Z-class district road. It is planned to design a reconstruction of the road with a length of about 4843 m. The beginning of the reconstruction is located near the border of the districts of Krakow Świętoniki Górne and the city of Kraków on the district rights in the vicinity of plots 32 and 122. The end of the projected road is located on the border of the roundabout, which is the intersection of the 2239K district corner with the district road 1992K in Świątniki Górnych plot 109 Shrines Upper town within the Temple of Upper. The section from the roundabout in Światniki to the border with Mogilany Municipality will be renovated from the municipality’s own resources the section not covered by the project by length. 746.82 m so that continuity is maintained in connection with the TENT network. In the vicinity of the road there are single-family buildings and construction works. There are also agricultural areas. The area’s armaments are within the range of the investment: underground and overground power grid, water supply network, teletechnical network, gas network, rainwater and sanitation drainage. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 11:54, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of the district road linking the municipality of Świątniki Górne to the TEN-T network — stage II |
Project in Poland financed by DG Regio |
Statements
2,778,531.25 zloty
0 references
5,774,171.37 zloty
0 references
48.12 percent
0 references
1 June 2017
0 references
30 November 2018
0 references
GMINA ŚWIĄTNIKI GÓRNE
0 references
Przedmiotem opracowania projektu branży drogowej jest przebudowa drogi powiatowej klasy Z. Zakłada się zaprojektowanie przebudowy drogi o długości około 4843m. Początek przebudowy znajduje się w okolicy granicy powiatów krakowskiego Gminy Świątniki Górne i miasta Kraków na prawach powiatu w okolicach działek 32 oraz 122. Koniec projektowanej drogi znajduje się na granicy ronda stanowiącego skrzyżowanie rogi powiatowej 2239K z drogą powiatową 1992K w Świątnikach Górnych działka 109 Świątniki Górne miasto w obrębie Świątniki Górne. Odcinek od ronda w Światnikach do granicy z Gmina Mogilany będzie wyremontowany z ze środków własnych gminy odcinek nie objęty projektem o dł. 746,82 m tak, aby zachowana została ciągłość w połączeniu z siecią TENT. W otoczeniu drogi występuje zabudowa jednorodzinna oraz obiekty budowlane. Występują również tereny rolnicze. W zasięgu inwestycji występuje następujące uzbrojenie terenu: sieć energetyczna podziemna oraz nadziemna, sieć wodociągowa, sieć teletechniczna, sieć gazowa, kanalizacja deszczowa i sanitarna. (Polish)
0 references
The subject of the project of the road industry is the reconstruction of the Z-class district road. It is planned to design a reconstruction of the road with a length of about 4843 m. The beginning of the reconstruction is located near the border of the districts of Krakow Świętoniki Górne and the city of Kraków on the district rights in the vicinity of plots 32 and 122. The end of the projected road is located on the border of the roundabout, which is the intersection of the 2239K district corner with the district road 1992K in Świątniki Górnych plot 109 Shrines Upper town within the Temple of Upper. The section from the roundabout in Światniki to the border with Mogilany Municipality will be renovated from the municipality’s own resources the section not covered by the project by length. 746.82 m so that continuity is maintained in connection with the TENT network. In the vicinity of the road there are single-family buildings and construction works. There are also agricultural areas. The area’s armaments are within the range of the investment: underground and overground power grid, water supply network, teletechnical network, gas network, rainwater and sanitation drainage. (English)
20 October 2020
0 references
Identifiers
RPMP.07.01.02-12-0958/17
0 references