Comprehensive development of school and pre-school facilities in the municipality of Biech, including compliance with education reform requirements — in Strzelzyn (Q114473): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The extension of the school building will be a part of the floor segment in part with a commercial terrace over the whole. on the ground floor there will be two rooms for the two pre-school sites connected to the existing part of the building where the nursery facilities have been designed. Part of the podpiwek will be located for the boiler room. access to the terrace will provide an external staircase of the bay. Access to the newly construc...)
(‎Created claim: summary (P836): Extension of the school building.The new part of the building will be a ground floor part of the building with a utility terrace above the whole.On the ground floor there will be two rooms for two kindergarten departments connected with the existing part of the building where the facilities of the kindergarten were designed. In the cellar part there will be a fuel warehouse for the boiler room of the building.Access to the terrace will be provid...)
Property / summary
 
Extension of the school building.The new part of the building will be a ground floor part of the building with a utility terrace above the whole.On the ground floor there will be two rooms for two kindergarten departments connected with the existing part of the building where the facilities of the kindergarten were designed. In the cellar part there will be a fuel warehouse for the boiler room of the building.Access to the terrace will be provided by external openwork staircases. Access to newly designed rooms will be ensured by entering the existing school building.Additional exits will be located on the south side through a designed ramp for disabled people.Reconstruction of existing premises.The following works will be carried out as part of the reconstruction of the existing part: cellars: conversion of storage space into a toilet for kitchen workers, reconstruction, floor: reconstruction of the existing kitchen with facilities, conversion of the present dining room into a classroom, conversion of two classrooms for the needs of the new dining room and partly kitchen facilities, the ground floor of the apartment will include the reconstruction of the entire premises for the needs of the facilities for kindergarten wards where: entrance area with locker rooms, children’s toilets available from rooms, kitchen facilities in the form of a dining room and dishwashing facilities, demolition and liquidation works will include: superstructure over the current fuel composition partition walls, sanitary facilities in liquidated floors finishes, internal and external doors, holes in the walls, piercing through walls for installation. (English)
Property / summary: Extension of the school building.The new part of the building will be a ground floor part of the building with a utility terrace above the whole.On the ground floor there will be two rooms for two kindergarten departments connected with the existing part of the building where the facilities of the kindergarten were designed. In the cellar part there will be a fuel warehouse for the boiler room of the building.Access to the terrace will be provided by external openwork staircases. Access to newly designed rooms will be ensured by entering the existing school building.Additional exits will be located on the south side through a designed ramp for disabled people.Reconstruction of existing premises.The following works will be carried out as part of the reconstruction of the existing part: cellars: conversion of storage space into a toilet for kitchen workers, reconstruction, floor: reconstruction of the existing kitchen with facilities, conversion of the present dining room into a classroom, conversion of two classrooms for the needs of the new dining room and partly kitchen facilities, the ground floor of the apartment will include the reconstruction of the entire premises for the needs of the facilities for kindergarten wards where: entrance area with locker rooms, children’s toilets available from rooms, kitchen facilities in the form of a dining room and dishwashing facilities, demolition and liquidation works will include: superstructure over the current fuel composition partition walls, sanitary facilities in liquidated floors finishes, internal and external doors, holes in the walls, piercing through walls for installation. (English) / rank
 
Normal rank
Property / summary: Extension of the school building.The new part of the building will be a ground floor part of the building with a utility terrace above the whole.On the ground floor there will be two rooms for two kindergarten departments connected with the existing part of the building where the facilities of the kindergarten were designed. In the cellar part there will be a fuel warehouse for the boiler room of the building.Access to the terrace will be provided by external openwork staircases. Access to newly designed rooms will be ensured by entering the existing school building.Additional exits will be located on the south side through a designed ramp for disabled people.Reconstruction of existing premises.The following works will be carried out as part of the reconstruction of the existing part: cellars: conversion of storage space into a toilet for kitchen workers, reconstruction, floor: reconstruction of the existing kitchen with facilities, conversion of the present dining room into a classroom, conversion of two classrooms for the needs of the new dining room and partly kitchen facilities, the ground floor of the apartment will include the reconstruction of the entire premises for the needs of the facilities for kindergarten wards where: entrance area with locker rooms, children’s toilets available from rooms, kitchen facilities in the form of a dining room and dishwashing facilities, demolition and liquidation works will include: superstructure over the current fuel composition partition walls, sanitary facilities in liquidated floors finishes, internal and external doors, holes in the walls, piercing through walls for installation. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:41, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive development of school and pre-school facilities in the municipality of Biech, including compliance with education reform requirements — in Strzelzyn
Project in Poland financed by DG Regio

    Statements

    0 references
    1,158,084.49 zloty
    0 references
    277,940.28 Euro
    13 January 2020
    0 references
    1,781,746.82 zloty
    0 references
    427,619.24 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    31 August 2018
    0 references
    31 December 2020
    0 references
    GMINA BIECZ
    0 references
    0 references
    Rozbudowa budynku szkoły.Nowa część budynku będzie segmentem parterowym częściowo podpiwniczonym z tarasem użytkowym nad całością.Na parterze znajdą się dwie sale dla dwóch oddziałów przedszkolnych połączone z istniejącą częścią budynku gdzie zaprojektowano zaplecze przedszkola. W części podpiwniczonej zlokalizowany zostanie skład opału dla kotłowni budynku.Dostęp na taras zapewnią zewnętrzne schody ażurowe. Dostęp do nowo projektowanych pomieszczeń będzie zapewniony poprzez wejście do istniejącego budynku szkoły.Dodatkowe wyjścia ewakuacyjne zostaną zlokalizowane od strony południowej poprzez projektowaną pochylnię dla osób niepełnosprawnych.Przebudowa istniejących pomieszczeń.W ramach przebudowy części istniejącej zostaną przeprowadzone następujące prace:piwnice: przebudowa pomieszczenia magazynowego na toaletę dla pracowników kuchni, przebudowa,parter: przebudowa istniejącej kuchni z zapleczem, przebudowa obecnej jadalni na sale lekcyjną, przebudowa dwóch sal lekcyjnych na potrzeby nowej jadalni i częściowo zaplecza kuchennego, parter mieszkania obejmie przebudowa całości pomieszczeń na potrzeby zaplecza dla oddziałów przedszkolnych gdzie zorganizowane będą: strefa wejściowa z szatniami, toalety dla dzieci dostępne z sal, zaplecze kuchenne w postaci rozdzielni posiłków i zmywalni naczyń, Prace rozbiórkowe i likwidacyjne obejmą: nadbudowa nad obecnym składem opału ścianki działowe, urządzenia sanitarne w likwidowanych pomieszczeniach wykończenia podłóg, drzwi wewnętrzne oraz zewnętrzne, przebicia otworów w ścianach, wykonanie przebić przez ściany dla przeprowadzenia instalacji. (Polish)
    0 references
    Extension of the school building.The new part of the building will be a ground floor part of the building with a utility terrace above the whole.On the ground floor there will be two rooms for two kindergarten departments connected with the existing part of the building where the facilities of the kindergarten were designed. In the cellar part there will be a fuel warehouse for the boiler room of the building.Access to the terrace will be provided by external openwork staircases. Access to newly designed rooms will be ensured by entering the existing school building.Additional exits will be located on the south side through a designed ramp for disabled people.Reconstruction of existing premises.The following works will be carried out as part of the reconstruction of the existing part: cellars: conversion of storage space into a toilet for kitchen workers, reconstruction, floor: reconstruction of the existing kitchen with facilities, conversion of the present dining room into a classroom, conversion of two classrooms for the needs of the new dining room and partly kitchen facilities, the ground floor of the apartment will include the reconstruction of the entire premises for the needs of the facilities for kindergarten wards where: entrance area with locker rooms, children’s toilets available from rooms, kitchen facilities in the form of a dining room and dishwashing facilities, demolition and liquidation works will include: superstructure over the current fuel composition partition walls, sanitary facilities in liquidated floors finishes, internal and external doors, holes in the walls, piercing through walls for installation. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.11.02.00-12-0845/17
    0 references