Reconstruction and extension of the basic school building in Barciice and the technical infrastructure (Q114461): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): This project involves an extension of the Primary School in Barcice by 4 classrooms, together with social matches, and two classrooms on the floor. In order to ensure that persons with disabilities are accessible to all levels of the school, a person who is located at the main entrance to the building shall be designed for all levels of school. In the part of the existing conversion rooms, the classrooms designs for chemical, physical and plas...)
Property / summary
This project involves an extension of the Primary School in Barcice by 4 classrooms, together with social matches, and two classrooms on the floor. In order to ensure that persons with disabilities are accessible to all levels of the school, a person who is located at the main entrance to the building shall be designed for all levels of school. In the part of the existing conversion rooms, the classrooms designs for chemical, physical and plastic workers. In addition, the entire facility will be brought into line with existing legislation. (English)
 
Property / summary: This project involves an extension of the Primary School in Barcice by 4 classrooms, together with social matches, and two classrooms on the floor. In order to ensure that persons with disabilities are accessible to all levels of the school, a person who is located at the main entrance to the building shall be designed for all levels of school. In the part of the existing conversion rooms, the classrooms designs for chemical, physical and plastic workers. In addition, the entire facility will be brought into line with existing legislation. (English) / rank
Normal rank
 

Revision as of 11:40, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction and extension of the basic school building in Barciice and the technical infrastructure
Project in Poland financed by DG Regio

    Statements

    0 references
    1,834,609.52 zloty
    0 references
    440,306.28 Euro
    13 January 2020
    0 references
    2,822,600.34 zloty
    0 references
    677,424.08 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 July 2017
    0 references
    30 June 2020
    0 references
    GMINA STARY SĄCZ
    0 references
    Niniejszy projekt obejmuje rozbudowę Szkoły Podstawowej w Barcicach o 4 sale lekcyjne wraz z zapleczami socjalnymi, po dwie sale lekcyjne na kondygnacji. Aby zapewnić dostępność osobom niepełnosprawnym na wszystkie poziomy szkoły projektuje się dźwig osobowy usytuowany przy głównym wejściu do budynku. W części istniejącej przebudowywane sale lekcyjne projektuje na potrzeby pracowni chemicznej, fizycznej i plastycznej. Dodatkowo nastąpi dostosowanie całego obiektu do obowiązujących przepisów PPOŻ.Zestawienie powierzchni rozbudowywanej CZĘŚCI DYDAKTYCZNEJ:POWIERZCHNIA UŻYTKOWA 688,01 m2KUBATURA 3225,60m3POWIERZCHNIA ZABUDOWY 289,00mWYSOKOŚ BUDYNKU wg warunków technicznych 11,20mWYSOKOŚ BUDYNKU wg planu miejscowego 14,97mZestawienie powierzchni rozbudowywanej części WINDY:POWIERZCHNIA UŻYTKOWA 27,99 m2KUBATURA 77,25m3POWIERZCHNIA ZABUDOWY 5,00mWYSOKOŚ BUDYNKU wg warunków technicznych 11,30mWYSOKOŚ BUDYNKU wg planu miejscowego 13,75m (Polish)
    0 references

    Identifiers

    RPMP.11.02.00-12-0798/17
    0 references