Thermal modernisation of the teaching facilities of Tarnowski District in Tuchów and Zakryczyn (Q112229): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of three tasks, each covering one of the three sites: Target 1. Joint grammar school in Tuchów (skr. ). The investment will comprise one building: school building (construction No 1). Target 2. Vocational and vocational training Centre in Tuchów (skr. CKZU Tuchów). The investment will comprise four buildings — school (construction No 2), school workshops (construction No 3), school workshops — car and teaching workshops (b...) |
(Created claim: summary (P836): The project consists of three tasks, each involving one of three objects: Task 1. General Education High School in Tuchów (Skr. Lo Tuchów). The investment will cover one building: the school building (built no. 1). Task 2. Centre for Vocational and Continuing Education in Tuchów (Skr. “CKZiU Tuchów”. The investment will include four buildings – school (building no. 2), school workshops (building no. 3), school workshops – car and didactic worksh...) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of three tasks, each involving one of three objects: Task 1. General Education High School in Tuchów (Skr. Lo Tuchów). The investment will cover one building: the school building (built no. 1). Task 2. Centre for Vocational and Continuing Education in Tuchów (Skr. “CKZiU Tuchów”. The investment will include four buildings – school (building no. 2), school workshops (building no. 3), school workshops – car and didactic workshops (building no. 4), school workshops – welding room and forge (building no. 5). Task 3. Secondary Schools in Zakliczin (Skr. ZSP Zakliczyn). The investment will cover two buildings: workshops (building no. 6) and workshops – workshop number 2 (construction no. 7) The total number of buildings covered by the project in the above mentioned facilities is 7. In the physical and financial schedule, individual actions are assigned to the objects broken down by category of work according to the list below, with each building marking the work concerned: — preparatory work: technical documentation, audits, – warming, – carpentry, – central heating installations, boiler room, – lighting, – production of photovoltaic installation, – investor supervision. A measure of achievement of the objectives will be: a) reduction of the annual final energy demand by 74,45 %, (b) the use of mandatory heat accounting equipment: the project designs heat meters for individual heat cycles (c.o. and cwu) in a heat node (attached – "oil. 16 c: Boiler room, what Thermo Tukhov, Disorder") c) use of equipment that maintains the specified temperature: the project uses weather regulators, thermostatic valves on radiators and control valves, for static regulation – dynamic availability pressure control function performed by electronically controlled pumps. d) reduction of greenhouse gas emissions (CO2) by 76.735 %, e) reduction of PM2.5 dust emissions by 99.52 % and PM10 dusts by 99.57 %. (English) | |||||||||||||||
Property / summary: The project consists of three tasks, each involving one of three objects: Task 1. General Education High School in Tuchów (Skr. Lo Tuchów). The investment will cover one building: the school building (built no. 1). Task 2. Centre for Vocational and Continuing Education in Tuchów (Skr. “CKZiU Tuchów”. The investment will include four buildings – school (building no. 2), school workshops (building no. 3), school workshops – car and didactic workshops (building no. 4), school workshops – welding room and forge (building no. 5). Task 3. Secondary Schools in Zakliczin (Skr. ZSP Zakliczyn). The investment will cover two buildings: workshops (building no. 6) and workshops – workshop number 2 (construction no. 7) The total number of buildings covered by the project in the above mentioned facilities is 7. In the physical and financial schedule, individual actions are assigned to the objects broken down by category of work according to the list below, with each building marking the work concerned: — preparatory work: technical documentation, audits, – warming, – carpentry, – central heating installations, boiler room, – lighting, – production of photovoltaic installation, – investor supervision. A measure of achievement of the objectives will be: a) reduction of the annual final energy demand by 74,45 %, (b) the use of mandatory heat accounting equipment: the project designs heat meters for individual heat cycles (c.o. and cwu) in a heat node (attached – "oil. 16 c: Boiler room, what Thermo Tukhov, Disorder") c) use of equipment that maintains the specified temperature: the project uses weather regulators, thermostatic valves on radiators and control valves, for static regulation – dynamic availability pressure control function performed by electronically controlled pumps. d) reduction of greenhouse gas emissions (CO2) by 76.735 %, e) reduction of PM2.5 dust emissions by 99.52 % and PM10 dusts by 99.57 %. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of three tasks, each involving one of three objects: Task 1. General Education High School in Tuchów (Skr. Lo Tuchów). The investment will cover one building: the school building (built no. 1). Task 2. Centre for Vocational and Continuing Education in Tuchów (Skr. “CKZiU Tuchów”. The investment will include four buildings – school (building no. 2), school workshops (building no. 3), school workshops – car and didactic workshops (building no. 4), school workshops – welding room and forge (building no. 5). Task 3. Secondary Schools in Zakliczin (Skr. ZSP Zakliczyn). The investment will cover two buildings: workshops (building no. 6) and workshops – workshop number 2 (construction no. 7) The total number of buildings covered by the project in the above mentioned facilities is 7. In the physical and financial schedule, individual actions are assigned to the objects broken down by category of work according to the list below, with each building marking the work concerned: — preparatory work: technical documentation, audits, – warming, – carpentry, – central heating installations, boiler room, – lighting, – production of photovoltaic installation, – investor supervision. A measure of achievement of the objectives will be: a) reduction of the annual final energy demand by 74,45 %, (b) the use of mandatory heat accounting equipment: the project designs heat meters for individual heat cycles (c.o. and cwu) in a heat node (attached – "oil. 16 c: Boiler room, what Thermo Tukhov, Disorder") c) use of equipment that maintains the specified temperature: the project uses weather regulators, thermostatic valves on radiators and control valves, for static regulation – dynamic availability pressure control function performed by electronically controlled pumps. d) reduction of greenhouse gas emissions (CO2) by 76.735 %, e) reduction of PM2.5 dust emissions by 99.52 % and PM10 dusts by 99.57 %. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 11:22, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the teaching facilities of Tarnowski District in Tuchów and Zakryczyn |
Project in Poland financed by DG Regio |
Statements
2,790,244.1 zloty
0 references
4,678,477.7 zloty
0 references
59.64 percent
0 references
1 July 2015
0 references
31 December 2018
0 references
POWIAT TARNOWSKI
0 references
Projekt składa się z trzech zadań, z których każde dotyczy jednego z trzech obiektów: Zadanie 1. Liceum Ogólnokształcące w Tuchowie (skr. LO Tuchów). Inwestycja obejmie jeden budynek: budynek szkoły (bud. nr 1). Zadanie 2. Centrum Kształcenia Zawodowego i Ustawicznego w Tuchowie (skr. CKZiU Tuchów). Inwestycja obejmie cztery budynki – szkoła (bud. nr 2), warsztaty szkolne (bud. nr 3), warsztaty szkolne - pracownie samochodowe i dydaktyczne (bud. nr 4), warsztaty szkolne – spawalnia i kuźnia (bud. nr 5). Zadanie 3. Zespół Szkół Ponadgimnazjalnych w Zakliczynie (skr. ZSP Zakliczyn). Inwestycja obejmie dwa budynki: warsztaty (bud. nr 6) oraz warsztaty – pracownie numer 2 (bud. nr 7) Łączna liczba budynków objętych projektem w wyżej wymienionych obiektach wynosi 7. W harmonogramie rzeczowo - finansowym poszczególne działania zostały przypisane do obiektów w podziale na kategorie prac według listy poniżej z każdorazowym zaznaczeniem jakiego budynku dotyczą dane prace: - prace przygotowawcze: dokumentacja techniczna, audyty, - docieplenie, - stolarka, - instalacje c.o. i cwu, kotłownia, - oświetlenie, - wykonanie instalacji fotowoltaicznej, - nadzór inwestorski. Miernikiem osiągnięcia przyjętych celów będą: a) zmniejszenie rocznego zapotrzebowania na energię końcową o 74,45 %, b) zastosowanie obowiązkowych urządzeń służących do rozliczania ciepła: w projekcie zaprojektowano liczniki ciepła dla poszczególnych obiegów cieplnych (c.o. i cwu) w węźle cieplnym (w załączeniu – „zał. 16 c: Kotlownia, co termo Tuchow, Zakliczyn”) c) zastosowanie urządzeń utrzymujących zadaną temperaturę: w projekcie zastosowano regulatory pogodowe, zawory termostatyczne na grzejnikach i zawory regulacyjne podpionowe, do regulacji statycznej - funkcja dynamicznej regulacji ciśnienia dyspozycyjnego realizowana przez pompy sterowane elektronicznie. d) redukcja emisji gazów cieplarnianych (CO2) o 76,735 %, e) obniżenie emisji pyłów PM2,5 o 99,52 % i pyłów PM10 o 99,57%. (Polish)
0 references
The project consists of three tasks, each involving one of three objects: Task 1. General Education High School in Tuchów (Skr. Lo Tuchów). The investment will cover one building: the school building (built no. 1). Task 2. Centre for Vocational and Continuing Education in Tuchów (Skr. “CKZiU Tuchów”. The investment will include four buildings – school (building no. 2), school workshops (building no. 3), school workshops – car and didactic workshops (building no. 4), school workshops – welding room and forge (building no. 5). Task 3. Secondary Schools in Zakliczin (Skr. ZSP Zakliczyn). The investment will cover two buildings: workshops (building no. 6) and workshops – workshop number 2 (construction no. 7) The total number of buildings covered by the project in the above mentioned facilities is 7. In the physical and financial schedule, individual actions are assigned to the objects broken down by category of work according to the list below, with each building marking the work concerned: — preparatory work: technical documentation, audits, – warming, – carpentry, – central heating installations, boiler room, – lighting, – production of photovoltaic installation, – investor supervision. A measure of achievement of the objectives will be: a) reduction of the annual final energy demand by 74,45 %, (b) the use of mandatory heat accounting equipment: the project designs heat meters for individual heat cycles (c.o. and cwu) in a heat node (attached – "oil. 16 c: Boiler room, what Thermo Tukhov, Disorder") c) use of equipment that maintains the specified temperature: the project uses weather regulators, thermostatic valves on radiators and control valves, for static regulation – dynamic availability pressure control function performed by electronically controlled pumps. d) reduction of greenhouse gas emissions (CO2) by 76.735 %, e) reduction of PM2.5 dust emissions by 99.52 % and PM10 dusts by 99.57 %. (English)
20 October 2020
0 references
Identifiers
RPMP.04.03.02-12-0202/16
0 references