Q112213 (Q112213): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The implementation of the project will help to meet the objectives of the European Parliament on the energy and climate package, i.e. emissions of greenhouse gases will be reduced, energy from RES will be obtained and energy efficiency improved. The project consists of two tasks of thermal modernisation of swimming pool buildings located: on the wasp. Colourful 29b in Krakow and at ul. Francesco Nullo 23 in Kraków. The scope of thermal retrofitt...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 11:22, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
1,230,716.88 zloty
0 references
2,051,194.81 zloty
0 references
60.0 percent
0 references
13 May 2016
0 references
1 November 2018
0 references
GMINA MIEJSKA KRAKÓW
0 references
Zrealizowanie projektu pomoże spełnić założenia Parlamentu Europejskiego w sprawie pakietu energetycznoklimatycznego, tj. zostanie zmniejszona emisja gazów cieplarnianych, pozyskana zostanie energia z OŹE oraz poprawiona zostanie efektywność energetyczna. Projekt składa się z dwóch zadań termomodernizacji budynków basenów zlokalizowanych: na os. Kolorowym 29b w Krakowie oraz przy ul. Francesco Nullo 23 w Krakowie. Zakres prac termomodernizacyjnych ich koszty oraz opłacalność została szczegółowo opisana w wykonanych audytach energetycznych dla budynków. Z uwagi na charakter budynków i wysoką temperaturę projektowaną w budynku występują bardzo duże straty ciepła. Ponadto bardzo energochłonne jest podgrzewanie wody basenowej będącej w cyrkulacji oraz ciepłej wody do zasilenia natrysków. Dla obu zadań zdecydowano się na ocieplenie niezaizolowanych ścian zewnętrznych, tak aby spełnione były warunki dotyczące izolacyjności cieplnej budynków zawarte w wymogach technicznych jakim powinny odpowiadać budynki i ich usytuowanie oraz w metodyce wykonywania audytów energetycznych dla budynków. Dla obu budynków należy zapewnić oświetlenie spełniające normy PNEN 124641:2012 oraz zastosować źródła energooszczędne zgodnie z metodyką audytów energetycznych. Na os. Kolorowym 29b zaproponowano wymianę centrali wentylacyjnej na centralę z rekuperatorem odzyskującym ciepło, montaż kolektorów słonecznych dla obniżenia kosztów przygotowania ciepłej wody, montaż nawiewników w oknach w pomieszczeniach wentylowanych grawitacyjnie oraz montaż zaworów termostatycznych na grzejniki. Dla budynku na ul. Francesco Nullo zaproponowano modernizację instalacji centralnego ogrzewania, wymianę starych okien w piwnicy oraz wymianę skorodowanej ściany osłonowej basenu wraz z oknami. Dzięki przeprowadzonym zadaniom sumarycznie zostanie zaoszczędzone 37,62 energii elektrycznej, 30,64 energii cieplnej, 31,39 energii końcowej, 32,15 energii pierwotnej, 31,39 emisji gazów cieplarnianych. (Polish)
0 references
The implementation of the project will help to meet the objectives of the European Parliament on the energy and climate package, i.e. emissions of greenhouse gases will be reduced, energy from RES will be obtained and energy efficiency improved. The project consists of two tasks of thermal modernisation of swimming pool buildings located: on the wasp. Colourful 29b in Krakow and at ul. Francesco Nullo 23 in Kraków. The scope of thermal retrofitting works, their costs and cost-effectiveness are described in detail in the performed energy audits for buildings. Due to the nature of the buildings and the high temperature designed in the building, there are very high heat losses. In addition, it is very energy-intensive to heat up the pool water that is circulating and hot water for spraying. For both tasks, it was decided to warm the non-insulated exterior walls so that the conditions for thermal insulation of buildings contained in the technical requirements to which buildings should meet and their location and the methodology for carrying out energy audits for buildings were met. For both buildings, lighting that meets PNEN 124641:2012 standards should be provided and energy-efficient sources used in accordance with the energy audit methodology. On the wasp. Coloured 29b was proposed to replace the ventilation control panel with a heat recovery recuperator, installation of solar collectors to reduce the cost of preparing hot water, installation of vents in windows in gravity vents and installation of thermostatic valves on radiators. For the building on the street. Francesco Nullo was proposed to modernise the central heating system, replace the old windows in the basement and replace the corroded wall of the pool with the windows. Overall, 37.62 electricity, 30.64 heat, 31.39 final energy, 32.15 primary energy, 31.39 greenhouse gas emissions will be saved as a result of the tasks carried out. (English)
20 October 2020
0 references
Identifiers
RPMP.04.03.01-12-0453/17
0 references