Adaptation of the premises of the Team of the School Complex in Strzyżów for educational activities together with the social facilities and the purchase of the necessary equipment (Q107574): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The main objective of the project is to ensure universal access to high quality pre-school services, which results in the inequality of access to pre-school infrastructure for children aged 3-4. The aim of the project is also to compensate for the educational opportunities of children in rural areas. The project will lead to the creation of a modern, well-equipped pre-school facility for all children, including disabled children. A total of 42...)
Property / summary
The main objective of the project is to ensure universal access to high quality pre-school services, which results in the inequality of access to pre-school infrastructure for children aged 3-4. The aim of the project is also to compensate for the educational opportunities of children in rural areas. The project will lead to the creation of a modern, well-equipped pre-school facility for all children, including disabled children. A total of 42 children of the pre-school-age children 3-4 will be enrolled in a nursery school building in Skrzyżów. Additional results: number of facilities of the pre-school facilities supported — 1. The following tasks will be carried out as part of the project: construction works — refurbishment and conversion of the building (demolition and demolition, internal construction work, renovation of the façade, in the context of a sanitary installation, the construction of a water supply connection in the building, an adaptation of entry for disabled persons and the installation of an energy installation. A playground will be opened and the building will be enclosed. The substrate will be equipped with secure rubber mats that will be used for the playground equipment and for the developing physical fitness of the children. The pre-school will be equipped with a set of teaching aids, ICT equipment (such as interactive whiteboards). The actual number of infrastructure users for the care of 42 persons, the number of facilities adapted to the needs of the persons with incomplete functions — 1, the number of jobs maintained and 8 so, the number of equipment purchased, the number of equipment purchased (5), the capacity covered by the support for infrastructure for childcare (42). (English)
 
Property / summary: The main objective of the project is to ensure universal access to high quality pre-school services, which results in the inequality of access to pre-school infrastructure for children aged 3-4. The aim of the project is also to compensate for the educational opportunities of children in rural areas. The project will lead to the creation of a modern, well-equipped pre-school facility for all children, including disabled children. A total of 42 children of the pre-school-age children 3-4 will be enrolled in a nursery school building in Skrzyżów. Additional results: number of facilities of the pre-school facilities supported — 1. The following tasks will be carried out as part of the project: construction works — refurbishment and conversion of the building (demolition and demolition, internal construction work, renovation of the façade, in the context of a sanitary installation, the construction of a water supply connection in the building, an adaptation of entry for disabled persons and the installation of an energy installation. A playground will be opened and the building will be enclosed. The substrate will be equipped with secure rubber mats that will be used for the playground equipment and for the developing physical fitness of the children. The pre-school will be equipped with a set of teaching aids, ICT equipment (such as interactive whiteboards). The actual number of infrastructure users for the care of 42 persons, the number of facilities adapted to the needs of the persons with incomplete functions — 1, the number of jobs maintained and 8 so, the number of equipment purchased, the number of equipment purchased (5), the capacity covered by the support for infrastructure for childcare (42). (English) / rank
Normal rank
 

Revision as of 10:13, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Adaptation of the premises of the Team of the School Complex in Strzyżów for educational activities together with the social facilities and the purchase of the necessary equipment
Project in Poland financed by DG Regio

    Statements

    0 references
    470,072.3 zloty
    0 references
    112,817.35 Euro
    13 January 2020
    0 references
    553,026.24 zloty
    0 references
    132,726.3 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 November 2015
    0 references
    31 January 2018
    0 references
    GMINA HORODŁO
    0 references

    50°53'38.8"N, 24°2'44.9"E
    0 references
    Cel główny przedsięwzięcia jest zapewnienie powszechnego dostępu do wysokiej jakości usług przedszkolnych, które skutkuje niwelacją nierówności w dostępie do infrastruktury przedszkolnej dzieci w wieku 3-4. Założeniem projektu jest także wyrównanie szans edukacyjnych dzieci z obszarów wiejskich. Rezultatem projektu będzie stworzenie nowoczesnej, dobrze wyposażonej placówki przedszkolnej dostosowanej dla wszystkich dzieci, również niepełnosprawnych. Łącznie projektem zostanie objętych 42 dzieci w wieku przedszkolnym 3-4, które będą uczęszczać do przedszkola w budynku Zespołu Szkół w Srzyżowie. Dodatkowe rezultaty: liczba wspartych obiektów infrastruktury przedszkolnej- 1 sz. W ramach projektu zostaną wykonane następujące zadania: roboty budowlane- modernizacja i adaptacja budynku (rozbiórka i demontaż, prace wewnętrzne budowlane, remont elewacji, w ramach instalacji sanitarnej wykonanie przyłącza wodno-kanalizacyjnego wewnątrz budynku, dostosowanie wejścia dla osób niepełnosprawnych i wykonanie instalacji energetycznej. Zostanie zrobiony plac zabaw i ogrodzenie budynku. Podłoże będzie wyposażone w bezpieczne maty gumowe, na których zainstalowane będą urządzenia do zabawy i rozwijające sprawność fizyczną dzieci. Przedszkole zostanie wyposażone w komplet pomocy dydaktycznych, sprzęt ICT (m.in. tablice interaktywne). Rzeczywista liczba użytkowników infrastruktury w zakresie opieki nad dziećmi- 42 os., liczba obiektów dostosowanych do potrzeb osób z niepełno sprawnościami - 1 szt., liczba utrzymanych miejsc pracy-8 os., liczba zakupionego wyposażenia- szt.5, potencjał objętej wsparciem infrastruktury w zakresie opieki nad dziećmi - 42 os. (Polish)
    0 references

    Identifiers

    RPLU.13.05.00-06-0007/15
    0 references