Comprehensive adaptation of degraded GOK building to restore fundamental and new societal functions along with the management of public spaces (Q107537): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The aim was to ensure that this is not the case. Mr P. is improving the quality of life of the inhabitants of the OR and of the Gram as a whole. The problems arising from the diagnosis are being removed for the purposes of the LPR. Target group: residents of G. Goraj, associations, artistic groups, departmental teams for the sake of social unrest Results: Number of persons used. P.-4377os./rok; Products: The number of infrastructure facilities...) |
(Created claim: summary (P836): The target is deep. P. is to improve the quality of life of the inhabitants of OR and the whole Gm. Goraj. P. is responding to problems resulting from the diagnosis prepared for the needs of LPR. Target group: residents of G. Goraj, associations, artistic groups, department teams. Results: Number of persons benefiting from infrastr. social/culture./tourist. before. P.-4377os./year; Products: Number of infrastr. objects for OR-1 pieces; Number of...) |
||||||||||||||
Property / summary | |||||||||||||||
The target is deep. P. is to improve the quality of life of the inhabitants of OR and the whole Gm. Goraj. P. is responding to problems resulting from the diagnosis prepared for the needs of LPR. Target group: residents of G. Goraj, associations, artistic groups, department teams. Results: Number of persons benefiting from infrastr. social/culture./tourist. before. P.-4377os./year; Products: Number of infrastr. objects for OR-1 pieces; Number of facilities available for the needs of people with disabilities-1 pieces, Area of area covered by revitalisation.-0.08 ha; Effects:increase access to the labour market;increase inactivities; limit.social problems; increase access to social services. Design tasks:1) works modern interior building.:*Refurbishment of the auditorium,*intersection and staircase,*refurbishment and adaptation of the premises,*thermotorisation works*(warming of the walls, installation of the thermostatic valves, boiler for the biomass),*installation of the incoming platform on the chest* 4) sanitary installations inside: *water, fire-fighting, * sewerage,“c.o. attic,”ventilation of the mech. hall specisk., *air conditioning of the auditorium.* monoconductive and gravitational ventilation, biomass boiler room; 5) land use:*work. demolition,* recreational worlds,*recreation circles and relaxation circles.,*surfaces, *small architecture-*playing tables-2pcs.,"park bells-2pieces.,*garden pots-3pieces.;6)purchase of building equipment. As a result of the project, the building will be modernised and equipped, which will allow it to restore its original and to give new functions to society-cultures. (English) | |||||||||||||||
Property / summary: The target is deep. P. is to improve the quality of life of the inhabitants of OR and the whole Gm. Goraj. P. is responding to problems resulting from the diagnosis prepared for the needs of LPR. Target group: residents of G. Goraj, associations, artistic groups, department teams. Results: Number of persons benefiting from infrastr. social/culture./tourist. before. P.-4377os./year; Products: Number of infrastr. objects for OR-1 pieces; Number of facilities available for the needs of people with disabilities-1 pieces, Area of area covered by revitalisation.-0.08 ha; Effects:increase access to the labour market;increase inactivities; limit.social problems; increase access to social services. Design tasks:1) works modern interior building.:*Refurbishment of the auditorium,*intersection and staircase,*refurbishment and adaptation of the premises,*thermotorisation works*(warming of the walls, installation of the thermostatic valves, boiler for the biomass),*installation of the incoming platform on the chest* 4) sanitary installations inside: *water, fire-fighting, * sewerage,“c.o. attic,”ventilation of the mech. hall specisk., *air conditioning of the auditorium.* monoconductive and gravitational ventilation, biomass boiler room; 5) land use:*work. demolition,* recreational worlds,*recreation circles and relaxation circles.,*surfaces, *small architecture-*playing tables-2pcs.,"park bells-2pieces.,*garden pots-3pieces.;6)purchase of building equipment. As a result of the project, the building will be modernised and equipped, which will allow it to restore its original and to give new functions to society-cultures. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The target is deep. P. is to improve the quality of life of the inhabitants of OR and the whole Gm. Goraj. P. is responding to problems resulting from the diagnosis prepared for the needs of LPR. Target group: residents of G. Goraj, associations, artistic groups, department teams. Results: Number of persons benefiting from infrastr. social/culture./tourist. before. P.-4377os./year; Products: Number of infrastr. objects for OR-1 pieces; Number of facilities available for the needs of people with disabilities-1 pieces, Area of area covered by revitalisation.-0.08 ha; Effects:increase access to the labour market;increase inactivities; limit.social problems; increase access to social services. Design tasks:1) works modern interior building.:*Refurbishment of the auditorium,*intersection and staircase,*refurbishment and adaptation of the premises,*thermotorisation works*(warming of the walls, installation of the thermostatic valves, boiler for the biomass),*installation of the incoming platform on the chest* 4) sanitary installations inside: *water, fire-fighting, * sewerage,“c.o. attic,”ventilation of the mech. hall specisk., *air conditioning of the auditorium.* monoconductive and gravitational ventilation, biomass boiler room; 5) land use:*work. demolition,* recreational worlds,*recreation circles and relaxation circles.,*surfaces, *small architecture-*playing tables-2pcs.,"park bells-2pieces.,*garden pots-3pieces.;6)purchase of building equipment. As a result of the project, the building will be modernised and equipped, which will allow it to restore its original and to give new functions to society-cultures. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 10:06, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Comprehensive adaptation of degraded GOK building to restore fundamental and new societal functions along with the management of public spaces |
Project in Poland financed by DG Regio |
Statements
1,398,783.59 zloty
0 references
1,645,627.84 zloty
0 references
85.0 percent
0 references
26 April 2016
0 references
31 July 2020
0 references
GMINA GORAJ
0 references
Celem gł. P. jest podniesienie jakości życia mieszkańców OR oraz całej Gm. Goraj. P. jest odpow. na problemy wynikające z diagnozy przygot. na potrzeby LPR. Grupa docel: mieszkańcy G. Goraj, stowarzyszenia, grupy artystyczne, zespoły dział.na rzecz rozw. lok. społ. Rezultaty: Liczba osób korzyst. z obiektów infrastr. społ./kultur./ turyst. będącej przed. P.-4377os./rok; Produkty: Liczba obiektów infrastr. zlokaliz.na OR-1szt.; Liczba obiektów dost. do potrzeb osób z niepełnosprawnościami-1szt., Powierzchnia obsz. objętych rewitaliz.-0,08 ha; Efekty:zwiększ. dostępn. do rynku pracy;wzrost aktywn. gospod.; ogranicz.problemów społ; zwiększenie dostępu do usług społ. (punkt poradn. społ. i wypożyczalnia sprzętu rehablit.)i kultur.;zwiększenie bezpiecz.Zadania w projekcie:1) prace modern. budynku wewn.:*remont sali widowiskowej,*przeb.stropu i schodów,*remont i adaptacja pomieszczeń,*roboty termomodernizacyjne(docieplenie ścian, montaż zaworów termostatycznych,kocioł na biomasę),*montaż platformy przychodowej na klatce schodowej, *montaż podnośnika przy wejściu głównym,*zadaszenie schodów zewnętrznych, 2)instalacje elektryczne wewn.:*prace demontażowe,*inst. oświetleniowa,*inst.ganiazdowa,*sieć komputerowa,*oświetlenie sceny,*nagłośnienie sceniczne, *nagłośnienie mowy, *inst. alarmowa,*syst.oddymiania,3) instlacje elekt.zewnętrz.:*monitoring CCTV IP, *isnt.odgromowa,*oświetlenie zewn. 4) instalacje sanitarne wewn.: *wodociągowa,*przeciwpożarowa, *kanalizacyjna,*c.o.poddasza,*wentylacja mech. sali widowisk.,*klimatyzacja sali widow.*wentylacja jednoprzewodowa i grawitacyjna,*kotłownia na biomasę; 5)zagospodarowanie terenu:*rob.rozbiórkowe,*wiata rekrea.,*gabiony,*krąg rekreacyjno-wypoczy.,*nawierzchnie, *mała architektura-*stoły do gry-2szt.,*ławki parkowe-2szt.,*donice ogrodowe-3szt.;6)zakup wyposażenia budynku. W efekcie realizacji proj. zmodernizowany i wyposażony zostanie budynek,co pozwoli na przywrócenie mu pierwotnych oraz nadanie nowych funkcji społ.-kultur. (Polish)
0 references
The target is deep. P. is to improve the quality of life of the inhabitants of OR and the whole Gm. Goraj. P. is responding to problems resulting from the diagnosis prepared for the needs of LPR. Target group: residents of G. Goraj, associations, artistic groups, department teams. Results: Number of persons benefiting from infrastr. social/culture./tourist. before. P.-4377os./year; Products: Number of infrastr. objects for OR-1 pieces; Number of facilities available for the needs of people with disabilities-1 pieces, Area of area covered by revitalisation.-0.08 ha; Effects:increase access to the labour market;increase inactivities; limit.social problems; increase access to social services. Design tasks:1) works modern interior building.:*Refurbishment of the auditorium,*intersection and staircase,*refurbishment and adaptation of the premises,*thermotorisation works*(warming of the walls, installation of the thermostatic valves, boiler for the biomass),*installation of the incoming platform on the chest* 4) sanitary installations inside: *water, fire-fighting, * sewerage,“c.o. attic,”ventilation of the mech. hall specisk., *air conditioning of the auditorium.* monoconductive and gravitational ventilation, biomass boiler room; 5) land use:*work. demolition,* recreational worlds,*recreation circles and relaxation circles.,*surfaces, *small architecture-*playing tables-2pcs.,"park bells-2pieces.,*garden pots-3pieces.;6)purchase of building equipment. As a result of the project, the building will be modernised and equipped, which will allow it to restore its original and to give new functions to society-cultures. (English)
20 October 2020
0 references
Identifiers
RPLU.13.04.00-06-0034/17
0 references