Thermal modernisation of the public utilities of the Parczew District (Q105359): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The main objective of the project is to improve energy efficiency in public buildings in the parczew unit by implementing comprehensive thermal modernisation tasks. The project includes: Warsaw School Complex in Parczew — Assembly of the gas boiler and replacement of the heater system, replacement of radiators, installation of thermostatic valves, insulation of the ceiling ceiling, insulation of the outer walls, execution of the installation f...) |
(Created claim: summary (P836): The main objective of the project is to improve energy efficiency in public utility buildings in the Parczewski Powiat by carrying out comprehensive thermomodernisation tasks. The project shall include: PSP School Workshop in Parczew – installation of a gas boiler and replacement of central heating installations, replacement of heaters, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls, construct...) |
||||||||||||||
Property / summary | |||||||||||||||
The main objective of the project is to improve energy efficiency in public utility buildings in the Parczewski Powiat by carrying out comprehensive thermomodernisation tasks. The project shall include: PSP School Workshop in Parczew – installation of a gas boiler and replacement of central heating installations, replacement of heaters, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls, construction of central heating installations. Building of the District Public Library – Cultural Centre: installation of a gas boiler and replacement of central heating systems, replacement of radiators, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls. ILO building in Parczew: central heating installation, warming of the roof of the attic, warming of ceilings, warming of the roof of the gym, construction of central heating installations, warming of external walls, window replacement. Team of secondary schools: warming of the roof of the attic, ceiling, exterior walls, roof of sports hall, ceiling connector, replacement of windows, external doors, central heating system. As a result of the implementation of Option 1 for deep, comprehensive energy modernisation, energy efficiency will increase by 60.25 %. Through the implementation of the project, the following result indicators will be achieved: The amount of thermal energy saved (GJ/year) – 7 924, 64; Estimated annual reduction in greenhouse gas emissions (tonCO2/year) – 749, 83; Reduction of annual primary energy consumption in public buildings (kWh/year) – 2 317 128, 25. The project meets the needs of all stakeholder groups. (English) | |||||||||||||||
Property / summary: The main objective of the project is to improve energy efficiency in public utility buildings in the Parczewski Powiat by carrying out comprehensive thermomodernisation tasks. The project shall include: PSP School Workshop in Parczew – installation of a gas boiler and replacement of central heating installations, replacement of heaters, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls, construction of central heating installations. Building of the District Public Library – Cultural Centre: installation of a gas boiler and replacement of central heating systems, replacement of radiators, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls. ILO building in Parczew: central heating installation, warming of the roof of the attic, warming of ceilings, warming of the roof of the gym, construction of central heating installations, warming of external walls, window replacement. Team of secondary schools: warming of the roof of the attic, ceiling, exterior walls, roof of sports hall, ceiling connector, replacement of windows, external doors, central heating system. As a result of the implementation of Option 1 for deep, comprehensive energy modernisation, energy efficiency will increase by 60.25 %. Through the implementation of the project, the following result indicators will be achieved: The amount of thermal energy saved (GJ/year) – 7 924, 64; Estimated annual reduction in greenhouse gas emissions (tonCO2/year) – 749, 83; Reduction of annual primary energy consumption in public buildings (kWh/year) – 2 317 128, 25. The project meets the needs of all stakeholder groups. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The main objective of the project is to improve energy efficiency in public utility buildings in the Parczewski Powiat by carrying out comprehensive thermomodernisation tasks. The project shall include: PSP School Workshop in Parczew – installation of a gas boiler and replacement of central heating installations, replacement of heaters, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls, construction of central heating installations. Building of the District Public Library – Cultural Centre: installation of a gas boiler and replacement of central heating systems, replacement of radiators, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls. ILO building in Parczew: central heating installation, warming of the roof of the attic, warming of ceilings, warming of the roof of the gym, construction of central heating installations, warming of external walls, window replacement. Team of secondary schools: warming of the roof of the attic, ceiling, exterior walls, roof of sports hall, ceiling connector, replacement of windows, external doors, central heating system. As a result of the implementation of Option 1 for deep, comprehensive energy modernisation, energy efficiency will increase by 60.25 %. Through the implementation of the project, the following result indicators will be achieved: The amount of thermal energy saved (GJ/year) – 7 924, 64; Estimated annual reduction in greenhouse gas emissions (tonCO2/year) – 749, 83; Reduction of annual primary energy consumption in public buildings (kWh/year) – 2 317 128, 25. The project meets the needs of all stakeholder groups. (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 08:58, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the public utilities of the Parczew District |
Project in Poland financed by DG Regio |
Statements
3,623,958.0 zloty
0 references
4,263,480.02 zloty
0 references
85.0 percent
0 references
23 August 2017
0 references
31 October 2021
0 references
POWIAT PARCZEWSKI
0 references
Celem głównym projektu jest poprawa efektywności energetycznej w budynkach użyteczności publicznej w Powiecie Parczewskim poprzez realizację kompleksowych zadań termomodernizacyjnych. Projekt obejmuje: Warsztaty Szkolne ZSP w Parczewie - montaż kotła gazowego oraz wymianę instalacji c.o., wymianę grzejników, montaż zaworów termostatycznych, ocieplenie stropu poddasza, ocieplenie ścian zewnętrznych, wykonanie instalacji c.w.u. Budynek Powiatowej Biblioteki Publicznej - Centrum Kultury: montaż kotła gazowego oraz wymianę instalacji c.o., wymianę grzejników, montaż zaworów termostatycznych, ocieplenie stropu poddasza, ocieplenie ścian zewnętrznych. Budynek ILO w Parczewie: instalacja c.o., ocieplenie stropu poddasza, ocieplenie stropodachu, ocieplenie dachu sali gimnastycznej , wykonanie instalacji c.w.u., ocieplenie ścian zewnętrznych, wymiana okien. Zespół Szkół Ponadgimnazjalnych: ocieplenie stropu poddasza, stropodachu, ścian zewnętrznych, dachu hali sportowej, stropodachu łącznika, wymiana okien, drzwi zewnętrznych, instalacji c.w.u.. W wyniku realizacji wariantu 1 z zakresu głębokiej, kompleksowej modernizacji energetycznej efektywność energetyczna zwiększy się o 60,25%. Dzięki realizacji projektu zostaną osiągnięte następujące wskaźniki rezultatu: Ilość zaoszczędzonej energii cieplnej (GJ/rok) - 7 924, 64; Szacowany roczny spadek emisji gazów cieplarnianych (tonCO2/rok) - 749, 83; Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (kWh/rok) - 2 317 128, 25. Projekt spełnia potrzeby wszystkich grup interesariuszy. (Polish)
0 references
The main objective of the project is to improve energy efficiency in public utility buildings in the Parczewski Powiat by carrying out comprehensive thermomodernisation tasks. The project shall include: PSP School Workshop in Parczew – installation of a gas boiler and replacement of central heating installations, replacement of heaters, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls, construction of central heating installations. Building of the District Public Library – Cultural Centre: installation of a gas boiler and replacement of central heating systems, replacement of radiators, installation of thermostatic valves, warming of the ceiling of the attic, warming of external walls. ILO building in Parczew: central heating installation, warming of the roof of the attic, warming of ceilings, warming of the roof of the gym, construction of central heating installations, warming of external walls, window replacement. Team of secondary schools: warming of the roof of the attic, ceiling, exterior walls, roof of sports hall, ceiling connector, replacement of windows, external doors, central heating system. As a result of the implementation of Option 1 for deep, comprehensive energy modernisation, energy efficiency will increase by 60.25 %. Through the implementation of the project, the following result indicators will be achieved: The amount of thermal energy saved (GJ/year) – 7 924, 64; Estimated annual reduction in greenhouse gas emissions (tonCO2/year) – 749, 83; Reduction of annual primary energy consumption in public buildings (kWh/year) – 2 317 128, 25. The project meets the needs of all stakeholder groups. (English)
20 October 2020