Thermal modernisation of the building of the Urban Authority in Piaski (Q105342): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main aim of the planned investment is to improve the quality of the social services provided by improving the energy efficiency of the public building in the municipality of Piaski. The project was extended to the municipal authority in Piskaska.For the purpose of the project, the objective of the project will be to significantly improve the quality of the local government’s tasks towards the community in terms of environmental and nature...)
(‎Created claim: summary (P836): The main objective of the planned investment is to improve the quality of social services provided by improving energy efficiency in the public utility building in the municipality of Piaski. The project included the building of the Municipal Office in Piaski.The implementation of the objective will significantly improve the quality of fulfilling the tasks of the local government towards the community in the field of environmental and nature pro...)
Property / summary
 
The main objective of the planned investment is to improve the quality of social services provided by improving energy efficiency in the public utility building in the municipality of Piaski. The project included the building of the Municipal Office in Piaski.The implementation of the objective will significantly improve the quality of fulfilling the tasks of the local government towards the community in the field of environmental and nature protection, which will directly affect the improvement of the quality of life and development of the municipality. The implementation of the project will also make it possible to reduce the costs incurred by residents and applicants to ensure the smooth functioning of the public utility facility. In addition to the thermal modernisation improvements resulting from the audit (warming of the outer walls, roof warming, window replacement, replacement of external doors, replacement of central heating installations, modernisation of the installation of air conditioning, execution of PV installations with a capacity of 10 kWp on the roof of the building), there were also plans to replace the existing boiler’s electricity with a gas boiler.The key results of the project are:1.The efficiency of the energy saving is:1.The amount of thermal energy saved in the building. Production of electricity from newly built RES installations 8,892 MWhe/year, 7.Additional power generation capacity from RES 0.01 MW, 8. Additional electricity generation capacity from RES 0,01 MWe. As a result of the project, the energy efficiency of the building will be increased by 63 %. The target group of the project is mainly residents of the municipality of Piaski, as well as employees and users of the Municipal Office in Piaski. (English)
Property / summary: The main objective of the planned investment is to improve the quality of social services provided by improving energy efficiency in the public utility building in the municipality of Piaski. The project included the building of the Municipal Office in Piaski.The implementation of the objective will significantly improve the quality of fulfilling the tasks of the local government towards the community in the field of environmental and nature protection, which will directly affect the improvement of the quality of life and development of the municipality. The implementation of the project will also make it possible to reduce the costs incurred by residents and applicants to ensure the smooth functioning of the public utility facility. In addition to the thermal modernisation improvements resulting from the audit (warming of the outer walls, roof warming, window replacement, replacement of external doors, replacement of central heating installations, modernisation of the installation of air conditioning, execution of PV installations with a capacity of 10 kWp on the roof of the building), there were also plans to replace the existing boiler’s electricity with a gas boiler.The key results of the project are:1.The efficiency of the energy saving is:1.The amount of thermal energy saved in the building. Production of electricity from newly built RES installations 8,892 MWhe/year, 7.Additional power generation capacity from RES 0.01 MW, 8. Additional electricity generation capacity from RES 0,01 MWe. As a result of the project, the energy efficiency of the building will be increased by 63 %. The target group of the project is mainly residents of the municipality of Piaski, as well as employees and users of the Municipal Office in Piaski. (English) / rank
 
Normal rank
Property / summary: The main objective of the planned investment is to improve the quality of social services provided by improving energy efficiency in the public utility building in the municipality of Piaski. The project included the building of the Municipal Office in Piaski.The implementation of the objective will significantly improve the quality of fulfilling the tasks of the local government towards the community in the field of environmental and nature protection, which will directly affect the improvement of the quality of life and development of the municipality. The implementation of the project will also make it possible to reduce the costs incurred by residents and applicants to ensure the smooth functioning of the public utility facility. In addition to the thermal modernisation improvements resulting from the audit (warming of the outer walls, roof warming, window replacement, replacement of external doors, replacement of central heating installations, modernisation of the installation of air conditioning, execution of PV installations with a capacity of 10 kWp on the roof of the building), there were also plans to replace the existing boiler’s electricity with a gas boiler.The key results of the project are:1.The efficiency of the energy saving is:1.The amount of thermal energy saved in the building. Production of electricity from newly built RES installations 8,892 MWhe/year, 7.Additional power generation capacity from RES 0.01 MW, 8. Additional electricity generation capacity from RES 0,01 MWe. As a result of the project, the energy efficiency of the building will be increased by 63 %. The target group of the project is mainly residents of the municipality of Piaski, as well as employees and users of the Municipal Office in Piaski. (English) / qualifier
 
point in time: 20 October 2020
Timestamp+2020-10-20T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:58, 20 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the building of the Urban Authority in Piaski
Project in Poland financed by DG Regio

    Statements

    0 references
    557,245.15 zloty
    0 references
    133,738.84 Euro
    13 January 2020
    0 references
    655,582.53 zloty
    0 references
    157,339.81 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 December 2018
    0 references
    31 December 2021
    0 references
    GMINA PIASKI
    0 references
    0 references
    Celem głównym planowanej inwestycji jest podniesienie jakości świadczonych usług społecznych dzięki poprawie efektywności energetycznej w budynku użyteczności publicznej na terenie Gminy Piaski. Projektem objęto budynek Urzędu Miejskiego w Piaskach.Realizacja założonego celu pozwoli na znaczne podniesienie jakości wypełniania zadań własnych samorządu lokalnego wobec społeczności w zakresie ochrony środowiska i przyrody, co bezpośrednio wpłynie na podniesienie jakości życia oraz rozwój gminy. Realizacja projektu umożliwi również obniżenie kosztów ponoszonych przez mieszkańców i wnioskodawcę na zapewnienie sprawnego funkcjonowania obiektu użyteczności publicznej. Poza usprawnieniami termomodernizacyjnymi wynikającymi z przeprowadzonego audytu (ocieplenie ścian zewn.,ocieplenie dachu, wymiana okien, wymiana drzwi zewn., wymiana instalacji c.o., modernizacja instalacji klimatyzacji, wykonanie instalacji PV o mocy 10 kWp na dachu budynku), zaplanowano także wymianę istniejącego kotła na kocioł gazowy.Kluczowe rezultaty projektu wyrażone wskaźnikami rezultatu to:1.Ilość zaoszczędzonej energii cieplnej 489,37 GJ/rok, 2.Ilość zaoszczędzonej energii elektrycznej 21,69 MWh/rok,3.Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych 268 082,08 kWh/rok,4.Szacowany roczny spadek emisji gazów cieplarnianych 59,31 tony równoważnika,5.Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE 8,892 MWhe/rok,6. Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE 8,892 MWhe/rok, 7.Dodatkowa zdolność wytwarzania energii ze OZE 0,01 MW, 8. Dodatkowa zdolność wytwarzana energii elektrycznej z OZE 0,01 MWe. W wyniku realizacji projektu nastąpi zwiększenie efektywności energetycznej budynku o 63 %. Grupą docelową projektu są przede wszystkim mieszkańcy Gminy Piaski, oraz pracownicy i użytkownicy budynku Urzędu Miejskiego w Piaskach. (Polish)
    0 references
    The main objective of the planned investment is to improve the quality of social services provided by improving energy efficiency in the public utility building in the municipality of Piaski. The project included the building of the Municipal Office in Piaski.The implementation of the objective will significantly improve the quality of fulfilling the tasks of the local government towards the community in the field of environmental and nature protection, which will directly affect the improvement of the quality of life and development of the municipality. The implementation of the project will also make it possible to reduce the costs incurred by residents and applicants to ensure the smooth functioning of the public utility facility. In addition to the thermal modernisation improvements resulting from the audit (warming of the outer walls, roof warming, window replacement, replacement of external doors, replacement of central heating installations, modernisation of the installation of air conditioning, execution of PV installations with a capacity of 10 kWp on the roof of the building), there were also plans to replace the existing boiler’s electricity with a gas boiler.The key results of the project are:1.The efficiency of the energy saving is:1.The amount of thermal energy saved in the building. Production of electricity from newly built RES installations 8,892 MWhe/year, 7.Additional power generation capacity from RES 0.01 MW, 8. Additional electricity generation capacity from RES 0,01 MWe. As a result of the project, the energy efficiency of the building will be increased by 63 %. The target group of the project is mainly residents of the municipality of Piaski, as well as employees and users of the Municipal Office in Piaski. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0054/19
    0 references