COMPREHENSIVE TERMOMDERNERMINATION OF PUBLIC BUILDINGS IN THE DISTRICT OF RADZYN (Q105316): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The main objective of the project is to increase the energy efficiency of public buildings within the territory of Mr Radzyn, as well as the protection and improvement of the environment through a deep and comprehensive thermal modernisation, including the use of renewable energy sources based on the energy monitoring and management system. This will be achieved through the achievement of the direct objectives of the project resulting from the...) |
||
Property / summary | |||
Property / summary: The main objective of the project is to increase the energy efficiency of public buildings within the territory of Mr Radzyn, as well as the protection and improvement of the environment through a deep and comprehensive thermal modernisation, including the use of renewable energy sources based on the energy monitoring and management system. This will be achieved through the achievement of the direct objectives of the project resulting from the analysis of the problems and needs of the beneficiaries, i.e.: 1. The efficient use of heat 2. A reduction in heating costs 3. The use of energy from RES 4. Improving the conditions for the use of public amenities 5. Improving the uptake of energy. Tasks: fitting-out, management of the site, promotion of Ms, execution of works, T.moderated. 1, ul. Gwardii 4, ul. Traeuta 6, ul. Sikowski 1B by: replacement of windows and doors, insulation of external walls, roofs and ceilings, modernisation of domestic hot water installation, heating system for heating, performance of air conditioning, moderation, ventilation, electrical/lighting, installation of photovoltaic installations and collectors, installation of installation control and management systems. Results: according to the table "section: KEY INDICATOR’. DOC.: County councillor, residents of Mr Radzyn. Description of TECH.- economic altitude. High and qualitative criteria for the materials used and the execution of works. Renovation of buildings and the use of new technologies will reduce the cost of living. The proposed investment does not pose a threat to the safety of people and property, to the deterioration of the environment and to the state of monuments, to the deterioration of health and hygiene conditions and to nuisance to neighbouring areas. Nor has the analysis revealed any obstacles to the implementation of the investment by environmental legislation. (English) / rank | |||
Revision as of 08:57, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | COMPREHENSIVE TERMOMDERNERMINATION OF PUBLIC BUILDINGS IN THE DISTRICT OF RADZYN |
Project in Poland financed by DG Regio |
Statements
2,522,438.58 zloty
0 references
2,967,574.82 zloty
0 references
85.0 percent
0 references
9 March 2016
0 references
15 December 2021
0 references
POWIAT RADZYŃSKI
0 references
Celem głównym projektu jest zwiększenie efektywności energetycznej budynków użyteczności publicznej na terenie p. radzyńskiego oraz ochrona i poprawa stanu środowiska naturalnego poprzez głęboką i kompleksową termomodernizację, wraz z wykorzystaniem odnawialnych źródeł energii opartą o system monitorowania i zarządzania energią. Cel ten zostanie zrealizowany poprzez realizację celów bezpośrednich projektu wynikających z analizy problemów i potrzeb beneficjentów tj.: 1. Efektywne wykorzystanie energii cieplnej 2. Obniżenie kosztów ogrzewania 3. Wykorzystanie energii pochodzącej z OZE 4. Poprawa warunków użytkowania obiektów użyteczności publicznej 5. Poprawa efekt. wykorzystania energii. Zadania: prace przyg., zarządzanie p., promocja p., wykonanie prac t.-moder. przy pl. Potockiego 1, ul. Gwardii 4, ul. Traugutta 6, ul. Sitkowskiego 1B poprzez: wymianę okien i drzwi, docieplenie ścian zewnętrznych, dachów i stropów, modernizacja instalacji ciepłej wody użytkowej, instalacji grzewczej c.o., wykonanie inst. klimatyzacji, moder. wentylacji, inst. elektrycznych/oświetlenia, montaż instalacji fotowoltaiki i kolektorów słonecznych, wykonanie systemów sterowania i zarządzania obiektami. Rezultaty: zgodnie z tabelą "sekcja: WSKAŹNIK KLUCZOWY". GR. DOC.: Powiat radzyński,mieszkańcy p. radzyńskiego. OPIS TECH.- EKONOM- wysokia jakość realizacji. Wysokie i kryteria jakościowe, dotyczące zastosowanych materiałów i wykonania robót. Termomodernizacja budynków i zastosowanie nowych technologii obniży koszty utrzymania. Projektowana inwestycja nie powoduje zagrożenia bezpieczeństwa ludzi i mienia, pogorszenia stanu środowiska i stanu zachowania zabytków, pogorszenia warunków zdrowotno-sanitarnych oraz uciążliwości dla terenów sąsiednich. Niniejsza analiza nie wykazała również przeszkód w realizacji inwestycji ze strony przepisów prawa ochrony środowiska. (Polish)
0 references
Identifiers
RPLU.05.02.00-06-0043/17
0 references