Thermal modernisation of the school facilities in Skierbieszów (Q105239): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of an investment in the thermal renovation of a complex of the buildings of the public office of the Public and Primary School and of the Primary and Primary School in Skiereszeszów. The main aim of the project is to improve the quality of social services provided by improving the use of public buildings. The investment will achieve a 65.02 % increase in the energy efficiency of the building. Scope of the works resulting f...) |
(Created claim: summary (P836): As part of the project, an investment was planned to include a thermomodernisation of the public secondary school complex and the elementary school and kindergarten complex in Skierbieszów. The main objective of the project is to improve the quality of social services provided by improving ef. en. in public buildings. As part of the investment, the energy efficiency of the building will be increased by 65.02 %. Scope of works resulting from the...) |
||||||||||||||
Property / summary | |||||||||||||||
As part of the project, an investment was planned to include a thermomodernisation of the public secondary school complex and the elementary school and kindergarten complex in Skierbieszów. The main objective of the project is to improve the quality of social services provided by improving ef. en. in public buildings. As part of the investment, the energy efficiency of the building will be increased by 65.02 %. Scope of works resulting from the energy audit: 1. Modernisation of heating system – installation of heat pumps and replacement of installation every 2. replacement of door, window and luxphery carpentry, 3. Ceiling warming, 4. Wall warming, 5. replacement of light sources with LED and mounting power management system 6. The project envisages the following tasks: Technical documentation; Energy audit; Feasibility study; Thermo-modernisation; Investor supervision; Project management; Promotion of the project. On the side of ineligible expenditure: bathroom adjustment robots for people with disabilities, heating heating system, fire markings and fire protection, electrical installations – lightning installation and measurements. The following result indicators will be achieved under the investment: Amount of thermal energy savings 948,49 GJ/year Reduction of annual primary energy consumption in public buildings (CI32) 241109,00 kWh/year Estimated annual decrease in greenhouse gas emissions (CI34) 59,03 tonnesCO2/year Number of electricity saved 10.00 MWh/year Production of heat from newly built/new generation capacity of renewable energy installations using RES 165.72 MWh/year Production of heat from newly built installations using RES 165.72,72 (English) | |||||||||||||||
Property / summary: As part of the project, an investment was planned to include a thermomodernisation of the public secondary school complex and the elementary school and kindergarten complex in Skierbieszów. The main objective of the project is to improve the quality of social services provided by improving ef. en. in public buildings. As part of the investment, the energy efficiency of the building will be increased by 65.02 %. Scope of works resulting from the energy audit: 1. Modernisation of heating system – installation of heat pumps and replacement of installation every 2. replacement of door, window and luxphery carpentry, 3. Ceiling warming, 4. Wall warming, 5. replacement of light sources with LED and mounting power management system 6. The project envisages the following tasks: Technical documentation; Energy audit; Feasibility study; Thermo-modernisation; Investor supervision; Project management; Promotion of the project. On the side of ineligible expenditure: bathroom adjustment robots for people with disabilities, heating heating system, fire markings and fire protection, electrical installations – lightning installation and measurements. The following result indicators will be achieved under the investment: Amount of thermal energy savings 948,49 GJ/year Reduction of annual primary energy consumption in public buildings (CI32) 241109,00 kWh/year Estimated annual decrease in greenhouse gas emissions (CI34) 59,03 tonnesCO2/year Number of electricity saved 10.00 MWh/year Production of heat from newly built/new generation capacity of renewable energy installations using RES 165.72 MWh/year Production of heat from newly built installations using RES 165.72,72 (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As part of the project, an investment was planned to include a thermomodernisation of the public secondary school complex and the elementary school and kindergarten complex in Skierbieszów. The main objective of the project is to improve the quality of social services provided by improving ef. en. in public buildings. As part of the investment, the energy efficiency of the building will be increased by 65.02 %. Scope of works resulting from the energy audit: 1. Modernisation of heating system – installation of heat pumps and replacement of installation every 2. replacement of door, window and luxphery carpentry, 3. Ceiling warming, 4. Wall warming, 5. replacement of light sources with LED and mounting power management system 6. The project envisages the following tasks: Technical documentation; Energy audit; Feasibility study; Thermo-modernisation; Investor supervision; Project management; Promotion of the project. On the side of ineligible expenditure: bathroom adjustment robots for people with disabilities, heating heating system, fire markings and fire protection, electrical installations – lightning installation and measurements. The following result indicators will be achieved under the investment: Amount of thermal energy savings 948,49 GJ/year Reduction of annual primary energy consumption in public buildings (CI32) 241109,00 kWh/year Estimated annual decrease in greenhouse gas emissions (CI34) 59,03 tonnesCO2/year Number of electricity saved 10.00 MWh/year Production of heat from newly built/new generation capacity of renewable energy installations using RES 165.72 MWh/year Production of heat from newly built installations using RES 165.72,72 (English) / qualifier | |||||||||||||||
point in time: 20 October 2020
|
Revision as of 08:55, 20 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the school facilities in Skierbieszów |
Project in Poland financed by DG Regio |
Statements
1,626,621.11 zloty
0 references
1,913,671.9 zloty
0 references
85.0 percent
0 references
16 March 2017
0 references
31 October 2020
0 references
GMINA SKIERBIESZÓW
0 references
W ramach projektu zaplanowano inwestycję polegającą na termomodernizacji kompleksu budynków Gimnazjum Publicznego i Zespołu Szkoły Podstawowej i Przedszkola w Skierbieszowie. Celem głównym projektu jest podniesienie jakości świadczonych usług społecznych dzięki poprawie ef. en. w budynkach użyteczności publicznej. W ramach inwestycji osiągnięte zostanie zwiększenie efektywności energetycznej budynku o 65,02 %. Zakres robót wynikający z audytu energetycznego: 1. Modernizacja systemu grzewczego - montaż pomp ciepła i wymiana instalacji co 2. wymiana stolarki drzwiowej, okiennej i luksferów, 3. Docieplenie Stropów, 4. Docieplenie ścian, 5. wymiana źródeł światła na LED I montaż system zarządzania energią 6.Docieplenie podłóg. W projekcie przewidziano następujące zadania: Dokumentacja techniczna; Audyt Energetyczny; Studium Wykonalności; Termomodernizacja; Nadzór inwestorski; Zarządzanie projektem; Promocja projektu. Po stronie wydatków niekwalifikowanych ujęto: roboty dostosowawcze łazienki dla osób niepełnosprawnych, instalacja c.o. grzejnikowa, oznakowania i zabezpieczenia ppoż, instalacje elektryczne - instalacja odgromowa i pomiary. W ramach inwestycji osiągnięte zostaną następujące wartości wskaźników rezultatu: Ilość zaoszczędzonej energii cieplnej 948,49 GJ/rok Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych (CI32) 241 109,00 kWh/rok Szacowany roczny spadek emisji gazów cieplarnianych (CI34) 59,03 tonCO2/rok Ilość zaoszczędzonej energii elektrycznej 10,00 MWh/rok Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE 165,72 MWht/rok Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE 165,72 MWht/rok, Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych MW 0,16, Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych MWt 0,16 (Polish)
0 references
As part of the project, an investment was planned to include a thermomodernisation of the public secondary school complex and the elementary school and kindergarten complex in Skierbieszów. The main objective of the project is to improve the quality of social services provided by improving ef. en. in public buildings. As part of the investment, the energy efficiency of the building will be increased by 65.02 %. Scope of works resulting from the energy audit: 1. Modernisation of heating system – installation of heat pumps and replacement of installation every 2. replacement of door, window and luxphery carpentry, 3. Ceiling warming, 4. Wall warming, 5. replacement of light sources with LED and mounting power management system 6. The project envisages the following tasks: Technical documentation; Energy audit; Feasibility study; Thermo-modernisation; Investor supervision; Project management; Promotion of the project. On the side of ineligible expenditure: bathroom adjustment robots for people with disabilities, heating heating system, fire markings and fire protection, electrical installations – lightning installation and measurements. The following result indicators will be achieved under the investment: Amount of thermal energy savings 948,49 GJ/year Reduction of annual primary energy consumption in public buildings (CI32) 241109,00 kWh/year Estimated annual decrease in greenhouse gas emissions (CI34) 59,03 tonnesCO2/year Number of electricity saved 10.00 MWh/year Production of heat from newly built/new generation capacity of renewable energy installations using RES 165.72 MWh/year Production of heat from newly built installations using RES 165.72,72 (English)
20 October 2020
0 references
Identifiers
RPLU.05.02.00-06-0007/17