(‎Removed claim: summary (P836): The project concerns the complex thermal refurbishment of public buildings in the Flat of Szydłowiecki and the installation of renewable energy sources. The thermal modernisation works will be carried out on buildings owned by Szydłowiec ul. Kościuszki 39, the ‘Szędlovcu ul ul. Kościuszki 39. The PV system will be installed on the CKZiU building in Szydłocua. the photovoltaic installation will not exceed 40kw. An additional element will be the...)
Property / summary
The project concerns the complex thermal refurbishment of public buildings in the Flat of Szydłowiecki and the installation of renewable energy sources. The thermal modernisation works will be carried out on buildings owned by Szydłowiec ul. Kościuszki 39, the ‘Szędlovcu ul ul. Kościuszki 39. The PV system will be installed on the CKZiU building in Szydłocua. the photovoltaic installation will not exceed 40kw. An additional element will be the change in the heating system of the centre of the Centre for Vocational Education and Training in Szydłowiec from coal to gas. The investment will result in a reduction in heat loss, including through external walls, external doors, ceilings, windows. The use of renewable energy technologies (photovoltaic systems) will reduce heating costs and will have a positive impact on the quality of air in the municipality. Low emissions of district heating emissions will be reduced, which can indirectly help to improve the health of the inhabitants. The reduction in pollution will have a positive effect on the condition of other buildings in the district by reducing their degradation (in particular the historic buildings). The project will, inter alia, work on: insulation of walls, replacement of windows, construction of foundation insulation, installation of subvertical and thermostat valves, installation of solar valves and thermostats, installation of photovoltaic installations for demolition works, demolition of internal walls, floor arrival and plaster, construction of excavation works, ventilation with recuperative wall, wall insulation, ceiling insulation, roof insulation, roof insulation, roof of roof, roof (tying) insulation, horizontal and vertical insulation. (English)
 
Property / summary: The project concerns the complex thermal refurbishment of public buildings in the Flat of Szydłowiecki and the installation of renewable energy sources. The thermal modernisation works will be carried out on buildings owned by Szydłowiec ul. Kościuszki 39, the ‘Szędlovcu ul ul. Kościuszki 39. The PV system will be installed on the CKZiU building in Szydłocua. the photovoltaic installation will not exceed 40kw. An additional element will be the change in the heating system of the centre of the Centre for Vocational Education and Training in Szydłowiec from coal to gas. The investment will result in a reduction in heat loss, including through external walls, external doors, ceilings, windows. The use of renewable energy technologies (photovoltaic systems) will reduce heating costs and will have a positive impact on the quality of air in the municipality. Low emissions of district heating emissions will be reduced, which can indirectly help to improve the health of the inhabitants. The reduction in pollution will have a positive effect on the condition of other buildings in the district by reducing their degradation (in particular the historic buildings). The project will, inter alia, work on: insulation of walls, replacement of windows, construction of foundation insulation, installation of subvertical and thermostat valves, installation of solar valves and thermostats, installation of photovoltaic installations for demolition works, demolition of internal walls, floor arrival and plaster, construction of excavation works, ventilation with recuperative wall, wall insulation, ceiling insulation, roof insulation, roof insulation, roof of roof, roof (tying) insulation, horizontal and vertical insulation. (English) / rank
Normal rank
 

Revision as of 17:56, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Low-carbon economy from RES elements to Szydłowiecki
Project in Poland financed by DG Regio

    Statements

    0 references
    1,600,131.5 zloty
    0 references
    384,031.56 Euro
    13 January 2020
    0 references
    2,000,164.38 zloty
    0 references
    480,039.45 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    11 February 2016
    0 references
    31 December 2019
    0 references
    POWIAT SZYDŁOWIECKI
    0 references
    0 references

    51°13'26.0"N, 20°51'27.0"E
    0 references
    Projekt dotyczy kompleksowa termomodernizacji budynków użyteczności publicznej w Powiecie Szydłowieckim oraz instalację odnawialn. źródeł energii. Prace związane z termomodernizacją odbywać się będą na budynkach których właścicielem jest Powiat Szydłowiecki-Centrum Kształcenia Zawodowego i Ustawicznego w Szydłowcu ul. Kościuszki 39, Zespół Szkół im. Korpusu Ochrony Pogranicza w Szydłowcu ul. Kościuszki 39. System fotowoltaiczny zostanie zamontowany na budynku CKZiU w Szydłowcu. instalacja fotowoltaiczna nie będzie przekraczała 40kw. Dodatkowym elementem będzie zmiana systemu ogrzewania w budynku Centrum kształcenia Zawodowego i Ustawicznego w Szydłowcu z węglowego na gazowe. W wyniku realizacji inwestycji nastąpi zmniejszenie utraty ciepła m.in. przez przenikanie przez ściany zewnętrzne, drzwi zewnętrze, stropy, okna. Wykorzystanie technologii odnawialnych źródeł energii (systemy fotowoltaiczne) pozwoli na redukcję kosztów ogrzewania oraz wpłynie pozytywnie na jakość powietrza w gminie. Ograniczeniu ulegnie niska emisja zanieczyszczeń ciepłowniczych, co pośrednio może się przyczynić do poprawy zdrowia mieszkańców. Zmniejszenie ilości zanieczyszczeń będzie miało pozytywne przełożenie na kondycję innych budynków w powiecie ograniczając ich degradację (w szczególności budynków zabytkowych). W ramach projektu zostaną wykonane między innymi prace związane z : docieplenie ścian, wymiana okien, wykonanie izolacji fundamentów, instalacja zaworów podpionowych i termostatów, wykonanie instalacji fotowoltaicznej. roboty rozbiórkowe, wykonanie rozbiórki ścian wewnętrznych, skucie posadzek i tynków, wykonanie wykopów pod fundament, wentylacja wraz z rekuperacją, docieplenie ścian, stropu i wykonanie rusztu podtrzymującego, docieplenie posadzki wraz z wykonaniem ich izolacji, wykonanie stropu na kotłowni i wieńce, więźba dachowa (wiązary), wykonanie izolacji fundamentów poziomo i pionowo. (Polish)
    0 references

    Identifiers

    RPMA.04.02.00-14-5348/16
    0 references