(Removed claim: summary (P836): The project provides for a comprehensive improvement of the energy efficiency of 4 buildings: TSOs do not know — insulation of external walls and ceilings is provided. The TSO in Kozloduy is projected to warming external walls, steep walls, walls on the ground. The TSO in Nowa Sucha — We are looking at the insulation of external walls, steep walls, walls on the ground, replacement of window and door frames. — The school group of the New Sucha...) |
(Created claim: summary (P836): The project envisages a comprehensive improvement in energy efficiency of 4 buildings: OSP in Antoniewo – It is expected to warm the outer walls and ceilings. OSP in Kozłów Szlachecki – It is predicted to warm the outer walls, ceilings and walls on the ground. OSP in Nowa Sucha – It is planned to warm the outer walls, ceilings, walls on the ground, replacement of window and door carpentry. — School Complex in Nowa Sucha, including the Teacher’s...) |
||||||||||||||
Property / summary | |||||||||||||||
The project envisages a comprehensive improvement in energy efficiency of 4 buildings: OSP in Antoniewo – It is expected to warm the outer walls and ceilings. OSP in Kozłów Szlachecki – It is predicted to warm the outer walls, ceilings and walls on the ground. OSP in Nowa Sucha – It is planned to warm the outer walls, ceilings, walls on the ground, replacement of window and door carpentry. — School Complex in Nowa Sucha, including the Teacher’s House (19.30 % of the ZS area in Nowa Sucha, 12.26 % of the total area of all buildings covered by the project).The Teacher’s House is adjacent to one wall with the school building – electricity and heat water is used here separately – the central heating unit powered from the boiler room of the school. —it is expected to use solutions based on the extraction of energy from RES – photovoltaic cells with a power of 22.0 kWp. The PV panels were placed on the roof of the gym and the main school building. In addition, there are works related to the installation of heat pump, gas installation, including 2 condensing boilers 80 kW each, ventilation in the boiler room, electrical installations in the boiler room, central heating installation, heat exchange and installation of thermostatic valves, ground and internal gas installation. The socio-economic problem of low energy efficiency of public buildings in the municipality has been correctly defined. Main objective: increase energy efficiency in public buildings in Nowa Sucha commune. The project will reduce CO2 equivalent emissions by 67.74 %. Reduction of energy demand by 69.64 %. The project’s target group shall be the residents of: Antoniewa, Nowa Suchej and Kozłów Szlachecki, including students and employees of the school covered by the project. Indirect recipients of the project are residents of Nowa Sucha commune. The project positively affects the state of the environment in the commune, thereby improving the quality of life of all inhabitants of the municipality. (English) | |||||||||||||||
Property / summary: The project envisages a comprehensive improvement in energy efficiency of 4 buildings: OSP in Antoniewo – It is expected to warm the outer walls and ceilings. OSP in Kozłów Szlachecki – It is predicted to warm the outer walls, ceilings and walls on the ground. OSP in Nowa Sucha – It is planned to warm the outer walls, ceilings, walls on the ground, replacement of window and door carpentry. — School Complex in Nowa Sucha, including the Teacher’s House (19.30 % of the ZS area in Nowa Sucha, 12.26 % of the total area of all buildings covered by the project).The Teacher’s House is adjacent to one wall with the school building – electricity and heat water is used here separately – the central heating unit powered from the boiler room of the school. —it is expected to use solutions based on the extraction of energy from RES – photovoltaic cells with a power of 22.0 kWp. The PV panels were placed on the roof of the gym and the main school building. In addition, there are works related to the installation of heat pump, gas installation, including 2 condensing boilers 80 kW each, ventilation in the boiler room, electrical installations in the boiler room, central heating installation, heat exchange and installation of thermostatic valves, ground and internal gas installation. The socio-economic problem of low energy efficiency of public buildings in the municipality has been correctly defined. Main objective: increase energy efficiency in public buildings in Nowa Sucha commune. The project will reduce CO2 equivalent emissions by 67.74 %. Reduction of energy demand by 69.64 %. The project’s target group shall be the residents of: Antoniewa, Nowa Suchej and Kozłów Szlachecki, including students and employees of the school covered by the project. Indirect recipients of the project are residents of Nowa Sucha commune. The project positively affects the state of the environment in the commune, thereby improving the quality of life of all inhabitants of the municipality. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project envisages a comprehensive improvement in energy efficiency of 4 buildings: OSP in Antoniewo – It is expected to warm the outer walls and ceilings. OSP in Kozłów Szlachecki – It is predicted to warm the outer walls, ceilings and walls on the ground. OSP in Nowa Sucha – It is planned to warm the outer walls, ceilings, walls on the ground, replacement of window and door carpentry. — School Complex in Nowa Sucha, including the Teacher’s House (19.30 % of the ZS area in Nowa Sucha, 12.26 % of the total area of all buildings covered by the project).The Teacher’s House is adjacent to one wall with the school building – electricity and heat water is used here separately – the central heating unit powered from the boiler room of the school. —it is expected to use solutions based on the extraction of energy from RES – photovoltaic cells with a power of 22.0 kWp. The PV panels were placed on the roof of the gym and the main school building. In addition, there are works related to the installation of heat pump, gas installation, including 2 condensing boilers 80 kW each, ventilation in the boiler room, electrical installations in the boiler room, central heating installation, heat exchange and installation of thermostatic valves, ground and internal gas installation. The socio-economic problem of low energy efficiency of public buildings in the municipality has been correctly defined. Main objective: increase energy efficiency in public buildings in Nowa Sucha commune. The project will reduce CO2 equivalent emissions by 67.74 %. Reduction of energy demand by 69.64 %. The project’s target group shall be the residents of: Antoniewa, Nowa Suchej and Kozłów Szlachecki, including students and employees of the school covered by the project. Indirect recipients of the project are residents of Nowa Sucha commune. The project positively affects the state of the environment in the commune, thereby improving the quality of life of all inhabitants of the municipality. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 17:55, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of public utility buildings in the municipality of Nowa Sear |
Project in Poland financed by DG Regio |
Statements
879,025.81 zloty
0 references
1,098,782.27 zloty
0 references
80.0 percent
0 references
30 January 2015
0 references
30 June 2018
0 references
GMINA NOWA SUCHA
0 references
Projekt przewiduje kompleksową poprawę energooszczędności 4 budynków: OSP w Antoniewie - Przewiduje się ocieplenie ścian zewnętrznych i stropów. OSP w Kozłowie Szlacheckim - Przewiduje się ocieplenie ścian zewnętrznych, stropodachu, ściany na gruncie. OSP w Nowej Suchej - Przewiduje się ocieplenie ścian zewnętrznych, stropodachu, ściany na gruncie, wymiana stolarki okiennej i drzwiowej. - Zespołu Szkół w Nowej Suchej, w tym Dom Nauczyciela (19,30% powierzchni ZS w Nowej Suchej, 12,26% powierzchni wszystkich budynków objętych projektem).Dom Nauczyciela przylega jedną ścianą z budynkiem szkoły - energia elektryczna i woda ciepła użytkowa jest tu osobno rozliczana - c.o. zasilane z kotłowni szkoły. -przewiduje się zastosowanie rozwiązań opartych o pozyskiwanie energii z OZE – ogniw fotowoltaicznych o mocy 22,0 kWp. Panele PV rozmieszczono na dachu Sali Gimnastycznej oraz budynku Głównego Szkoły (środkowego). Ponadto w zakresie rzeczowym znajdują się prace związane z instalacją pompy ciepła, instalacją gazową, w tym 2 kotły wiszące kondensacyjne gazowe 80 kW każdy, wentylacja w kotłowni, instalacje elektryczne w kotłowni, instalacja c.o., w tym wymiana grzejników i montaż zaworów termostatycznych, instalacja gazowa doziemna i wewnętrzna. Prawidłowo zdefiniowano problem społeczno – gospodarczy, jakim jest niska energooszczędność budynków użyteczności publicznej w gminie. Cel główny: zwiększenie efektywności energetycznej w budynkach użyteczności publicznej w gminie Nowa Sucha. W wyniku projektu nastąpi zmniejszenie emisji ekwiwalentu CO2 do powietrza o 67,74%. Zmniejszenie zapotrzebowania na energię o 69,64%. Grupą docelową projektu są mieszkańcy: Antoniewa, Nowej Suchej i Kozłowa Szlacheckiego, w tym uczniowie i pracownicy szkoły objętej projektem. Pośrednimi odbiorcami projektu są mieszkańcy gminy Nowa Sucha. Projekt korzystnie wpływa na stan środowiska naturalnego w gminie przez co poprawi jakość życia wszystkich mieszkańców gminy. (Polish)
0 references
The project envisages a comprehensive improvement in energy efficiency of 4 buildings: OSP in Antoniewo – It is expected to warm the outer walls and ceilings. OSP in Kozłów Szlachecki – It is predicted to warm the outer walls, ceilings and walls on the ground. OSP in Nowa Sucha – It is planned to warm the outer walls, ceilings, walls on the ground, replacement of window and door carpentry. — School Complex in Nowa Sucha, including the Teacher’s House (19.30 % of the ZS area in Nowa Sucha, 12.26 % of the total area of all buildings covered by the project).The Teacher’s House is adjacent to one wall with the school building – electricity and heat water is used here separately – the central heating unit powered from the boiler room of the school. —it is expected to use solutions based on the extraction of energy from RES – photovoltaic cells with a power of 22.0 kWp. The PV panels were placed on the roof of the gym and the main school building. In addition, there are works related to the installation of heat pump, gas installation, including 2 condensing boilers 80 kW each, ventilation in the boiler room, electrical installations in the boiler room, central heating installation, heat exchange and installation of thermostatic valves, ground and internal gas installation. The socio-economic problem of low energy efficiency of public buildings in the municipality has been correctly defined. Main objective: increase energy efficiency in public buildings in Nowa Sucha commune. The project will reduce CO2 equivalent emissions by 67.74 %. Reduction of energy demand by 69.64 %. The project’s target group shall be the residents of: Antoniewa, Nowa Suchej and Kozłów Szlachecki, including students and employees of the school covered by the project. Indirect recipients of the project are residents of Nowa Sucha commune. The project positively affects the state of the environment in the commune, thereby improving the quality of life of all inhabitants of the municipality. (English)
17 October 2020
0 references
Identifiers
RPMA.04.02.00-14-4599/16
0 references