(‎Removed claim: summary (P836): The project for the thermal modernisation of the two public buildings located in the village of Klembów, which is the subject of the application for funding, consists of a set of tasks which are set out in detail in the feasibility study in SubChapter 5.4. The subject of the request will be only those tasks whose cost of implementation falls within the category of eligible costs in the context of the Competition and, at the same time, the impl...)
(‎Created claim: summary (P836): The thermal modernisation project of two public buildings located in the rural municipality of Klembów, which are the subject of a grant application, consists of a set of tasks, which are detailed in the Feasibility Study in subsection 5.4. The subject of the proposal will only be those tasks, the cost of which belongs to the category of eligible costs within the Competition, and at the same time the performance of which results directly from th...)
Property / summary
 
The thermal modernisation project of two public buildings located in the rural municipality of Klembów, which are the subject of a grant application, consists of a set of tasks, which are detailed in the Feasibility Study in subsection 5.4. The subject of the proposal will only be those tasks, the cost of which belongs to the category of eligible costs within the Competition, and at the same time the performance of which results directly from the energy audits carried out, as well as preparatory, investment and related work related to the investment process, the eligibility of which results from the Eligibility Principles of Expenditure under the ROP WM. The project also includes the cost of carrying out energy audits after completion of the investment. The feasibility study shows that it is justified to support this project under WM2014 ROPs, due to: 1. Energy efficiency improvement of the building complex – 68.92 % (69.17 %-UG Klembów, 68.84 % ZS Ostrówek) 2. Increase of the energy standard of building complex, expressed in Eph + in – 61,87 kWh/(m² x year) 3. Cost efficiency – 4.70zł/kWh/year 4. CO2-66.6 % reduction rate 5. In each of the buildings, 6 tasks will be performed affecting the complexity of thermomodernisation activities – Table 1.1 The Feasibility Study, among others, will be used RES through the construction of a photovoltaic installation on the building of the Klembów Municipality 6. The investment is included in the adopted Low-Emission Economy Plan for Klembów Municipality, available at www.klembow.pl The presented indicators are at a level exceeding the experience of existing aid instruments published in Poland. The investment project under preparation covers all tasks that make it possible to create a fully functional and operational infrastructure without the need for additional investment tasks not included in this project. (English)
Property / summary: The thermal modernisation project of two public buildings located in the rural municipality of Klembów, which are the subject of a grant application, consists of a set of tasks, which are detailed in the Feasibility Study in subsection 5.4. The subject of the proposal will only be those tasks, the cost of which belongs to the category of eligible costs within the Competition, and at the same time the performance of which results directly from the energy audits carried out, as well as preparatory, investment and related work related to the investment process, the eligibility of which results from the Eligibility Principles of Expenditure under the ROP WM. The project also includes the cost of carrying out energy audits after completion of the investment. The feasibility study shows that it is justified to support this project under WM2014 ROPs, due to: 1. Energy efficiency improvement of the building complex – 68.92 % (69.17 %-UG Klembów, 68.84 % ZS Ostrówek) 2. Increase of the energy standard of building complex, expressed in Eph + in – 61,87 kWh/(m² x year) 3. Cost efficiency – 4.70zł/kWh/year 4. CO2-66.6 % reduction rate 5. In each of the buildings, 6 tasks will be performed affecting the complexity of thermomodernisation activities – Table 1.1 The Feasibility Study, among others, will be used RES through the construction of a photovoltaic installation on the building of the Klembów Municipality 6. The investment is included in the adopted Low-Emission Economy Plan for Klembów Municipality, available at www.klembow.pl The presented indicators are at a level exceeding the experience of existing aid instruments published in Poland. The investment project under preparation covers all tasks that make it possible to create a fully functional and operational infrastructure without the need for additional investment tasks not included in this project. (English) / rank
 
Normal rank
Property / summary: The thermal modernisation project of two public buildings located in the rural municipality of Klembów, which are the subject of a grant application, consists of a set of tasks, which are detailed in the Feasibility Study in subsection 5.4. The subject of the proposal will only be those tasks, the cost of which belongs to the category of eligible costs within the Competition, and at the same time the performance of which results directly from the energy audits carried out, as well as preparatory, investment and related work related to the investment process, the eligibility of which results from the Eligibility Principles of Expenditure under the ROP WM. The project also includes the cost of carrying out energy audits after completion of the investment. The feasibility study shows that it is justified to support this project under WM2014 ROPs, due to: 1. Energy efficiency improvement of the building complex – 68.92 % (69.17 %-UG Klembów, 68.84 % ZS Ostrówek) 2. Increase of the energy standard of building complex, expressed in Eph + in – 61,87 kWh/(m² x year) 3. Cost efficiency – 4.70zł/kWh/year 4. CO2-66.6 % reduction rate 5. In each of the buildings, 6 tasks will be performed affecting the complexity of thermomodernisation activities – Table 1.1 The Feasibility Study, among others, will be used RES through the construction of a photovoltaic installation on the building of the Klembów Municipality 6. The investment is included in the adopted Low-Emission Economy Plan for Klembów Municipality, available at www.klembow.pl The presented indicators are at a level exceeding the experience of existing aid instruments published in Poland. The investment project under preparation covers all tasks that make it possible to create a fully functional and operational infrastructure without the need for additional investment tasks not included in this project. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:55, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation of the building of the Office of the Municipality of Klembów and the School Complex in the OstEquu
Project in Poland financed by DG Regio

    Statements

    0 references
    1,471,096.6 zloty
    0 references
    353,063.18 Euro
    13 January 2020
    0 references
    1,838,870.75 zloty
    0 references
    441,328.98 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2017
    0 references
    GMINA KLEMBÓW
    0 references

    52°24'23.4"N, 21°19'41.2"E
    0 references
    Projekt termomodernizacji dwóch budynków użyteczności publicznej znajdujących się na terenie wiejskiej Gminy Klembów, będących przedmiotem wniosku o dofinansowanie, składa się z zestawu zadań, które zostały szczegółowo przedstawione w Studium Wykonalności w Podrozdziale 5.4. Przedmiotem wniosku będą jedynie te zadania, których koszt realizacji należy do kategorii kosztów kwalifikowanych w ramach Konkursu, a równocześnie których wykonanie wynika bezpośrednio z przeprowadzonych audytów energetycznych, oraz prace przygotowawcze, inwestycyjne i związane z procesem inwestycyjnym, których kwalifikowalność wynika z Zasad Kwalifikowalności Wydatków w ramach RPO WM. W projekcie ujęty został również koszt przeprowadzenia audytów energetycznych po zakończeniu inwestycji. Studium Wykonalności wykazuje, że uzasadnione jest objęcie tego przedsięwzięcia wsparciem w ramach RPO WM 2014-2020, ze względu na: 1. Stopień poprawy efektywności energetycznej zespołu budynków – 68,92% (69,17%-UG Klembów, 68,84% ZS Ostrówek) 2. Podwyższenie standardu energetycznego zespołu budynków, wyrażone wskaźnikiem EPh + w – 61,87kWh/(m2 x rok) 3. Efektywność kosztowa – 4,70zł/ kWh/rok 4. Stopień redukcji CO2 - 66,6% 5. W każdym z budynków, wykonane zostanie 6 zadań wpływających na kompleksowość działań termomodernizacyjnych – tabela 1.1 Studium Wykonalności, m.in. wykorzystane zostanie OZE poprzez budowę instalacji fotowoltaicznej na budynku Urzędu Gminy Klembów 6. Inwestycja jest ujęta w przyjętym Planie Gospodarki Niskoemisyjnej dla Gminy Klembów, dostępnym na www.klembow.pl Zaprezentowane wskaźniki są na poziomie przewyższającym doświadczenia dotychczasowych instrumentów pomocowych publikowanych w Polsce. Przygotowywany do realizacji projekt inwestycyjny obejmuje wszystkie zadania, które sprawiają, że efektem realizacji projektu jest stworzenie w pełni funkcjonalnej i operacyjnej infrastruktury, bez konieczności realizacji dodatkowych zadań inwestycyjnych nie uwzględnionych w tym proje (Polish)
    0 references
    The thermal modernisation project of two public buildings located in the rural municipality of Klembów, which are the subject of a grant application, consists of a set of tasks, which are detailed in the Feasibility Study in subsection 5.4. The subject of the proposal will only be those tasks, the cost of which belongs to the category of eligible costs within the Competition, and at the same time the performance of which results directly from the energy audits carried out, as well as preparatory, investment and related work related to the investment process, the eligibility of which results from the Eligibility Principles of Expenditure under the ROP WM. The project also includes the cost of carrying out energy audits after completion of the investment. The feasibility study shows that it is justified to support this project under WM2014 ROPs, due to: 1. Energy efficiency improvement of the building complex – 68.92 % (69.17 %-UG Klembów, 68.84 % ZS Ostrówek) 2. Increase of the energy standard of building complex, expressed in Eph + in – 61,87 kWh/(m² x year) 3. Cost efficiency – 4.70zł/kWh/year 4. CO2-66.6 % reduction rate 5. In each of the buildings, 6 tasks will be performed affecting the complexity of thermomodernisation activities – Table 1.1 The Feasibility Study, among others, will be used RES through the construction of a photovoltaic installation on the building of the Klembów Municipality 6. The investment is included in the adopted Low-Emission Economy Plan for Klembów Municipality, available at www.klembow.pl The presented indicators are at a level exceeding the experience of existing aid instruments published in Poland. The investment project under preparation covers all tasks that make it possible to create a fully functional and operational infrastructure without the need for additional investment tasks not included in this project. (English)
    17 October 2020