Q105101 (Q105101): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The idea behind the project is to improve the efficiency of woodwork, which is in line with transnational climate protection measures. Doc: carpentry and building, you know, commune, and tourists. Aim GUI: Improvement of efficiency. en. pres. Construction of Piotr Skrzypek. Objectives of the result: increase energy saving heat and electr, reduce consumption of the final energy, increase. prod. en. el. and heat. with new constructions. inst. use....) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 17:51, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
938,887.52 zloty
0 references
1,444,442.4 zloty
0 references
65.0 percent
0 references
9 May 2017
0 references
30 November 2018
0 references
BUDOWNICTWO PIOTR SKRZYPEK
0 references
Ideą proj. jest poprawa efektyw. en. przeds. drzewnego co jest zgodne z ponadnarodowymi działaniami na rzecz ochrony klimatu. Gr. doc.: przeds. stolarskie i bud., miesz. gminy, oraz turyści. Cel gł.: Poprawa efektyw. en. przeds. BUDOWNICTWO Piotr Skrzypek. Cele rezultatu: wzrost oszczędn. en. cieplnej i elektr, zmniejszenie zużycia en. końcowej, zwiększ. prod. en. el. i ciepl. z nowo wybudow. inst. wykorzyst. OZE, zwiększona zdolność wytwa. en. (el. i ciepl.) ze źródeł odn. Spadek emisji gazów ciepl. Wskaźniki: 1. Ilość zaoszcz. en. ciepln. 191,5GJ/r 2.Ilość zaoszcz. en. el. 84,1MWh/rok, 3. Zmn. zużycia en. k. w wyniku r. proj. 494,24GJ/r. 4. Produkcja en. el. 33,18 MWhe/r., cie.33,61 z nowo wybud/nowych mocy wytwórczych inst. wykorz. OZE: 5. Dodatkowa zdolność wytwarz. en. ze źródeł odn. (CI30): 66,79 MW 2. Szacow. roczny spadek emisji gazów ciepl. (CI34): 56,62 t. ekw. CO2/rok Cele produktu: wzrost l. przeds. otrzymujących wsparcie i przeds., które w wyniku wsparcia poprawiły efektywności energet. oraz l. zmodernizowanych energ. budynków o zwiększonej pow. użytk. poddanej termom.i oraz zwiększona l. wybud. jedn. wytwarz. en. elektr. z i en ciepl. OZE Wskaźniki: l. przeds. otrzymujących wsp. 1szt. l. przeds. o poprawionej efekt. en. 1szt. l. zmodernizowanych energ. budynków 1szt. pow. użytk. bud. poddanych term. 127,48m2 l. wybud. jedn. wytwarz. en. elektr. z OZE 1 szt. l. wybud. jedn. wytwarz. en. ciepl. z OZE 1szt. Produkty: budynek suszarni o wsp. przenikania ciepła ścian 0,16 W/m2K z syst. zarz. en, 1jedn. ciepl. -kocioł na biomasę800 KW ; 1jedn. elektr. (p. fotowoltaiczne 160szt.) o mocy do 40 kW, energooszcz. linia techn. W ramach zadania: audyt energetyczny, Rob. bud. - montaż 1jedn. wytwarz. en. cieplnej z biomasy oraz działania termom.; en. słońca: Dostawa i montaż 1jedn. wytwarz. en. elek. (fotowoltaika), wymiana urządzeń linii techn. oraz syst. zarządz. en. Inwestycja jest zgodna z Programem ochrony powietrza dla strefy lubelskiej z XI. 2013 r. (Polish)
0 references
The idea behind the project is to improve the efficiency of woodwork, which is in line with transnational climate protection measures. Doc: carpentry and building, you know, commune, and tourists. Aim GUI: Improvement of efficiency. en. pres. Construction of Piotr Skrzypek. Objectives of the result: increase energy saving heat and electr, reduce consumption of the final energy, increase. prod. en. el. and heat. with new constructions. inst. use. RES, increased ability to produce. en. (el. and warm.) from springs. Reduction of heat gas emissions. Indicators: 1. Amount of coat. en. heat. 191,5GJ/r 2.Quantity of zale. en. el. 84,1 MWh/year, 3. Consumption of en. k. as a result of the project. 494,24GJ/yr. 4. Production en. el. 33,18 MWhe/yr., p.33,61 from newly built/new generation capacity inst. ext. RES: 5. Additional ability to generate. en. from the sources of the genus. (CI30): 66,79 MW 2. Esteemed annual reduction in heat gas emissions. (CI34): 56,62 t. Ekw. CO2/year Purpose of product: increase l. for the recipients of support and fores, which, as a result of the support, improved the efficiency of energet. and l. of modernised energised buildings with increased area of use subjected to thermal.i and increased l. bud. one generation en. electr. with and en heat. RES Indicators: L. pres. receiving co-operation. 1pcs l. pres. with improved effect. en. 1pcs. l. of modernised energised buildings 1pcs. area of the building undergoing thermal treatment. 127,48 m² l. construction one-manufacturing en. Electr. with RES 1 pcs. Products: building of a drying room with heat penetration walls 0,16 W/m2K with heating system en, 1 single. heat. —biomass boiler800 KW; 1 one. Electrical. (e.g. photovoltaic 160pcs) with power up to 40 kW, energetic. techn line. As part of the task: energy audit, Rob. bud. — assembly of 1 single biomass heat generators and thermometers; sunshine: Delivery and assembly 1jedn. prol. en. elek. (photvoltaics), replacement of techn. line equipment and order system en. The investment is compatible with the program of air protection for the Lublin zone from XI. 2013 (English)
17 October 2020
0 references
Identifiers
RPLU.05.01.00-06-0047/17
0 references