(‎Removed claim: summary (P836): The object of the project is the construction of a 39.73 kW photovoltaic installation at the town of Suzno, in the local area of parcel No 309/6. The electricity produced by the installation will be entirely used by the Applicant. The planned installation will consist of 137 solar panels of the SW 290 mono, TRIO-8.5 (TRIO-) and TRI-27.6-inverters. The PV modules will be distributed evenly in a manner that ensures their maximum exposure to sunl...)
(‎Created claim: summary (P836): The subject of the project is the construction of a photovoltaic installation with a capacity of 39.73 kW in Suszno in the district of Włodawa on the site of plot No. 309/6. The electricity generated by the installation in its entirety will be used by the Applicant. The designed installation will consist of 137 units of SW 290 mono photovoltaic panels, TRIO-8.5 inverter and TRIO-27.6 inverter. PV modules will be distributed evenly in such a way...)
Property / summary
 
The subject of the project is the construction of a photovoltaic installation with a capacity of 39.73 kW in Suszno in the district of Włodawa on the site of plot No. 309/6. The electricity generated by the installation in its entirety will be used by the Applicant. The designed installation will consist of 137 units of SW 290 mono photovoltaic panels, TRIO-8.5 inverter and TRIO-27.6 inverter. PV modules will be distributed evenly in such a way as to ensure their maximum sunshine. The panels will be arranged on a support structure arranged directly on the roof. As a result of the installation of photovoltaic panels on roofs of construction works belonging to the Applicant, there will be no transformation of the site. The implementation of the project will be environmentally neutral. The location of the project is located outside Natura 2000 sites. (English)
Property / summary: The subject of the project is the construction of a photovoltaic installation with a capacity of 39.73 kW in Suszno in the district of Włodawa on the site of plot No. 309/6. The electricity generated by the installation in its entirety will be used by the Applicant. The designed installation will consist of 137 units of SW 290 mono photovoltaic panels, TRIO-8.5 inverter and TRIO-27.6 inverter. PV modules will be distributed evenly in such a way as to ensure their maximum sunshine. The panels will be arranged on a support structure arranged directly on the roof. As a result of the installation of photovoltaic panels on roofs of construction works belonging to the Applicant, there will be no transformation of the site. The implementation of the project will be environmentally neutral. The location of the project is located outside Natura 2000 sites. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the construction of a photovoltaic installation with a capacity of 39.73 kW in Suszno in the district of Włodawa on the site of plot No. 309/6. The electricity generated by the installation in its entirety will be used by the Applicant. The designed installation will consist of 137 units of SW 290 mono photovoltaic panels, TRIO-8.5 inverter and TRIO-27.6 inverter. PV modules will be distributed evenly in such a way as to ensure their maximum sunshine. The panels will be arranged on a support structure arranged directly on the roof. As a result of the installation of photovoltaic panels on roofs of construction works belonging to the Applicant, there will be no transformation of the site. The implementation of the project will be environmentally neutral. The location of the project is located outside Natura 2000 sites. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:33, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Production of energy from RES in ENERCENTRE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOSCIA
Project in Poland financed by DG Regio

    Statements

    0 references
    129,998.96 zloty
    0 references
    31,199.75 Euro
    13 January 2020
    0 references
    199,998.41 zloty
    0 references
    47,999.62 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 February 2018
    0 references
    30 November 2018
    0 references
    ENERGOCENTRUM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy 39,73 kW w miejscowości Suszno w powiecie włodawskim na terenie działki nr 309/6. Energia elektryczna wytwarzana przez instalację w całości będzie użytkowana przez Wnioskodawcę. Projektowana instalacja będzie składać się z 137 sztuk paneli fotowoltaicznych SW 290 mono, inwertera TRIO-8.5 oraz inwertera TRIO-27.6. Moduły PV rozmieszczone będą równomiernie, w sposób zapewniający ich maksymalne nasłonecznienie. Panele zostaną ułożone na konstrukcji wsporczej ułożonej bezpośrednio na dachu. W wyniku montażu paneli fotowoltaicznych na dachach obiektów budowlanych należących do Wnioskodawcy nie nastąpi przekształcenie terenu. Realizacja projektu będzie neutralna dla środowiska. Lokalizacja projektu znajduje się poza obszarami Natura 2000. (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic installation with a capacity of 39.73 kW in Suszno in the district of Włodawa on the site of plot No. 309/6. The electricity generated by the installation in its entirety will be used by the Applicant. The designed installation will consist of 137 units of SW 290 mono photovoltaic panels, TRIO-8.5 inverter and TRIO-27.6 inverter. PV modules will be distributed evenly in such a way as to ensure their maximum sunshine. The panels will be arranged on a support structure arranged directly on the roof. As a result of the installation of photovoltaic panels on roofs of construction works belonging to the Applicant, there will be no transformation of the site. The implementation of the project will be environmentally neutral. The location of the project is located outside Natura 2000 sites. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.02.00-06-0244/17
    0 references