Photovoltaic installation at PHU “HEMBUD” (Q104917): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The material scope of the Project includes: Purchase and installation of RES installations: A photovoltaic installation with a capacity of 17,92 kWp and a surface of 106.9 m² on a building belonging to the Beneficiary in Puławy, ul. Component 6A component consisting of: Solar modules — 64. — Franger — 1; installation system — roof; Female and male sectors; — wiring — responsible for transmitting the electrical current from the modules to the w...)
(‎Created claim: summary (P836): The Project’s material scope includes: Purchase and installation of RES installations: — Photovoltaic installation with a capacity of 17.92 kWp and an area of 106.9 m² on the building belonging to the Beneficiary facility in the location of Puławy, ul. Component 6A consisting of: — photovoltaic modules – 64 pcs. — inverter – 1 pcs; mounting system – roofing system; — female and male connectors; — wiring – is responsible for transmitting electric...)
Property / summary
 
The Project’s material scope includes: Purchase and installation of RES installations: — Photovoltaic installation with a capacity of 17.92 kWp and an area of 106.9 m² on the building belonging to the Beneficiary facility in the location of Puławy, ul. Component 6A consisting of: — photovoltaic modules – 64 pcs. — inverter – 1 pcs; mounting system – roofing system; — female and male connectors; — wiring – is responsible for transmitting electrical current from modules to inverter and from inverter to electrical grid, – electrical switchboards – hermetic housings, in which the protection of the photovoltaic installation will be installed, – a monitoring system – it allows to track the current production of electricity from a photovoltaic installation and view archival data. The results of the project will be: Increased production of electricity on the RES project by 18981 kWh in the first 12 months of the RES installation and reduced CO2 emissions by 6.3070 tonnes in the first 12 months of the RES installation..All electricity obtained from the RES installation will be used by the Beneficiary. This is evidenced by the amount of energy consumed by the beneficiary in the last year of its operation – consumption of approx. 24,60 MWh/year. The project will be implemented in the first quarter. However, due to the need to secure financial resources in the budget, the applicant plans to start the procedure for selecting the contractor already in the third quarter. 2017. During the implementation of the project, the applicant will conduct an information and education campaign to organise and hold a meeting on environmental aspects of the scope of the project. The meeting will take place in elementary school or middle school – in agreement with the Directorate of the institution. (English)
Property / summary: The Project’s material scope includes: Purchase and installation of RES installations: — Photovoltaic installation with a capacity of 17.92 kWp and an area of 106.9 m² on the building belonging to the Beneficiary facility in the location of Puławy, ul. Component 6A consisting of: — photovoltaic modules – 64 pcs. — inverter – 1 pcs; mounting system – roofing system; — female and male connectors; — wiring – is responsible for transmitting electrical current from modules to inverter and from inverter to electrical grid, – electrical switchboards – hermetic housings, in which the protection of the photovoltaic installation will be installed, – a monitoring system – it allows to track the current production of electricity from a photovoltaic installation and view archival data. The results of the project will be: Increased production of electricity on the RES project by 18981 kWh in the first 12 months of the RES installation and reduced CO2 emissions by 6.3070 tonnes in the first 12 months of the RES installation..All electricity obtained from the RES installation will be used by the Beneficiary. This is evidenced by the amount of energy consumed by the beneficiary in the last year of its operation – consumption of approx. 24,60 MWh/year. The project will be implemented in the first quarter. However, due to the need to secure financial resources in the budget, the applicant plans to start the procedure for selecting the contractor already in the third quarter. 2017. During the implementation of the project, the applicant will conduct an information and education campaign to organise and hold a meeting on environmental aspects of the scope of the project. The meeting will take place in elementary school or middle school – in agreement with the Directorate of the institution. (English) / rank
 
Normal rank
Property / summary: The Project’s material scope includes: Purchase and installation of RES installations: — Photovoltaic installation with a capacity of 17.92 kWp and an area of 106.9 m² on the building belonging to the Beneficiary facility in the location of Puławy, ul. Component 6A consisting of: — photovoltaic modules – 64 pcs. — inverter – 1 pcs; mounting system – roofing system; — female and male connectors; — wiring – is responsible for transmitting electrical current from modules to inverter and from inverter to electrical grid, – electrical switchboards – hermetic housings, in which the protection of the photovoltaic installation will be installed, – a monitoring system – it allows to track the current production of electricity from a photovoltaic installation and view archival data. The results of the project will be: Increased production of electricity on the RES project by 18981 kWh in the first 12 months of the RES installation and reduced CO2 emissions by 6.3070 tonnes in the first 12 months of the RES installation..All electricity obtained from the RES installation will be used by the Beneficiary. This is evidenced by the amount of energy consumed by the beneficiary in the last year of its operation – consumption of approx. 24,60 MWh/year. The project will be implemented in the first quarter. However, due to the need to secure financial resources in the budget, the applicant plans to start the procedure for selecting the contractor already in the third quarter. 2017. During the implementation of the project, the applicant will conduct an information and education campaign to organise and hold a meeting on environmental aspects of the scope of the project. The meeting will take place in elementary school or middle school – in agreement with the Directorate of the institution. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:13, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Photovoltaic installation at PHU “HEMBUD”
Project in Poland financed by DG Regio

    Statements

    0 references
    54,617.47 zloty
    0 references
    13,108.19 Euro
    13 January 2020
    0 references
    84,026.88 zloty
    0 references
    20,166.45 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    3 July 2017
    0 references
    30 September 2018
    0 references
    PRZEDSIĘBIORSTWO HANDLOWO-USŁUGOWE "HEMBUD" SP. Z O.O.
    0 references
    0 references
    Zakres rzeczowy Projektu obejmuje: Zakup i montaż instalacji OZE: - Instalacji fotowoltaicznej o mocy na 17,92 kWp i powierzchni 106,9 m2 na budynku obiektu należącego do Beneficjenta w lokalizacji Puławy, ul. Składowa 6A , na którą składają się: - moduły fotowoltaiczne - 64 szt. - falownik - 1 szt.; system montażowy - dachowy; - konektory żeńskie i męskie; - okablowanie - odpowiada za przekazywanie prądu elektrycznego z modułów do falownika i z falownika do sieci elektrycznej, - rozdzielnice elektryczne - obudowy hermetyczne, w których zainstalowane będą zabezpieczenia instalacji fotowoltaicznej, - system monitoringu - pozwala on na śledzenie bieżącej produkcji prądu z instalacji fotowoltaicznej oraz przeglądanie danych archiwalnych. Rezultatami projektu będzie: Zwiększona produkcja energii elektrycznej na terenie realizacji projektu z OZE o 18 981 kWh w pierwszych 12 miesiącach funkcjonowania instalacji OZE oraz Zmniejszona emisja CO2 o 6,3070 ton w pierwszych 12 miesiącach funkcjonowania instalacji OZE..Cała energia elektryczna pozyskana z instalacji OZE będzie wykorzystana przez Beneficjenta. Świadczy o tym ilość energii zużywanej przez Beneficjenta w ostatnim roku jego działalności - zużycie na poziomie ok. 24,60 MWh /rok. Projekt będzie realizowany w I kw. 2018r. jednak ze względu na konieczność zabezpieczenia środków finansowych w budżecie Wnioskodawcy planuje on rozpocząć procedurę wyboru wykonawcy już w III kw. 2017r. W trakcie realizacji projektu Wnioskodawca przeprowadzi kampanię informacyjno-edukacyjną polegającą na zorganizowaniu i przeprowadzeniu spotkania nt. ekologicznych aspektów zakresu realizacji projektu. Spotkanie odbędzie się w szkole podstawowej lub gimnazjum - w uzgodnieniu z Dyrekcją placówki. (Polish)
    0 references
    The Project’s material scope includes: Purchase and installation of RES installations: — Photovoltaic installation with a capacity of 17.92 kWp and an area of 106.9 m² on the building belonging to the Beneficiary facility in the location of Puławy, ul. Component 6A consisting of: — photovoltaic modules – 64 pcs. — inverter – 1 pcs; mounting system – roofing system; — female and male connectors; — wiring – is responsible for transmitting electrical current from modules to inverter and from inverter to electrical grid, – electrical switchboards – hermetic housings, in which the protection of the photovoltaic installation will be installed, – a monitoring system – it allows to track the current production of electricity from a photovoltaic installation and view archival data. The results of the project will be: Increased production of electricity on the RES project by 18981 kWh in the first 12 months of the RES installation and reduced CO2 emissions by 6.3070 tonnes in the first 12 months of the RES installation..All electricity obtained from the RES installation will be used by the Beneficiary. This is evidenced by the amount of energy consumed by the beneficiary in the last year of its operation – consumption of approx. 24,60 MWh/year. The project will be implemented in the first quarter. However, due to the need to secure financial resources in the budget, the applicant plans to start the procedure for selecting the contractor already in the third quarter. 2017. During the implementation of the project, the applicant will conduct an information and education campaign to organise and hold a meeting on environmental aspects of the scope of the project. The meeting will take place in elementary school or middle school – in agreement with the Directorate of the institution. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.02.00-06-0124/17
    0 references