Q104904 (Q104904): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of the project is an investment related to installation, installation and commissioning of photovolt panels with a power up to 20.16 kWp in the municipality of Dzwola 82A in the wood dryer building. The project will focus on the use of energy from renewable sources, namely solar energy for own purposes related to the drying of trees. Project implementation period is from 01.07.17 to 30.04.18 The investment will be connected with inst...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 17:12, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
64,183.38 zloty
0 references
98,743.67 zloty
0 references
65.0 percent
0 references
1 July 2017
0 references
28 February 2019
0 references
LESZEK JARGIŁO - "UNILECH"
0 references
Przedmiotem projektu jest inwestycja związana z instalacją , montażem i uruchomieniem paneli fotowolt. o mocy do 20,16 kWp na terenie gminy Dzwola 82A w budynku suszarni drzewnej. Projekt będzie dotyczył wykorzystania energii ze źródeł odnawialnych, a mianowicie energii słońca na potrzeby własne związane z procesem suszenia drzewa. Okres realizacji projektu to termin od 01.07.17 do 30.04.18 Inwestycja związana będzie z montażem 72 paneli. Do przemian fotowoltaicznych wykorzyst. będą baterie (ogniwa) słoneczne składające się na panele fotowoltaiczne. Ogniwa te przede wszystkim charakteryzuje system bezobsługowy oraz dużą żywotnością , gwarantowaną na 25 lat. Fotowoltaika znajduje zastosowanie , mimo wysokich kosztów instalacji urządzeń w porównaniu z tzw. źródeł konwencjonalnych , z dwóch głównych powodów : ekologicznych oraz praktycznych ( promieniowanie słoneczne jest praktycznie wszędzie dostępne). Przedsiębiorstwo przewiduje możliwość wystąpienia ryzyk związanych przede wszystkim z opóźnieniami w instalacji paneli , ryzyk wystąpienia awarii technologicznych podczas eksploatacji urządzeń. Wnioskodawca będzie na bieżąco monitorował realizację poszczególnych etapów inwestycji oraz przeprowadzał regularne przeglądy i konserwacje urządzeń aby zminimalizować ryzyka wystąpienia sytuacji zagrażających prawidłowej realizacji projektu. Potrzeba zakupu i montażu paneli fotowoltaicznych wynika z branży jaką wykonuje firma UNILECH związaną z dużym zapotrzebowaniem na energię elektryczną i cieplną służącą w procesach suszenia drzewa. Realizacja projektu wpłynie na osiągniecie wskaźników rezultatu tj. liczba nowo utworzonych miejsc pracy : 0,05 EPC, produkcja energii z nowo wybudow. instalacji o 21,231 MWh , szacowany roczny spadek emisji CO2 o 7,0546 t/r . Projekt jest skierowany do otoczenia przedsiębiorcy ( społeczność lokalna, kontrahenci, współprac.) ( szczegółowo opisany w pkt. D.8). Projekt zakłada zastosowanie TIK ( szczegółowo opisanego w pkt. D.7.1 Biznesplanu). (Polish)
0 references
The subject of the project is an investment related to installation, installation and commissioning of photovolt panels with a power up to 20.16 kWp in the municipality of Dzwola 82A in the wood dryer building. The project will focus on the use of energy from renewable sources, namely solar energy for own purposes related to the drying of trees. Project implementation period is from 01.07.17 to 30.04.18 The investment will be connected with installation of 72 panels. For photovoltaic transformation the solar batteries (cells) consisting of photovoltaic panels will be used. These cells are characterised primarily by a maintenance-free system and a high durability, guaranteed for 25 years. Photovoltaic is used, despite the high cost of installing equipment compared to so-called conventional sources, for two main reasons: ecological and practical (solar radiation is practically available everywhere). The company foresees the possibility of risks associated primarily with delays in the installation of panels, risks of technological failures during the operation of the equipment. The applicant will monitor on an ongoing basis the implementation of the various stages of the investment and carry out regular inspections and maintenance of equipment in order to minimise the risk of situations threatening the proper implementation of the project. The need to purchase and assemble photovoltaic panels stems from the industry of UNILECH related to the high demand for electricity and heat for wood drying processes. The implementation of the project will affect the achievement of the result indicators i.e. the number of newly created jobs: 0.05 FTE, power generation from newly built installations by 21.231 MWh, estimated annual reduction in CO2 emissions by 7.0546 t/y. The project is aimed at the business environment (local society, contractors, cooperation) (detailed in point. D.8). The project assumes the use of ICT (detailed in point. D.7.1 Business Plan). (English)
17 October 2020
0 references
Identifiers
RPLU.04.02.00-06-0108/17
0 references