Construction of a photovoltaic farm in Marianka (Q104891): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of the construction of a PV power plant with an installed capacity of 0.99 MW on part of the plot No 136/2 within the Municipality of Stary Bras. The applicant has the right to the property on which he will be built up to 31.12.2035 under the lease contract of 15.04.2016. The plant will consist of high performance solar panels (3768 units with a power rating of 265 W, assuming a high minimum performance factor of 16.2 %) i...) |
(Created claim: summary (P836): The subject of the project is the construction of a photovoltaic power plant with installed capacity of 0.99 MW on part of plot No 136/2 within the Old Brus Municipality. The applicant has the right to the property on which it will be built until 31.12.2035 under the lease agreement with the date. 15.04.2016. The power plant will consist of high-performance photovoltaic panels (3768 units with a capacity of 265 W, assuming a high minimum module...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the construction of a photovoltaic power plant with installed capacity of 0.99 MW on part of plot No 136/2 within the Old Brus Municipality. The applicant has the right to the property on which it will be built until 31.12.2035 under the lease agreement with the date. 15.04.2016. The power plant will consist of high-performance photovoltaic panels (3768 units with a capacity of 265 W, assuming a high minimum module performance ratio of 16.2 %) installed on galvanised steel and aluminium frames with 36o angle angles connected to inverters with an efficiency of at least 98 %, nn/SN stations. The farm will be equipped with equipment and systems for continuous monitoring of its operation by maximising the use of the farm for energy production and providing monitoring of possible damages. This is detailed in the technical draft and the financial statement. Due to the location of the farm (one of the most sunny regions in the country) and advanced technology, the proposed power plant will be able to produce a total of approximately 1051 MWh of electricity per year. The generated electricity will be supplied to the power grid SN 15 kV via the nn/SN transformer station. The estimated life of the farm is 25 years. The technology used meets the EU ecological criteria and standards set out in the notice of the President of the PKN on the list of harmonised standards. The project will be implemented in the second half of 2018. On the day of submission of the application, the applicant has all the formal and legal documents, including the building permit and own contribution security, there is no risk of failure of the project for reasons beyond the applicant’s control. The project will be implemented on the basis of indirect payment requests. The project will result in a reduction of CO2 emissions to the atmosphere by 2 881.66 Mg. The project will have a positive impact on the following recipients: — the applicant, – electricity consumers. (English) | |||||||||||||||
Property / summary: The subject of the project is the construction of a photovoltaic power plant with installed capacity of 0.99 MW on part of plot No 136/2 within the Old Brus Municipality. The applicant has the right to the property on which it will be built until 31.12.2035 under the lease agreement with the date. 15.04.2016. The power plant will consist of high-performance photovoltaic panels (3768 units with a capacity of 265 W, assuming a high minimum module performance ratio of 16.2 %) installed on galvanised steel and aluminium frames with 36o angle angles connected to inverters with an efficiency of at least 98 %, nn/SN stations. The farm will be equipped with equipment and systems for continuous monitoring of its operation by maximising the use of the farm for energy production and providing monitoring of possible damages. This is detailed in the technical draft and the financial statement. Due to the location of the farm (one of the most sunny regions in the country) and advanced technology, the proposed power plant will be able to produce a total of approximately 1051 MWh of electricity per year. The generated electricity will be supplied to the power grid SN 15 kV via the nn/SN transformer station. The estimated life of the farm is 25 years. The technology used meets the EU ecological criteria and standards set out in the notice of the President of the PKN on the list of harmonised standards. The project will be implemented in the second half of 2018. On the day of submission of the application, the applicant has all the formal and legal documents, including the building permit and own contribution security, there is no risk of failure of the project for reasons beyond the applicant’s control. The project will be implemented on the basis of indirect payment requests. The project will result in a reduction of CO2 emissions to the atmosphere by 2 881.66 Mg. The project will have a positive impact on the following recipients: — the applicant, – electricity consumers. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the construction of a photovoltaic power plant with installed capacity of 0.99 MW on part of plot No 136/2 within the Old Brus Municipality. The applicant has the right to the property on which it will be built until 31.12.2035 under the lease agreement with the date. 15.04.2016. The power plant will consist of high-performance photovoltaic panels (3768 units with a capacity of 265 W, assuming a high minimum module performance ratio of 16.2 %) installed on galvanised steel and aluminium frames with 36o angle angles connected to inverters with an efficiency of at least 98 %, nn/SN stations. The farm will be equipped with equipment and systems for continuous monitoring of its operation by maximising the use of the farm for energy production and providing monitoring of possible damages. This is detailed in the technical draft and the financial statement. Due to the location of the farm (one of the most sunny regions in the country) and advanced technology, the proposed power plant will be able to produce a total of approximately 1051 MWh of electricity per year. The generated electricity will be supplied to the power grid SN 15 kV via the nn/SN transformer station. The estimated life of the farm is 25 years. The technology used meets the EU ecological criteria and standards set out in the notice of the President of the PKN on the list of harmonised standards. The project will be implemented in the second half of 2018. On the day of submission of the application, the applicant has all the formal and legal documents, including the building permit and own contribution security, there is no risk of failure of the project for reasons beyond the applicant’s control. The project will be implemented on the basis of indirect payment requests. The project will result in a reduction of CO2 emissions to the atmosphere by 2 881.66 Mg. The project will have a positive impact on the following recipients: — the applicant, – electricity consumers. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 17:12, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a photovoltaic farm in Marianka |
Project in Poland financed by DG Regio |
Statements
830,637.02 zloty
0 references
2,180,149.67 zloty
0 references
38.1 percent
0 references
1 April 2018
0 references
25 July 2019
0 references
LAZE LUBELSKA AGENCJA ZRÓWNOWAŻONEJ ENERGETYKI SP. Z O.O.
0 references
Przedmiotem projektu jest budowa elektrowni fotowoltaicznej o mocy zainstalowanej 0,99 MW na części działki nr 136/2 w obrębie Gminy Stary Brus. Wnioskodawca posiada prawo do nieruchomości, na której będzie wybudowana do 31.12.2035 na podstawie umowy dzierżawy z dn. 15.04.2016. Elektrownia będzie się składać z wysokowydajnych paneli fotowoltaicznych (3768 szt. o mocy 265 W, zakładając wysoki minimalny współczynnik skuteczności modułu na poziomie 16,2%) zainstalowanych na stelażach wykonanych z ocynkowanej stali i aluminium o kacie nachylenia 36o, podłączonych do inwerterów o sprawności co najmniej 98%, stacji nn/SN. Farma będzie wyposażona w urządzenia i systemy do ciągłego monitoringu jej pracy maksymalnie wykorzystując farmę do produkcji energii oraz zapewniając monitoring ewentualnych uszkodzeń. Szczegółowo powyższe przedstawiono w projekcie technicznym oraz kosztorysie. Ze względu na położenie farmy (jeden z najbardziej nasłonecznionych regionów w kraju) oraz zaawansowaną technologię projektowana elektrownia będzie w stanie wyprodukować w ciągu roku łącznie około 1051 MWh energii elektr. Wytworzona energia elektr. będzie dostarczana do sieci energetycznej SN 15 kV poprzez stację transformatorową nn/SN. Przewidywany czas eksploatacji farmy to 25 lat. Zastosowana technologia spełnia kryteria i normy ekologiczne UE określone w obwieszczeniach Prezesa PKN w sprawie wykazu norm zharmonizowanych. Projekt będzie realizowany w II połowie 2018 r. Na dzień złożenia wniosku Wnioskodawca posiada wszystkie formalno-prawne dokumenty, włącznie z pozwoleniem na budowę i zabezpieczeniem wkładu własnego, nie występuje ryzyko nie zrealizowania projektu z przyczyn niezależnych od Wnioskodawcy. Projekt będzie realizowany na zasadzie pośrednich wniosków o płatność. W wyniku realizacji projektu nastąpi zmniejszenie emisji CO2 do atmosfery o 2 881,66 Mg. Projekt będzie miał pozytywny wpływ na następujących odbiorców: - wnioskodawca, - odbiorcy energii elektrycznej. (Polish)
0 references
The subject of the project is the construction of a photovoltaic power plant with installed capacity of 0.99 MW on part of plot No 136/2 within the Old Brus Municipality. The applicant has the right to the property on which it will be built until 31.12.2035 under the lease agreement with the date. 15.04.2016. The power plant will consist of high-performance photovoltaic panels (3768 units with a capacity of 265 W, assuming a high minimum module performance ratio of 16.2 %) installed on galvanised steel and aluminium frames with 36o angle angles connected to inverters with an efficiency of at least 98 %, nn/SN stations. The farm will be equipped with equipment and systems for continuous monitoring of its operation by maximising the use of the farm for energy production and providing monitoring of possible damages. This is detailed in the technical draft and the financial statement. Due to the location of the farm (one of the most sunny regions in the country) and advanced technology, the proposed power plant will be able to produce a total of approximately 1051 MWh of electricity per year. The generated electricity will be supplied to the power grid SN 15 kV via the nn/SN transformer station. The estimated life of the farm is 25 years. The technology used meets the EU ecological criteria and standards set out in the notice of the President of the PKN on the list of harmonised standards. The project will be implemented in the second half of 2018. On the day of submission of the application, the applicant has all the formal and legal documents, including the building permit and own contribution security, there is no risk of failure of the project for reasons beyond the applicant’s control. The project will be implemented on the basis of indirect payment requests. The project will result in a reduction of CO2 emissions to the atmosphere by 2 881.66 Mg. The project will have a positive impact on the following recipients: — the applicant, – electricity consumers. (English)
17 October 2020
0 references
Identifiers
RPLU.04.02.00-06-0088/17
0 references