The production of energy from RES in ARTECH Sp. z o.o (Q104856): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The investment carried out under this project will be located at ul. 111 A-B M. Biała Podl, powiat m. Biała Podlaska, Lubelskie province. As a result of the project, a photovoltaic installation with a total power generation of 18.1 kW, using solar energy for electricity production in the grid, will be constructed. The installation will convert solar energy directly — solar radiation — to electricity. To this end, the installation of photovolta...)
(‎Created claim: summary (P836): The investment under this project will be located at the company’s headquarters at ul. Brzeska 111 A-B M. Biała podl, Biała Podlaska district, Lublin Voivodeship. As a result of the project, a photovoltaic installation with a total power of 18.1 kW using solar energy to produce electricity in grid-connection system will be created. The installation will deal with the direct conversion of solar energy – solar radiation – into electricity. For thi...)
Property / summary
 
The investment under this project will be located at the company’s headquarters at ul. Brzeska 111 A-B M. Biała podl, Biała Podlaska district, Lublin Voivodeship. As a result of the project, a photovoltaic installation with a total power of 18.1 kW using solar energy to produce electricity in grid-connection system will be created. The installation will deal with the direct conversion of solar energy – solar radiation – into electricity. For this purpose, it is necessary to install photovoltaic cells, which are connected in series to achieve the necessary voltage, while simultaneously gain the necessary power. The PV installation will also include the support structure, the adjustment and control system, the devices converting DC into alternating current. As part of the project, the installation of photovoltaic modules is planned. Photovoltaic modules will be mounted on frames made in stationary version, placed directly on the roof of the building. They will be given an appropriate inclination angle in terms of the direction of sunlight resulting from the geographical location of the installation. The frame structure, consisting of horizontal and vertical frames, support profiles and mounting elements (connecting elements), will be made of high quality aluminium and steel materials. It will have a proven static – durability of the structure. In addition to photovoltaic modules, one of the key elements of the PV installation is the inverter. They connect solar panels to the electrical grid. Their main task is to convert the DC, produced by the photovoltaic module, into alternating current with network parameters. (English)
Property / summary: The investment under this project will be located at the company’s headquarters at ul. Brzeska 111 A-B M. Biała podl, Biała Podlaska district, Lublin Voivodeship. As a result of the project, a photovoltaic installation with a total power of 18.1 kW using solar energy to produce electricity in grid-connection system will be created. The installation will deal with the direct conversion of solar energy – solar radiation – into electricity. For this purpose, it is necessary to install photovoltaic cells, which are connected in series to achieve the necessary voltage, while simultaneously gain the necessary power. The PV installation will also include the support structure, the adjustment and control system, the devices converting DC into alternating current. As part of the project, the installation of photovoltaic modules is planned. Photovoltaic modules will be mounted on frames made in stationary version, placed directly on the roof of the building. They will be given an appropriate inclination angle in terms of the direction of sunlight resulting from the geographical location of the installation. The frame structure, consisting of horizontal and vertical frames, support profiles and mounting elements (connecting elements), will be made of high quality aluminium and steel materials. It will have a proven static – durability of the structure. In addition to photovoltaic modules, one of the key elements of the PV installation is the inverter. They connect solar panels to the electrical grid. Their main task is to convert the DC, produced by the photovoltaic module, into alternating current with network parameters. (English) / rank
 
Normal rank
Property / summary: The investment under this project will be located at the company’s headquarters at ul. Brzeska 111 A-B M. Biała podl, Biała Podlaska district, Lublin Voivodeship. As a result of the project, a photovoltaic installation with a total power of 18.1 kW using solar energy to produce electricity in grid-connection system will be created. The installation will deal with the direct conversion of solar energy – solar radiation – into electricity. For this purpose, it is necessary to install photovoltaic cells, which are connected in series to achieve the necessary voltage, while simultaneously gain the necessary power. The PV installation will also include the support structure, the adjustment and control system, the devices converting DC into alternating current. As part of the project, the installation of photovoltaic modules is planned. Photovoltaic modules will be mounted on frames made in stationary version, placed directly on the roof of the building. They will be given an appropriate inclination angle in terms of the direction of sunlight resulting from the geographical location of the installation. The frame structure, consisting of horizontal and vertical frames, support profiles and mounting elements (connecting elements), will be made of high quality aluminium and steel materials. It will have a proven static – durability of the structure. In addition to photovoltaic modules, one of the key elements of the PV installation is the inverter. They connect solar panels to the electrical grid. Their main task is to convert the DC, produced by the photovoltaic module, into alternating current with network parameters. (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:07, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
The production of energy from RES in ARTECH Sp. z o.o
Project in Poland financed by DG Regio

    Statements

    0 references
    53,464.31 zloty
    0 references
    12,831.43 Euro
    13 January 2020
    0 references
    82,252.8 zloty
    0 references
    19,740.67 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 January 2018
    0 references
    30 October 2018
    0 references
    ARTECH SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Inwestycja realizowana w ramach niniejszego projektu zlokalizowana będzie w siedzibie firmy przy ul. Brzeskiej 111 A-B M. Biała Podl, powiat m. Biała Podlaska, woj. lubelskie. W wyniku realizacji projektu powstanie instalacja fotowoltaiczna o łącznej mocy 18,1 kW wykorzystująca energię słoneczną do produkcji energii elektr. w systemie grid- connected. Instalacja Będzie zajmowała się bezpośrednią przemianą energii słonecznej - promieniowania słonecznego - na energię elektryczną. W tym celu konieczna jest instalacja ogniw fotowoltaicznych, które połączone ze sobą szeregowo, uzyskują odpowiednie napięcie, natomiast równolegle uzyskują niezbędną moc. W skład instalacji PV będzie również wchodziła konstrukcja wspierająca, system regulacji i kontroli, urządzenia przekształcające prąd stały w prąd zmienny. W ramach projektu planowany jest montaż modułów fotowoltaicznych. Moduły fotowoltaiczne będą zamontowane na stelażach wykonanych w wersji stacjonarnej, posadowionych bezpośrednio na dachu budynku. Zostanie im nadany odpowiedni kąt nachylenia pod względem kierunku padania promieni słonecznych, wynikający z geograficznego położenia instalacji. Konstrukcja stelaży, składająca się z ram poziomych i pionowych, profili nośnych oraz elementów mocujących (łączących), zostanie wykonana z wysokiej jakości materiałów aluminiowych i stalowych. Będzie ona posiadać sprawdzoną statykę - wytrzymałość konstrukcji. Obok modułów fotowoltaicznych, jednym z kluczowych elementów instalacji PV jest inwerter. Łączą one panele słoneczne z siecią elektryczną. Ich głównym zadaniem jest konwersja prądu stałego, wytworzonego przez moduł fotowoltaiczny, na prąd przemienny o parametrach sieci. (Polish)
    0 references
    The investment under this project will be located at the company’s headquarters at ul. Brzeska 111 A-B M. Biała podl, Biała Podlaska district, Lublin Voivodeship. As a result of the project, a photovoltaic installation with a total power of 18.1 kW using solar energy to produce electricity in grid-connection system will be created. The installation will deal with the direct conversion of solar energy – solar radiation – into electricity. For this purpose, it is necessary to install photovoltaic cells, which are connected in series to achieve the necessary voltage, while simultaneously gain the necessary power. The PV installation will also include the support structure, the adjustment and control system, the devices converting DC into alternating current. As part of the project, the installation of photovoltaic modules is planned. Photovoltaic modules will be mounted on frames made in stationary version, placed directly on the roof of the building. They will be given an appropriate inclination angle in terms of the direction of sunlight resulting from the geographical location of the installation. The frame structure, consisting of horizontal and vertical frames, support profiles and mounting elements (connecting elements), will be made of high quality aluminium and steel materials. It will have a proven static – durability of the structure. In addition to photovoltaic modules, one of the key elements of the PV installation is the inverter. They connect solar panels to the electrical grid. Their main task is to convert the DC, produced by the photovoltaic module, into alternating current with network parameters. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.02.00-06-0034/17
    0 references