(Removed claim: summary (P836): P. assumes: The purchase and installation of 117 solar cable installations (flat panel 2-panel — 63 units, 3 panel 43, 4 panel — 11 units), Purchase and installation of 33 biomass furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), UDS for submission of applications, performance of technical documentation for the needs of P., Service delivery service. 600 inhabitants of GH in 150 sites. The result is: Additional renewable generation capa...) |
(Created claim: summary (P836): P. assumes: Purchase and assembly of 117 solar colls installations (flat type 2-panel – 63,3 panels – 43,4-panel -11 pcs), Purchase and assembly of 33 biomass-fired furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), the service of the development of SW for the purpose of submitting applications, the service of technical documentation for the needs of P. 600 inhabitants of GH in 150 buildings. The result is: Additional capacity to generate...) |
||||||||||||||
Property / summary | |||||||||||||||
P. assumes: Purchase and assembly of 117 solar colls installations (flat type 2-panel – 63,3 panels – 43,4-panel -11 pcs), Purchase and assembly of 33 biomass-fired furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), the service of the development of SW for the purpose of submitting applications, the service of technical documentation for the needs of P. 600 inhabitants of GH in 150 buildings. The result is: Additional capacity to generate energy from renewable sources by installing installations for heating. CWU with a total capacity of 1,01 MW (0,38 MW-collectors 0.63 MW-piece), Estimated annual decrease in greenhouse gas emissions in the amount of 372,3tCO2/year, The production of heat from newly built/new generation capacity of RES installations in the amount of 677MWht/year. The main target P. is to increase the use of RES in the GH area. The objectives of the detail: OBJECTIVE 1: Dissemination of clean energy production technology among residents through the overhead assembly of RES in the commune of the share of energy from the ZO. OBJECTIVE 3: Reduction of finan burdens. local community resulting from energy charges due to the creation of individual. installation benefits. IT’S THE RES. On the basis of the PROGRAM OF THE PACKAGING PROGRAM FOR the Lublin STREF for GmHanna, there was no exceedance of at least one acceptable or target level for substances subject to air quality assessment. However, the measures envisaged in P. contribute to the implementation of corrective actions aimed at improving air quality by reducing PM10 emissions from individual heating systems through the installation of solar collectors and furnaces for biomass in India, as well as promotional and educational activities. (English) | |||||||||||||||
Property / summary: P. assumes: Purchase and assembly of 117 solar colls installations (flat type 2-panel – 63,3 panels – 43,4-panel -11 pcs), Purchase and assembly of 33 biomass-fired furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), the service of the development of SW for the purpose of submitting applications, the service of technical documentation for the needs of P. 600 inhabitants of GH in 150 buildings. The result is: Additional capacity to generate energy from renewable sources by installing installations for heating. CWU with a total capacity of 1,01 MW (0,38 MW-collectors 0.63 MW-piece), Estimated annual decrease in greenhouse gas emissions in the amount of 372,3tCO2/year, The production of heat from newly built/new generation capacity of RES installations in the amount of 677MWht/year. The main target P. is to increase the use of RES in the GH area. The objectives of the detail: OBJECTIVE 1: Dissemination of clean energy production technology among residents through the overhead assembly of RES in the commune of the share of energy from the ZO. OBJECTIVE 3: Reduction of finan burdens. local community resulting from energy charges due to the creation of individual. installation benefits. IT’S THE RES. On the basis of the PROGRAM OF THE PACKAGING PROGRAM FOR the Lublin STREF for GmHanna, there was no exceedance of at least one acceptable or target level for substances subject to air quality assessment. However, the measures envisaged in P. contribute to the implementation of corrective actions aimed at improving air quality by reducing PM10 emissions from individual heating systems through the installation of solar collectors and furnaces for biomass in India, as well as promotional and educational activities. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: P. assumes: Purchase and assembly of 117 solar colls installations (flat type 2-panel – 63,3 panels – 43,4-panel -11 pcs), Purchase and assembly of 33 biomass-fired furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), the service of the development of SW for the purpose of submitting applications, the service of technical documentation for the needs of P. 600 inhabitants of GH in 150 buildings. The result is: Additional capacity to generate energy from renewable sources by installing installations for heating. CWU with a total capacity of 1,01 MW (0,38 MW-collectors 0.63 MW-piece), Estimated annual decrease in greenhouse gas emissions in the amount of 372,3tCO2/year, The production of heat from newly built/new generation capacity of RES installations in the amount of 677MWht/year. The main target P. is to increase the use of RES in the GH area. The objectives of the detail: OBJECTIVE 1: Dissemination of clean energy production technology among residents through the overhead assembly of RES in the commune of the share of energy from the ZO. OBJECTIVE 3: Reduction of finan burdens. local community resulting from energy charges due to the creation of individual. installation benefits. IT’S THE RES. On the basis of the PROGRAM OF THE PACKAGING PROGRAM FOR the Lublin STREF for GmHanna, there was no exceedance of at least one acceptable or target level for substances subject to air quality assessment. However, the measures envisaged in P. contribute to the implementation of corrective actions aimed at improving air quality by reducing PM10 emissions from individual heating systems through the installation of solar collectors and furnaces for biomass in India, as well as promotional and educational activities. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 16:58, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ECO — ENERGY IN HANNA MUNICIPALITY — PHASE II |
Project in Poland financed by DG Regio |
Statements
1,404,817.09 zloty
0 references
1,652,726.0 zloty
0 references
85.0 percent
0 references
26 April 2016
0 references
30 November 2018
0 references
GMINA HANNA
0 references
P. zakłada: Zakup i montaż 117 szt. instalacji kolek. słonecznych (typ płaski 2-panelowe - 63 szt.,3 panelowe - 43 szt.,4-panelowe -11 szt.), Zakup i montaż 33 szt. pieców c.o. opalanych biomasą (2 -10kW, 12-15kW, 13-20kW, 2-25kW, 4- 30kW), Usługę opracowania SW na potrzeby złożenia aplikacji, Usługę wykonania dokumentacji techn. na potrzeby P., Usługę wykonania serwisu www na potrzeby P., Usługę pełnienia nadzoru inwestorskiego, Usługę wykonania i montażu tablic inform., oznakowania instalacji, kampanii prom., Usługa zarządzania P. - menedżer, Koszty osobowe Beneficjenta - osób zaangażowanych w obsługę P. GRUPĄ DOCELOWĄ korzystających z efektów realizacji P. jest ok. 600 mieszkańców GH w 150 obiektach. REZULTATEM jest: Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych uzyskana poprzez montaż instalacji do podgrz. CWU o sum. mocy 1,01MW (0,38MW-kolektory 0,63MW-piece), Szacowany roczny spadek emisji gazów cieplarnianych w ilości 372,3tCO2/rok, Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE w ilości 677MWht/rok. GŁÓWNYM CELEM P. jest zwiększenie stosowania OZE na terenie GH. Cele szczegół.: CEL 1: Upowszechnienie technologii wytwarzania czystej energii wśród mieszk. poprzez powsz. montaż OZE na terenie gminy udziału energii ze ZO. CEL 3: Zmniejszenie obciążeń finan. społecz. lokalnej wynikających z opłat za ener. dzięki utworzeniu indywid. instalacji wykorzyst. OZE. Na podstawie PROGRAMU OCHRONY POWIETRZA DLA STREFY LUBELSKIEJ dla GmHanna nie stwierdzono przekroczenie choćby jednego poziomu dopuszczalnego lub docelowego w odniesieniu do substancji podlegających ocenie jakości powietrza. Jednakże działania przewidziane w P. przyczyniają się do realizacji działań naprawczych mających na celu poprawę stanu jakości powietrza poprzez ograniczenie emisji pyłu PM10 z indyw. systemów grzewczych dzięki instalacji kolektorów słonecznych i pieców na biomasę u odb. indyw. oraz działania promocyjne i edukacyjne. (Polish)
0 references
P. assumes: Purchase and assembly of 117 solar colls installations (flat type 2-panel – 63,3 panels – 43,4-panel -11 pcs), Purchase and assembly of 33 biomass-fired furnaces (2-10 kW, 12-15 kW, 13-20 kW, 2-25 kW, 4-30 kW), the service of the development of SW for the purpose of submitting applications, the service of technical documentation for the needs of P. 600 inhabitants of GH in 150 buildings. The result is: Additional capacity to generate energy from renewable sources by installing installations for heating. CWU with a total capacity of 1,01 MW (0,38 MW-collectors 0.63 MW-piece), Estimated annual decrease in greenhouse gas emissions in the amount of 372,3tCO2/year, The production of heat from newly built/new generation capacity of RES installations in the amount of 677MWht/year. The main target P. is to increase the use of RES in the GH area. The objectives of the detail: OBJECTIVE 1: Dissemination of clean energy production technology among residents through the overhead assembly of RES in the commune of the share of energy from the ZO. OBJECTIVE 3: Reduction of finan burdens. local community resulting from energy charges due to the creation of individual. installation benefits. IT’S THE RES. On the basis of the PROGRAM OF THE PACKAGING PROGRAM FOR the Lublin STREF for GmHanna, there was no exceedance of at least one acceptable or target level for substances subject to air quality assessment. However, the measures envisaged in P. contribute to the implementation of corrective actions aimed at improving air quality by reducing PM10 emissions from individual heating systems through the installation of solar collectors and furnaces for biomass in India, as well as promotional and educational activities. (English)
17 October 2020
0 references
Identifiers
RPLU.04.01.00-06-0299/16
0 references