(‎Removed claim: summary (P836): The primary task of the project is to replace the existing fossil fuel production from renewable raw materials. 491 solar collectors will be installed (239 panel 3,1 KW, 210 panel with 4,7 KW, 42 four panel 6,2 TA) and three open solar installations with a power of 2,32 KW. The total installed capacity of the equipment will be 1.98 MW. The estimated decrease in CO2 emissions will be 274,32 tonnes per year. All installations will be located on...)
(‎Created claim: summary (P836): The main task of the project is to replace the existing production of fossil energy from renewable sources. There will be 491 solar collector installations (239 two-panel with a capacity of 3.1 KW, 210 three-panel with 4.7 KW, 42 four panels with a capacity of 6.2 KW) and three open photovoltaic installations with a capacity of 2.32 KW. The total installed power of the devices will be 1,98 MW. The estimated reduction in CO2 emissions to the atmo...)
Property / summary
 
The main task of the project is to replace the existing production of fossil energy from renewable sources. There will be 491 solar collector installations (239 two-panel with a capacity of 3.1 KW, 210 three-panel with 4.7 KW, 42 four panels with a capacity of 6.2 KW) and three open photovoltaic installations with a capacity of 2.32 KW. The total installed power of the devices will be 1,98 MW. The estimated reduction in CO2 emissions to the atmosphere will be 274.32 tonnes per year. All installations will be located on rooftops and facade of private dwellings. Their height shall not exceed 3 m from the surface of the roof. A project website will be created with the following elements: project description, installation manuals, RES technology information, electronic communication forms. It also implements an intelligent energy management system based on ICT technologies that deal with measurement, operation and monitoring of installed devices (on-line connection). The project will be useful for project stakeholders. The municipality will own new RES infrastructure, which will improve the quality of municipal services and increase their availability. The participants of the project will use installations located in residential facilities, which will reduce maintenance costs, as well as save time by minimising the operation of the installation. The environmental impact will be important for all stakeholders in the project, which will contribute to reducing harmful substances in the air. By reducing “low” emissions from domestic fireplaces, including in particular PM10 particulate matter, whose overnormative 24-hour concentrations were found in the Lublin zone, the project contributes to the realisation of the objectives of the “Air Protection Programme for the Lublin Zone” (it was classified as zone C and thus required to develop the Programme). (English)
Property / summary: The main task of the project is to replace the existing production of fossil energy from renewable sources. There will be 491 solar collector installations (239 two-panel with a capacity of 3.1 KW, 210 three-panel with 4.7 KW, 42 four panels with a capacity of 6.2 KW) and three open photovoltaic installations with a capacity of 2.32 KW. The total installed power of the devices will be 1,98 MW. The estimated reduction in CO2 emissions to the atmosphere will be 274.32 tonnes per year. All installations will be located on rooftops and facade of private dwellings. Their height shall not exceed 3 m from the surface of the roof. A project website will be created with the following elements: project description, installation manuals, RES technology information, electronic communication forms. It also implements an intelligent energy management system based on ICT technologies that deal with measurement, operation and monitoring of installed devices (on-line connection). The project will be useful for project stakeholders. The municipality will own new RES infrastructure, which will improve the quality of municipal services and increase their availability. The participants of the project will use installations located in residential facilities, which will reduce maintenance costs, as well as save time by minimising the operation of the installation. The environmental impact will be important for all stakeholders in the project, which will contribute to reducing harmful substances in the air. By reducing “low” emissions from domestic fireplaces, including in particular PM10 particulate matter, whose overnormative 24-hour concentrations were found in the Lublin zone, the project contributes to the realisation of the objectives of the “Air Protection Programme for the Lublin Zone” (it was classified as zone C and thus required to develop the Programme). (English) / rank
 
Normal rank
Property / summary: The main task of the project is to replace the existing production of fossil energy from renewable sources. There will be 491 solar collector installations (239 two-panel with a capacity of 3.1 KW, 210 three-panel with 4.7 KW, 42 four panels with a capacity of 6.2 KW) and three open photovoltaic installations with a capacity of 2.32 KW. The total installed power of the devices will be 1,98 MW. The estimated reduction in CO2 emissions to the atmosphere will be 274.32 tonnes per year. All installations will be located on rooftops and facade of private dwellings. Their height shall not exceed 3 m from the surface of the roof. A project website will be created with the following elements: project description, installation manuals, RES technology information, electronic communication forms. It also implements an intelligent energy management system based on ICT technologies that deal with measurement, operation and monitoring of installed devices (on-line connection). The project will be useful for project stakeholders. The municipality will own new RES infrastructure, which will improve the quality of municipal services and increase their availability. The participants of the project will use installations located in residential facilities, which will reduce maintenance costs, as well as save time by minimising the operation of the installation. The environmental impact will be important for all stakeholders in the project, which will contribute to reducing harmful substances in the air. By reducing “low” emissions from domestic fireplaces, including in particular PM10 particulate matter, whose overnormative 24-hour concentrations were found in the Lublin zone, the project contributes to the realisation of the objectives of the “Air Protection Programme for the Lublin Zone” (it was classified as zone C and thus required to develop the Programme). (English) / qualifier
 
point in time: 17 October 2020
Timestamp+2020-10-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:58, 17 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Clean energy in the commune of Luk II
Project in Poland financed by DG Regio

    Statements

    0 references
    3,832,395.0 zloty
    0 references
    919,774.80 Euro
    13 January 2020
    0 references
    4,508,700.0 zloty
    0 references
    1,082,088.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 April 2016
    0 references
    29 November 2019
    0 references
    GMINA ŁUKÓW
    0 references
    0 references
    Podstawowym zadaniem projektu jest zastąpienie istniejącej produkcji energii z surowców kopalnych produkcją ze źródeł odnawialnych. Zrealizowanych zostanie 491 instalacji kolektorów słonecznych (239 dwupanelowych o mocy 3,1 KW, 210 trzypanelowych o mocy 4,7 KW, 42 czteropanelowe o mocy 6,2 KW) oraz trzy otwarte instalacje fotowoltaiczne o mocy 2,32 KW. Całkowita moc zainstalowana urządzeń wyniesie 1,98 MW. Szacowany spadek emisji CO2 do atmosfery wyniesie 274,32 tony na rok. Wszystkie instalacje będą zlokalizowane na dachach i elewacja prywatnych domów mieszkalnych. Ich wysokość nie przekroczy 3 m od powierzchni dachu. Utworzona zostanie strona internetowa projektu, która będzie zawierać następujące elementy: opis projektu, instrukcje obsługi instalacji, informacje o technologiach OZE, formularze do komunikacji elektronicznej. Wdraża również inteligentny system zarządzania energią w oparciu o technologie TIK, które dotyczą pomiaru, obsługi i monitoringu zainstalowanych urządzeń (połączenie on-line). Przedsięwzięcie będzie użyteczne dla interesariuszy projektu. Gmina będzie właścicielem nowej infrastruktury OZE, która wpłynie na poprawę jakości świadczonych usług komunalnych oraz zwiększy ich dostępność. Uczestnicy projektu wykorzystywać będą instalacje zlokalizowane w obiektach mieszkalnych, co wpłynie na obniżenie kosztów utrzymania, a także wpłynie na oszczędność czasu poprzez zminimalizowanie czynności obsługi instalacji. Dla wszystkich interesariuszy projektu istotny będzie efekt ekologiczny, który przyczyni się do zmniejszenia substancji szkodliwych w powietrzu. Poprzez ograniczenie emisji "niskiej" z palenisk domowych, w tym w szczególności pyłu zawieszonego PM10, którego ponadnormatywne stężenia 24-godzinne stwierdzono w strefie lubelskiej, projekt przyczynia się do realizacji założeń "Programu ochrony powietrza dla strefy lubelskiej" (została zakwalifikowana jako strefa C, a tym samym zobligowana do opracowania Programu). (Polish)
    0 references
    The main task of the project is to replace the existing production of fossil energy from renewable sources. There will be 491 solar collector installations (239 two-panel with a capacity of 3.1 KW, 210 three-panel with 4.7 KW, 42 four panels with a capacity of 6.2 KW) and three open photovoltaic installations with a capacity of 2.32 KW. The total installed power of the devices will be 1,98 MW. The estimated reduction in CO2 emissions to the atmosphere will be 274.32 tonnes per year. All installations will be located on rooftops and facade of private dwellings. Their height shall not exceed 3 m from the surface of the roof. A project website will be created with the following elements: project description, installation manuals, RES technology information, electronic communication forms. It also implements an intelligent energy management system based on ICT technologies that deal with measurement, operation and monitoring of installed devices (on-line connection). The project will be useful for project stakeholders. The municipality will own new RES infrastructure, which will improve the quality of municipal services and increase their availability. The participants of the project will use installations located in residential facilities, which will reduce maintenance costs, as well as save time by minimising the operation of the installation. The environmental impact will be important for all stakeholders in the project, which will contribute to reducing harmful substances in the air. By reducing “low” emissions from domestic fireplaces, including in particular PM10 particulate matter, whose overnormative 24-hour concentrations were found in the Lublin zone, the project contributes to the realisation of the objectives of the “Air Protection Programme for the Lublin Zone” (it was classified as zone C and thus required to develop the Programme). (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.01.00-06-0258/16
    0 references