(Removed claim: summary (P836): The project (p.) involves the installation of 104 solar glass (69 units). 2 panel 3.4 kW each and 35 units 3 kW (s) each) for the kill. CWUs with a total capacity of 0.41 MW only on the roof or on the façade. It also provides for the design and implementation of the website. Total number of bellows. The beneficiaries (GRUPA DOCELOV GROUP) will be responsible for the implementation of Ms P. 400 in 104 sites. The main customs of P. is the increa...) |
(Created claim: summary (P836): The project (P.) assumes installation of 104 units. set of solar panels (69 pcs. 2 panels with 3.4 kW each and 35 pcs. 3-panels with a power of 5.1 kW each) in the object. privat. for warming. CWU with a total power of 0,41 MW placed only on the roof or on the facade. P. also provides for the design and execution of the Internet portal, which will perform the functions of educator, promoc. and offers on-line services, SW execution service, Proje...) |
||||||||||||||
Property / summary | |||||||||||||||
The project (P.) assumes installation of 104 units. set of solar panels (69 pcs. 2 panels with 3.4 kW each and 35 pcs. 3-panels with a power of 5.1 kW each) in the object. privat. for warming. CWU with a total power of 0,41 MW placed only on the roof or on the facade. P. also provides for the design and execution of the Internet portal, which will perform the functions of educator, promoc. and offers on-line services, SW execution service, Project Promotion, Supervision Inspector’s Service. Total number of bellows. GW benefiting (target GRUPA) from the results of the implementation of P. will amount to approx. 400 in 104 objects. The main purpose of P. is to increase the use of RES in GW. The objectives of the detail: OBJECTIVE 1: Dissemination of clean energy technology among residents through the general assembly of RES in the municipality of CEL 2: Reducing air pollutants atmosf. by reducing greenhouse gas emissions to the atmosphere CEL 3: Reduction of the financial burden. inhabitant. through roots. IT’S THE RES. RESULTS: Additional ability to generate energy from RES by installing installations for heating. CWU with a total capacity of 0,41 MW, Estimated annual decrease in greenhouse gas emissions-59.67 tCO2/year, The production of heat from newly built/new generation capacity of RES-174.96 MWht/year. P. pursues the priority objective. 4 as well as the target. RPO WL. P. entry. to the objectives of OPERAC. (2.5; 3.6; 4.5) indication. in SRWL 2014-2020. IT’S A GW. On the basis of the PROGRAM OF THE PARTICULAR FOR the Lublin STREFA, GW did not exceed even one acceptable or target level for substances subject to air quality assessment. However, the measures provided for in P. contribute to the implementation of corrective actions aimed at improving air quality contained in the PROGRAM OF THE PROGRAM OF THE STREF OF THE Lublin STREFA by reducing PM10 emissions from individual heating systems thanks to solar collector installations in individual recipients, as well as promotional and educational activities. (English) | |||||||||||||||
Property / summary: The project (P.) assumes installation of 104 units. set of solar panels (69 pcs. 2 panels with 3.4 kW each and 35 pcs. 3-panels with a power of 5.1 kW each) in the object. privat. for warming. CWU with a total power of 0,41 MW placed only on the roof or on the facade. P. also provides for the design and execution of the Internet portal, which will perform the functions of educator, promoc. and offers on-line services, SW execution service, Project Promotion, Supervision Inspector’s Service. Total number of bellows. GW benefiting (target GRUPA) from the results of the implementation of P. will amount to approx. 400 in 104 objects. The main purpose of P. is to increase the use of RES in GW. The objectives of the detail: OBJECTIVE 1: Dissemination of clean energy technology among residents through the general assembly of RES in the municipality of CEL 2: Reducing air pollutants atmosf. by reducing greenhouse gas emissions to the atmosphere CEL 3: Reduction of the financial burden. inhabitant. through roots. IT’S THE RES. RESULTS: Additional ability to generate energy from RES by installing installations for heating. CWU with a total capacity of 0,41 MW, Estimated annual decrease in greenhouse gas emissions-59.67 tCO2/year, The production of heat from newly built/new generation capacity of RES-174.96 MWht/year. P. pursues the priority objective. 4 as well as the target. RPO WL. P. entry. to the objectives of OPERAC. (2.5; 3.6; 4.5) indication. in SRWL 2014-2020. IT’S A GW. On the basis of the PROGRAM OF THE PARTICULAR FOR the Lublin STREFA, GW did not exceed even one acceptable or target level for substances subject to air quality assessment. However, the measures provided for in P. contribute to the implementation of corrective actions aimed at improving air quality contained in the PROGRAM OF THE PROGRAM OF THE STREF OF THE Lublin STREFA by reducing PM10 emissions from individual heating systems thanks to solar collector installations in individual recipients, as well as promotional and educational activities. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project (P.) assumes installation of 104 units. set of solar panels (69 pcs. 2 panels with 3.4 kW each and 35 pcs. 3-panels with a power of 5.1 kW each) in the object. privat. for warming. CWU with a total power of 0,41 MW placed only on the roof or on the facade. P. also provides for the design and execution of the Internet portal, which will perform the functions of educator, promoc. and offers on-line services, SW execution service, Project Promotion, Supervision Inspector’s Service. Total number of bellows. GW benefiting (target GRUPA) from the results of the implementation of P. will amount to approx. 400 in 104 objects. The main purpose of P. is to increase the use of RES in GW. The objectives of the detail: OBJECTIVE 1: Dissemination of clean energy technology among residents through the general assembly of RES in the municipality of CEL 2: Reducing air pollutants atmosf. by reducing greenhouse gas emissions to the atmosphere CEL 3: Reduction of the financial burden. inhabitant. through roots. IT’S THE RES. RESULTS: Additional ability to generate energy from RES by installing installations for heating. CWU with a total capacity of 0,41 MW, Estimated annual decrease in greenhouse gas emissions-59.67 tCO2/year, The production of heat from newly built/new generation capacity of RES-174.96 MWht/year. P. pursues the priority objective. 4 as well as the target. RPO WL. P. entry. to the objectives of OPERAC. (2.5; 3.6; 4.5) indication. in SRWL 2014-2020. IT’S A GW. On the basis of the PROGRAM OF THE PARTICULAR FOR the Lublin STREFA, GW did not exceed even one acceptable or target level for substances subject to air quality assessment. However, the measures provided for in P. contribute to the implementation of corrective actions aimed at improving air quality contained in the PROGRAM OF THE PROGRAM OF THE STREF OF THE Lublin STREFA by reducing PM10 emissions from individual heating systems thanks to solar collector installations in individual recipients, as well as promotional and educational activities. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 16:57, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ORGANIC COMMUNE |
Project in Poland financed by DG Regio |
Statements
934,388.0 zloty
0 references
1,099,280.0 zloty
0 references
85.0 percent
0 references
16 May 2016
0 references
30 November 2018
0 references
GMINA WĄWOLNICA
0 references
Projekt (P.) zakłada instalację 104 szt. zestaw. kol. słonecznych (69 szt. 2 panelowych o mocy 3,4 kW każdy i 35 szt. 3-panelowych o mocy 5,1 kW każdy) w obiekt. prywat. do podgrz. CWU o sum. mocy 0,41MW posadowione wyłącznie na dachu lub na elewacji. P. przewiduje również zaprojektowanie i wykon. portalu internet., kt będzie pełnił funkcje eduk., promoc. oraz oferował usługi on-line, Usługę wykonania SW, Promocję projektu, Usługę inspektora nadzoru. Łączna liczba mieszk. GW korzystających (GRUPA DOCELOWA) z efektów realizacji P. wyniesie ok. 400 w 104 obiektach. GŁÓWNYM CELEM P. jest zwiększ. stosowania OZE na terenie GW. Cele szczegół.: CEL 1: Upowszechnienie techno. wytwarzania czystej energii wśród mieszk. poprzez powszechny montaż OZE na terenie gminy CEL 2: Redukcja zanieczyszczeń powietrza atmosf. poprzez zmniejsz. emisji gazów cieplarnianych do atmosfery CEL 3: Zmniejszenie obciążeń finans. mieszk. poprzez wykorz. OZE. REZULTATY: Dodatkowa zdolność wytwarzania energii ze ŹO poprzez montaż instalacji do podgrz. CWU o sum. mocy 0,41MW, Szacowany roczny spadek emisji gazów cieplarnianych-59,67 tCO2/rok, Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE-174,96 MWht/rok. P. realizuje cel prioryt. 4 jak i cel główn. RPO WL. P. wpis. się w cele operac. (2.5; 3.6; 4.5) wskaz. w SRWL 2014-2020. GW. Na podstawie PROGRAMU OCHRONY POWIETRZA DLA STREFY LUBELSKIEJ w GW nie stwierdzono przekroczenie choćby jednego poziomu dopuszczalnego lub docelowego w odniesieniu do substancji podlegających ocenie jakości powietrza. Jednakże działania przewidziane w P. przyczyniają się do realizacji działań naprawczych mających na celu poprawę stanu jakości powietrza zawartych w PROGRAMIE OCHRONY POWIETRZA DLA STREFY LUBELSKIEJ poprzez ograniczenie emisji pyłu PM10 z indywidualnych systemów grzewczych dzięki instalacji kolektorów słonecznych u odbiorców indywidualnych oraz działania promocyjne i edukacyjne. (Polish)
0 references
The project (P.) assumes installation of 104 units. set of solar panels (69 pcs. 2 panels with 3.4 kW each and 35 pcs. 3-panels with a power of 5.1 kW each) in the object. privat. for warming. CWU with a total power of 0,41 MW placed only on the roof or on the facade. P. also provides for the design and execution of the Internet portal, which will perform the functions of educator, promoc. and offers on-line services, SW execution service, Project Promotion, Supervision Inspector’s Service. Total number of bellows. GW benefiting (target GRUPA) from the results of the implementation of P. will amount to approx. 400 in 104 objects. The main purpose of P. is to increase the use of RES in GW. The objectives of the detail: OBJECTIVE 1: Dissemination of clean energy technology among residents through the general assembly of RES in the municipality of CEL 2: Reducing air pollutants atmosf. by reducing greenhouse gas emissions to the atmosphere CEL 3: Reduction of the financial burden. inhabitant. through roots. IT’S THE RES. RESULTS: Additional ability to generate energy from RES by installing installations for heating. CWU with a total capacity of 0,41 MW, Estimated annual decrease in greenhouse gas emissions-59.67 tCO2/year, The production of heat from newly built/new generation capacity of RES-174.96 MWht/year. P. pursues the priority objective. 4 as well as the target. RPO WL. P. entry. to the objectives of OPERAC. (2.5; 3.6; 4.5) indication. in SRWL 2014-2020. IT’S A GW. On the basis of the PROGRAM OF THE PARTICULAR FOR the Lublin STREFA, GW did not exceed even one acceptable or target level for substances subject to air quality assessment. However, the measures provided for in P. contribute to the implementation of corrective actions aimed at improving air quality contained in the PROGRAM OF THE PROGRAM OF THE STREF OF THE Lublin STREFA by reducing PM10 emissions from individual heating systems thanks to solar collector installations in individual recipients, as well as promotional and educational activities. (English)
17 October 2020
0 references
Identifiers
RPLU.04.01.00-06-0226/16
0 references