Renewable energy sources in the Gmina Trzydnik Duży — electricity and heat from the sun (Q104783): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of the purchase and installation of solar and photovoltaic installations for the production of heat and electricity from solar radiation in order to heat domestic hot water. Residents of the municipality of Thędk Duży do not benefit from RES. Only in several buildings solar collectors and panels are installed. The need to increase the share of RES in the fuel and energy balance in the municipality. The quality of air in th...) |
(Created claim: summary (P836): The subject of the project is the purchase and assembly of solar and photovoltaic installations for the production of heat and electricity from solar radiation to heat water in households. Residents of the municipality of Trzednik Large do not use RES. Only a few buildings have solar collectors and panels installed. It is necessary to increase the share of RES in the fuel and energy balance of the municipality. Air quality in the municipality is...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the purchase and assembly of solar and photovoltaic installations for the production of heat and electricity from solar radiation to heat water in households. Residents of the municipality of Trzednik Large do not use RES. Only a few buildings have solar collectors and panels installed. It is necessary to increase the share of RES in the fuel and energy balance of the municipality. Air quality in the municipality is good. There is no obligation for the municipality to develop an air protection programme. The POP for the Lublin area (to which the municipality belongs to the municipality) does not indicate corrective or short-term measures for the municipality, which means that the levels of substances subject to air quality assessment have not been exceeded. The problem is the low awareness of residents with limited resources of non-renewable energy resources and the use of RES, including solar energy. The shortage of technologies allowing the use of RES and high collector costs result in little interest in RES and changing existing ways of securing energy supply. Heat management is based on coal, coke and wood boiler plants, and cases of incineration of plastic waste are recorded. This translates into increasing energy consumption from conventional sources and emissions of harmful gases and dust into the air, which increases environmental pollution in the municipality and negatively affects the health of residents. Scope of the project: 1.Installation of solar installations in residential buildings 96 pcs. ); 2.Internet portal (on-line transaction service providing quick contacts with users of the installation); 3.application for mobile devices (for energy and environmental education of residents and promotion of RES 4. installation of photovoltaic installations on residential buildings 68 pcs. (English) | |||||||||||||||
Property / summary: The subject of the project is the purchase and assembly of solar and photovoltaic installations for the production of heat and electricity from solar radiation to heat water in households. Residents of the municipality of Trzednik Large do not use RES. Only a few buildings have solar collectors and panels installed. It is necessary to increase the share of RES in the fuel and energy balance of the municipality. Air quality in the municipality is good. There is no obligation for the municipality to develop an air protection programme. The POP for the Lublin area (to which the municipality belongs to the municipality) does not indicate corrective or short-term measures for the municipality, which means that the levels of substances subject to air quality assessment have not been exceeded. The problem is the low awareness of residents with limited resources of non-renewable energy resources and the use of RES, including solar energy. The shortage of technologies allowing the use of RES and high collector costs result in little interest in RES and changing existing ways of securing energy supply. Heat management is based on coal, coke and wood boiler plants, and cases of incineration of plastic waste are recorded. This translates into increasing energy consumption from conventional sources and emissions of harmful gases and dust into the air, which increases environmental pollution in the municipality and negatively affects the health of residents. Scope of the project: 1.Installation of solar installations in residential buildings 96 pcs. ); 2.Internet portal (on-line transaction service providing quick contacts with users of the installation); 3.application for mobile devices (for energy and environmental education of residents and promotion of RES 4. installation of photovoltaic installations on residential buildings 68 pcs. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the purchase and assembly of solar and photovoltaic installations for the production of heat and electricity from solar radiation to heat water in households. Residents of the municipality of Trzednik Large do not use RES. Only a few buildings have solar collectors and panels installed. It is necessary to increase the share of RES in the fuel and energy balance of the municipality. Air quality in the municipality is good. There is no obligation for the municipality to develop an air protection programme. The POP for the Lublin area (to which the municipality belongs to the municipality) does not indicate corrective or short-term measures for the municipality, which means that the levels of substances subject to air quality assessment have not been exceeded. The problem is the low awareness of residents with limited resources of non-renewable energy resources and the use of RES, including solar energy. The shortage of technologies allowing the use of RES and high collector costs result in little interest in RES and changing existing ways of securing energy supply. Heat management is based on coal, coke and wood boiler plants, and cases of incineration of plastic waste are recorded. This translates into increasing energy consumption from conventional sources and emissions of harmful gases and dust into the air, which increases environmental pollution in the municipality and negatively affects the health of residents. Scope of the project: 1.Installation of solar installations in residential buildings 96 pcs. ); 2.Internet portal (on-line transaction service providing quick contacts with users of the installation); 3.application for mobile devices (for energy and environmental education of residents and promotion of RES 4. installation of photovoltaic installations on residential buildings 68 pcs. (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 16:57, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renewable energy sources in the Gmina Trzydnik Duży — electricity and heat from the sun |
Project in Poland financed by DG Regio |
Statements
1,907,271.45 zloty
0 references
2,243,848.77 zloty
0 references
85.0 percent
0 references
27 April 2016
0 references
18 December 2020
0 references
GMINA TRZYDNIK DUŻY
0 references
Przedmiotem projektu jest zakup i montaż instalacji solarnych i fotowoltaicznych do produkcji energii cieplnej i elektrycznej z promieniowania słonecznego w celu podgrzewania ciepłej wody użytkowej w gospodarstwach domowych. Mieszkańcy gminy Trzydnik Duży nie korzystają z OZE. Jedynie w kilku budynkach zainstalowane są kolektory słoneczne i panele. Potrzebą jest zwiększenie udziału OZE w bilansie paliwowo-energetycznym na terenie gminy. Jakość powietrza w gminie jest dobra. Dla gminy nie ma obowiązku opracowania programu ochrony powietrza. W POP dla strefy lubelskiej (do której należy gmina Trzydnik Duży) nie wskazano działań naprawczych ani krótkoterminowych dla gminy, co oznacza że na jej terenie nie odnotowano przekroczenia poziomów substancji podlegających ocenie jakości powietrza. Problemem jest niska świadomość mieszkańców o ograniczonych zasobach nieodnawialnych surowców energetycznych i wykorzystaniu OZE, w tym energii słonecznej. Niedobór technologii pozwalających na wykorzystanie OZE i wysokie koszty kolektorów skutkują niewielkim zainteresowaniem OZE i zmianą dotychczasowych sposobów zabezpieczenia dostaw energii. Gospodarka cieplna oparta jest na kotłowniach opalanych węglem, koksem i drewnem, notuje się przypadki spalania odpadów plastikowych. Przekłada się to na rosnące zużycie energii ze źródeł konwencjonalnych i emisję szkodliwych gazów i pyłów do powietrza, co powoduje wzrost zanieczyszczenia środowiska w gminie i negatywnie wpływa na stan zdrowia mieszkańców. Zakres projektu: 1.montaż instalacji solarnych w budynkach mieszkalnych 96 szt. ); 2.portal internetowy (serwis do transakcji on-line zapewniający szybkie kontakty z użytkownikami instalacji); 3.aplikacja na urządzenia mobilne(w celu edukacji energetycznej i ekologicznej mieszkańców oraz promocji OZE 4. montaż instalacji fotowoltaicznych na budynkach mieszkalnych 68 szt. (Polish)
0 references
The subject of the project is the purchase and assembly of solar and photovoltaic installations for the production of heat and electricity from solar radiation to heat water in households. Residents of the municipality of Trzednik Large do not use RES. Only a few buildings have solar collectors and panels installed. It is necessary to increase the share of RES in the fuel and energy balance of the municipality. Air quality in the municipality is good. There is no obligation for the municipality to develop an air protection programme. The POP for the Lublin area (to which the municipality belongs to the municipality) does not indicate corrective or short-term measures for the municipality, which means that the levels of substances subject to air quality assessment have not been exceeded. The problem is the low awareness of residents with limited resources of non-renewable energy resources and the use of RES, including solar energy. The shortage of technologies allowing the use of RES and high collector costs result in little interest in RES and changing existing ways of securing energy supply. Heat management is based on coal, coke and wood boiler plants, and cases of incineration of plastic waste are recorded. This translates into increasing energy consumption from conventional sources and emissions of harmful gases and dust into the air, which increases environmental pollution in the municipality and negatively affects the health of residents. Scope of the project: 1.Installation of solar installations in residential buildings 96 pcs. ); 2.Internet portal (on-line transaction service providing quick contacts with users of the installation); 3.application for mobile devices (for energy and environmental education of residents and promotion of RES 4. installation of photovoltaic installations on residential buildings 68 pcs. (English)
17 October 2020
0 references
Identifiers
RPLU.04.01.00-06-0213/16
0 references