Construction of the sanitary sewage system and modernisation of the sewage treatment plant in the town of Ostrów Lubelski (Q105697): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The aim of the project is to improve the quality of life by providing appropriate health conditions to residents, entrepreneurs and tourists by increasing access to waste water treatment infrastructure. The project results in additional persons benefiting from an improved treatment of waste water (CI19), with 68 persons. The target groups shall be: Local residents of the municipality of Ostrów Lubelski divided into two groups: — already using...) |
(Created claim: summary (P836): The aim of the project is to improve the quality of life by providing adequate sanitary conditions for residents, entrepreneurs and tourists by increasing access to waste water treatment infrastructure. The project results in the number of additional people benefiting from improved waste water treatment (CI19) – 68 people. The target groups shall be: Residents of Ostrów Lubelski commune are divided into two groups: — already using sewage systems...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project is to improve the quality of life by providing adequate sanitary conditions for residents, entrepreneurs and tourists by increasing access to waste water treatment infrastructure. The project results in the number of additional people benefiting from improved waste water treatment (CI19) – 68 people. The target groups shall be: Residents of Ostrów Lubelski commune are divided into two groups: — already using sewage systems (part of Ostrów Lubelski, Bójki, Jamy) – after completing the project using solutions that ensure seamless reception of sewage (Gystniec estate in Ostrów Lubelski). Both groups will use an ecological point or points of processing. Tourists resting on the Municipal Lake in Ostrów Lubelski (interests) Entrepreneurs from Ostrów Lubelski, Bójki, Jamy (interests of the above) The task provides for the reconstruction of the existing sewage treatment plant and the construction of sanitary sewage system (detailed description in the feasibility study and extract from technical documentation). (English) | |||||||||||||||
Property / summary: The aim of the project is to improve the quality of life by providing adequate sanitary conditions for residents, entrepreneurs and tourists by increasing access to waste water treatment infrastructure. The project results in the number of additional people benefiting from improved waste water treatment (CI19) – 68 people. The target groups shall be: Residents of Ostrów Lubelski commune are divided into two groups: — already using sewage systems (part of Ostrów Lubelski, Bójki, Jamy) – after completing the project using solutions that ensure seamless reception of sewage (Gystniec estate in Ostrów Lubelski). Both groups will use an ecological point or points of processing. Tourists resting on the Municipal Lake in Ostrów Lubelski (interests) Entrepreneurs from Ostrów Lubelski, Bójki, Jamy (interests of the above) The task provides for the reconstruction of the existing sewage treatment plant and the construction of sanitary sewage system (detailed description in the feasibility study and extract from technical documentation). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project is to improve the quality of life by providing adequate sanitary conditions for residents, entrepreneurs and tourists by increasing access to waste water treatment infrastructure. The project results in the number of additional people benefiting from improved waste water treatment (CI19) – 68 people. The target groups shall be: Residents of Ostrów Lubelski commune are divided into two groups: — already using sewage systems (part of Ostrów Lubelski, Bójki, Jamy) – after completing the project using solutions that ensure seamless reception of sewage (Gystniec estate in Ostrów Lubelski). Both groups will use an ecological point or points of processing. Tourists resting on the Municipal Lake in Ostrów Lubelski (interests) Entrepreneurs from Ostrów Lubelski, Bójki, Jamy (interests of the above) The task provides for the reconstruction of the existing sewage treatment plant and the construction of sanitary sewage system (detailed description in the feasibility study and extract from technical documentation). (English) / qualifier | |||||||||||||||
point in time: 17 October 2020
|
Revision as of 16:55, 17 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of the sanitary sewage system and modernisation of the sewage treatment plant in the town of Ostrów Lubelski |
Project in Poland financed by DG Regio |
Statements
3,921,824.36 zloty
0 references
6,151,881.36 zloty
0 references
63.75 percent
0 references
1 July 2015
0 references
15 December 2019
0 references
GMINA OSTRÓW LUBELSKI
0 references
Celem projektu jest poprawa jakości życia poprzez zapewnienie właściwych warunków sanitarnych dla mieszkańców, przedsiębiorców i turystów poprzez zwiększenie dostępu do infrastruktury oczyszczania ścieków. Rezultatem projektu jest liczba dodatkowych osób korzystających z ulepszonego oczyszczania ścieków (CI19) - 68 osób. Grupami docelowymi są: Mieszkańcy gminy Ostrów Lubelski podzielni na dwie grupy: - już korzystający z kanalizacji (część miejscowości Ostrów Lubelski, Bójki, Jamy) - po zrealizowaniu projektu korzystający z rozwiązań zapewniających bezproblemowy odbiór ścieków (osiedle Gościniec w Ostrowie Lubelskim). Obie grupy będą korzystały z ekologicznego punktu lub punktów ich przetwarzania. Turyści wypoczywający nad Jeziorem Miejskim w Ostrowie Lubelskim (interesariusze zew.) Przedsiębiorcy z miejscowości Ostrów Lubelski , Bójki, Jamy (interesariusze wew.) Zadanie przewiduje przebudowę istniejącej oczyszczalni ścieków i budowę kanalizacji sanitarnej (szczegółowy opis w studium wykonalności i wyciągu z dokumentacji technicznej). (Polish)
0 references
The aim of the project is to improve the quality of life by providing adequate sanitary conditions for residents, entrepreneurs and tourists by increasing access to waste water treatment infrastructure. The project results in the number of additional people benefiting from improved waste water treatment (CI19) – 68 people. The target groups shall be: Residents of Ostrów Lubelski commune are divided into two groups: — already using sewage systems (part of Ostrów Lubelski, Bójki, Jamy) – after completing the project using solutions that ensure seamless reception of sewage (Gystniec estate in Ostrów Lubelski). Both groups will use an ecological point or points of processing. Tourists resting on the Municipal Lake in Ostrów Lubelski (interests) Entrepreneurs from Ostrów Lubelski, Bójki, Jamy (interests of the above) The task provides for the reconstruction of the existing sewage treatment plant and the construction of sanitary sewage system (detailed description in the feasibility study and extract from technical documentation). (English)
17 October 2020
0 references
Identifiers
RPLU.06.04.00-06-0081/15
0 references